Gran Colombia Gold Announces the Discovery of a Potential New High-Grade Zone at Its Marmato Project Outside the Deeps Zone; Reports Additional Higher -Grade Gold Intercepts Completing 2019 Phase 2 Drilling in the Deeps Zone

Drill Results

Gran Colombia Gold Announces the Discovery of a Potential New High-Grade

Zone at Its Marmato Project Outside the Deeps Zone; Reports Additional Higher

-Grade Gold Intercepts Completing 2019 Phase 2 Drilling in the Deeps Zone

Including 75.83 Meters at 4.03 g/t Au in Drill Hole MT-IU-051

TORONTO, Feb. 03, 2020 -- Gran Colombia Gold Corp. (TSX: GCM; OTCQX: TPRFF) announced today additional higher-grade

gold intercepts over broad widths from the final eight diamond drill holes (3,744 meters) drilled in the Marmato Deeps Zone

(“MDZ”) completing the 2019 Phase 2 infill drilling program (the “2019 drilling campaign”) at its Marmato Project in Caldas,

Colombia. The 2019 drilling campaign was split into two phases, of which the results of the Phase 1 drilling campaign were

included in the updated Mineral Resource estimate with an effective date of July 31, 2019 and the preliminary economic

assessment (“PEA”) for Marmato, both of which were included in a technical report filed on SEDAR on November 28, 2019.

The subsequent Phase 2 infill drilling, above the 600 meter level, was designed to provide enough tonnes and grade in the

Measured and Indicated mineral resource categories within the Main Zone (“MZ”) to support the prefeasibility study (“PFS”)

which is currently being carried out and is expected to be finalized by mid-2020.

High-grade mineralization was also encountered in a new zone (“NZ”) in the footwall of the MDZ in hole MT-IU-050 and is

anticipated to be accretive to overall global resource growth as this mineralization lies either outside the boundary of the

current mineral resource estimate block model for the MZ or in areas that were previously estimated to be below the cut-off

grade due to lack of information.

Serafino Iacono, Executive Chairman of Gran Colombia, commented, “Our 2019 Phase 2 drilling campaign has generated

additional exciting results which have further increased our confidence in the geological model and continues to demonstrate

an improvement of grades in the MZ below the 900 meter level versus the mineral resource block model associated with the

PEA. In addition, the discovery of a potential new high-grade zone opens a new scenario for potential resource growth. All in

all, we remain very encouraged by the progress we are making in the evaluation of the underground mining expansion

opportunity at our Marmato Project."

The 2019 drilling campaign started in March and was completed in late November with three contractor diamond drill rigs, one

of which was added to the Phase 2 drilling campaign in early September, operating from four purpose-built underground drill

stations. The two drilling campaigns comprise a total of 30 drill holes totaling approximately 16,299 meters, of which 4,600

meters were completed in seven drill holes in Phase 1 and 11,699 meters were completed in 23 drill holes in Phase 2.

The Company plans to drill up to 15,000 meters in 2020 commencing toward the end of February. Approximately 10,000

meters of infill drilling is designed to convert Inferred mineral resources to the Indicated category and to add additional mineral

resources by stepping out along the southeast extension of the MZ. Another approximately 5,000 meters of exploration drilling

will focus on broad mineralized zone targets outside the MDZ.

Intersections with high gold grades generated from the last eight drill holes of Phase 2 drilling reported herein (MT-IU-046 to MT

-IU-052 and MT-IU-054), include:

• Drill hole MT-IU-050 which intersected 54.42 m at 3.65 g/t Au and 4.3 g/t Ag from 246.75 m to 301.17 m, 51.80 m at

3.0 g/t Au and 6.0 g/t Ag from 379.3 m to 431.10 m, and 41.35 m at 4.14 g/t Au and 4.34 g/t Ag from 449.0 m to

490.35m; all these intersections are associated with the MZ.

• Drill hole MT-IU-050 also intersected 76.75 m at 3.12 g/t Au and 1.9 g/t Ag from 538.25 m to 615.00 m, which is the

intersection associated with the NZ.

• Drill hole MT-IU-051 which intersected 75.83 m at 4.03 g/t Au and 5.5 g/t Ag from 248.00 m to 323.83 m.

• Drill hole MT-IU-054 which intersected 66.35 m at 3.05 g/t Au and 3.9 g/t Ag from 358.00 m to 424.35 m.

The style of mineralization for the intersection associated with the NZ is the same as the MZ and is characterized by very

narrow veinlets of quartz-pyrrhotite-bismuth tellurides-free gold with minor amounts of pyrite and chalcopyrite rimmed by a

narrow halo of sodic-calcic alteration.

Key Highlights and Intercepts from Phase 2 drilling

• The high-grade mineralization intercepted in drill hole MT-IU-050, outside the boundary of the current mineral resource

estimate block model for the MZ, may represent a new zone (NZ) or a branch off the MZ. Further drilling in this area is

required and is planned as part of the 2020 drilling program;

• The drill intercepts (MT-IU-050, MT-IU-051 and MT-IU-054) from Phase 2 drilling continue to demonstrate a further

improvement of grades in the MZ below the 900 meter level versus the mineral resource block model associated with

the PEA;

• The results from Phase 2 infill drilling continue to impress both in terms of grades and widths and will undoubtedly lead

to an important resource growth coupled with a greater flexibility for mining;

• Most of the drill holes of Phase 2 reported herein end within the low-grade shell with the result that the MDZ is open on

the east side. This is due to the location of underground drill stations above and close to the steeply plunging low grade

shell. The holes achieved their objective of fully cutting the high grade MZ.

The following table is a list of significant intersections from the last eight drill holes (MT-IU-046 to MT-IU-054) of Phase 2 drilling

reported in this release that, combined with the fourteen drill holes included in the press release issued on November 15 th,

2019, will support the PFS level resources and reserves statement:

Hole ID From (m) To (m) Width (m) Au Grade

(g/t)

Ag Grade

(g/t)

Grade-

Width

Au (g/t

*m)

Zone

MT-IU-032 334.46 682.75 348.29 1.53 3.1 534 Deeps

including 334.46 391.03 56.57 1.54 4.9 87 Deeps

including 391.03 416.08 25.05 2.55 5.9 64 Deeps

including 438.32 463.05 24.73 2.03 4.1 50 Deeps

including 495.00 524.45 29.45 1.76 5.2 52 Deeps

including 566.75 601.40 34.65 2.31 2.1 80 Deeps

including 623.40 646.10 22.70 2.21 1.4 50 Deeps

including 663.10 682.75 19.65 2.56 1.2 50 Deeps

MT-IU-033 287.35 707.25 419.90 1.84 2.4 774 Deeps

including 287.35 334.00 46.65 2.31 7.1 108 Deeps

including 402.55 447.55 45.00 3.37 2.8 151 Deeps

including 456.60 494.00 37.40 2.72 2.2 102 Deeps

including 580.80 612.00 31.20 3.16 1.8 99 Deeps

including 634.30 652.80 18.50 3.00 2.1 55 Deeps

MT-IU-034 314.05 501.00 186.95 1.34 2.3 251 Deeps

including 419.65 465.75 46.10