Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARK.V ·

Arras Minerals Confirms Large “at Surface” Untested Porphyry System ON the Elemes Licence IN Kazakhstan

Exploration Programs

ARRAS MINERALS CONFIRMS LARGE “AT SURFACE” UNTESTED

PORPHYRY SYSTEM ON THE ELEMES LICENCE IN KAZAKHSTAN

February 22, 2024 TSX-V: ARK

Vancouver, British Columbia – Arras Minerals Corp. (TSX-V: ARK) (“Arras” or “the Company”) is pleased

to announce the initial results of its 2023 soil sampling program conducted over the Berezski Target

located within the Company’s Elemes 425 square kilometer (“km”) exploration licence (“Elemes” or the

“Licence”) in northeastern Kazakhstan. The Elemes licence is not included in the Teck-Arras Strategic

Exploration Alliance announced on December 7, 2023.

Highlights from the Soil Sampling program

 8.8 km x 1.5km NE-SW trending coherent copper (“Cu”) anomaly (>150ppm) linking two zones of

shallow (<298m) high-grade historical drilling that sit 5 km apart and include re-assayed results of

108m @ 0.94% CuEq (including 30.8m @ 2.21% CuEq), and 132.6m @ 0.80% CuEq (including

57.1m @ 1.00% CuEq) starting from surface.

 “Bull’s eye” 2.8 km x 1.6 km coherent Molybdenum (“Mo”) anomaly interpreted to be the core of

an at surface porphyry system that is untested with drilling.

 An Arsenic (“As”) peripheral to copper-molybdenum anomaly thought to be associated with an

intermediate-sulphidation epithermal system which recent sampling by Arras has returned gold

and silver grades up to 29g/t Au & 287g/t Ag.

 Results confirm a multi-kilometer-scale system, delimited by several mineralized zones which may

be contiguous under surface cover.

 Arras collected 31,000 soil samples over the Elemes Licence in 2023. The results presented in this

news release cover only the western half of the Elemes Licence and represent approximately 60%

of the soil samples collected. The results of the remaining 14,000 soil samples are expected in the

next 3 to 4 weeks.

Tim Barry, CEO of Arras Minerals stated, “The coherence and continuity of the copper soil anomaly over

8.8 kilometers is impressive. The results of our soil sampling program combined with widely spaced

historical drilling, some of which we have been able to re-assay, all points to a very large and intact

porphyry system that starts at surface and has unknown extent as it continues under recent cover to both

the northeast and southwest. The re-assay results we put out at the start of this year on some of the

historical shallow drillholes in the area show strong copper-gold mineralization grading up to 0.94% CuEq

over 108m, and 0.80% CuEq over 132.6 meters, ending in mineralization in some cases. What is even more

exciting is that in addition to the copper soil anomaly, our soil results were also able to delineate a 2.8

kilometer by 1.6 kilometer “bull’s eye” molybdenum anomaly that has yet to be drill tested. The

significance of the molybdenum is that it may point towards the core of the porphyry which typically holds

high grade copper and gold mineralization. In summary, we now have a confirmed second large porphyry

system within our extensive licence package in NE Kazakhstan.”

2

Figure 1. Drone photo showing outcropping argillic alteration at Berezski Central target (Elemes Licence)

Figure 2. The 8.8 km copper soil anomaly identified by Arras within the Elemes Licence. Also shown are the results of the re-

assayed historical drillholes located at Quartzite-Gorka and Berezski East announced by Arras on 8 January 2024, and 22

January 2024 respectively. The location of the medium sulphidation epithermal system sampled by Arras and announced on

11 July 2023 is also shown. Lastly a wide zone of intense kaolinite alteration at Berezski Central is also shown that is co-

incident with the strong molybdenum anomaly that has been identified and shown in Figure 4.

3

Figure 3. Soil anomaly maps showing copper results and the alteration map. Also shown are the locations of the re-assayed drillholes located at Quartzite-Gorka and

Berezski East as well as Karagandy-Ozek, a high-grade gold-silver epithermal zone. The intensely altered Berezski Central zone is also shown which is co-incident with

the 2.8 kilometer x 1.6 kilometer molybdenum soil anomaly (see figure 4).

4

Figure 4. Soil anomaly maps showing molybdenum, and arsenic results. Also shown are the locations of the re-assayed drillholes located at Quartzite-Gorka and

Berezski East as well as Karagandy-Ozek, a high-grade gold-silver epithermal zone. The intensely altered Berezski Central zone is also shown which is co-incident with

the 2.8 kilometer x 1.6 kilometer molybdenum soil anomaly.

5

The Soil Sampling Program: In 2023, a comprehensive soil sampling program was undertaken across the

Elemes Licence area. This program specifically targeted the well-developed "B soil horizon" utilizing a 50-

meter sample interval and 200-meter line spacing grid. A total of approximately 31,000 samples were

collected.

This press release announces the findings from the initial batch of 17,000 samples, which cover an area

of 189.3 sq. km (approximately 11.5 km by 18.2 km) situated on the western side of the Elemes Licence.

The results from the remaining 14,000 samples, covering the eastern portion of the Elemes Licence, are

anticipated to be available within the next 3 to 4 weeks.

The soil analysis was conducted utilizing a Portable X-ray fluorescence device ("pXRF"), a widely employed

instrument for determining the elemental composition of samples. Due to the limited sampling area of

the pXRF, the results presented in this release are considered "indicative" rather than fully quantitative

regarding mineralization.

Despite this limitation, the results have revealed a substantial and coherent copper-in-soil anomaly, with

copper concentrations exceeding 150 ppm. Background copper in the area is considered to be less than

20 ppm. This anomaly stretches over a remarkable distance of more than 8.8 km from north to south and

extends to approximately 1.5 km in width from east to west. Notably, it connects the Quartzite_Gorka

and Berezski East historical drilling areas, which are situated over 5 km apart. These areas have previously

confirmed high-grade porphyry copper-gold mineralization starting at the surface.

The continuity of the copper soil anomaly strongly suggests that the Quartzite-Gorka and Berezski-East

areas represent only a small part of a much larger porphyry copper-gold system.

Re-Assay of Historical Core: The Quartzite-Gorka and Berezski East areas were drilled between 2007 and

2010. All available drill-core have been re-logged in detail by Arras for lithology, structure, alteration, and

mineralization. The mineralization seen at both locations is interpreted to be the upper part of a porphyry

copper-gold mineralizing system. The mineralization comprises of sheeted and/or stockwork veining of

quartz-magnetite “A” veins with minor chalcopyrite-bornite ± k-feldspar halos; magnetite-only “M” veins;

and quartz-chalcopyrite veins. Locally disseminated patches of chalcopyrite, bornite and pyrite occur.

Anhydrite veins and late epidote-carbonate veins are also observed. The host diorite intrusion is fine-

grained, equigranular and typically highly magnetic. Strong potassic (k-feldspar-quartz-magnetite-

secondary biotite) alteration of the host diorite has been variably overprinted by intermediate argillic

(illite-chlorite) alteration.

Arras also sent 6 holes, three each from Quartzite-Gorka and Berezski-East for re-assay. The summarized

results of these re-assays are provided in Table 1 below and were disclosed in news releases on January

8, 2024, and January 22, 2024, respectively. Notably, the findings showcased zones of exceptionally high-

grade mineralization, including sections measuring 30.8 meters grading 2.21% CuEq and 62 meters

grading 1.53% CuEq. For further details, please visit www.arrasminerals.com.

6

Table 1. Summary table for the re-assay of historical drill holes for Quartzite-Gorka and Berezski-East

Notes: Copper Equivalent (“CuEq”) grades reported for the drill holes at Quartzite Gorka were calculated using the following formula: CuEq % =

Copper (%) + (Gold (g/t) x 0.8264) + (Silver (g/t) x 0.0107) + (Molybdenum (ppm) x 6.0000). Gold Equivalent (“AuEq”) grades reported for the drill

holes at Quartzite Gorka were calculated using the following formula: AuEq g/t = Gold (g/t) + (Copper (%) x 1.2100) + (Silver (g/t) x 0.0129) +

(Molybdenum (ppm) x 4.0334). Assumptions used for the copper and gold equivalent calculations were metal prices of US$3.00/lb. Copper,

US$1,700/oz Gold, US$22/oz Silver, US$18/lb. Molybdenum, and metallurgical recoveries were assumed to be 90% for Cu and Au and 50% for

Ag and Mo. Intervals are core-length weighted and original core recovery is estimated to be > 90 %.

The Berezski Target: is located within the 425 square km Elemes mineral exploration licence. The Licence

benefits from excellent modern infrastructure and ease of accessibility, being located only 20 km from

Arras’ operational base in the city of Ekibastuz, northeastern Kazakhstan. A paved highway runs through

the licence, and within 1 km of the Berezski target. 1100 KVA power lines and heavy rail all lie within a 15

km radius of the project.

The Berezski target is located within the Bozshakol-Chingiz metallogenic belt that also hosts the Beskauga

porphyry copper-gold-silver project approximately 80 km to the east, and KAZ Minerals’ Bozshakol

porphyry copper-gold mine (www.kazminerals.com) approximately 60 km to the northwest.

7

Figure 5. Arras’s License Package showing Arras-Teck Strategic Alliance Areas as “Package A” and “Package B” as well as the Elemes, Aimandai, Stepnoe, & Ekidos

licences which are 100% owned by Arras.

8

Sampling Methodology

Samples were collected on a 50m (East-west) by 200m (north-south) grid spacings. Samples were

collected from hand-dug pits, trying to consistently sample the B horizon. Approximately 500 grams of

material was collected and sieved (5mm mesh size) to review larger particles and organic matter.

Following collection, the samples were bagged, dried, and analyzed by the company with a Portable Niton

XL5 X-ray fluorescence analyzer at the company’s core storage facility in Ekibastuz.

Assay, QAQC Procedures:

Analysis was conducted using the company’s two Niton XL5 portable XRF units. Units were calibrated at

the start and end of each work shift as well as after every 100 samples to verify accuracy. In addition, a

measurement from a certified reference material was taken every 20 measurements to ensure accuracy

and repeatability of data. In addition, prior to commencement of the measurements, 100 duplicate

samples were analyzed using both units to confirm that both units were producing accurate results and

that no bias was present in either of the units.

All soil material is stored at Arras’ warehouse in Ekibastuz, and the company plans to send a proportion

of these samples to ALS Chemex in Karaganda, Kazakhstan for reanalysis with a 4-acid digest ICP-MS61

analysis and for trace gold analysis (using Au-ST43).

Qualified Person: The scientific and technical disclosure for the Elemes Project included in this news

release has been prepared under supervision of and approved Tim Barry, Chief Executive Officer, and

Director of Arras Minerals Corp., who is also a Member and Chartered Professional Geologist (MAusIMM

CP(Geo)) of the Australasian Institute of Mining and Metallurgy. Mr. Barry has sufficient experience,

relevant to the styles of mineralization and type of deposits under consideration and to the activity that

he is undertaking, to qualify as a Qualified Person (“QP”) for the purposes of National Instrument 43-101

Standards of Disclosure of Mineral Projects (“NI 43-101”).

On behalf of the Board of Directors

"Tim Barry"

Tim Barry, MAusIMM CP(Geo)

Chief Executive Officer and Director

INVESTOR RELATIONS:

+1 604 687 5800

[email protected]

Further information can be found on the Company’s website https://www.arrasminerals.com

or follow us on LinkedIn: https://www.linkedin.com/company/arrasminerals or on X, formerly

known as Twitter: https://twitter.com/arrasminerals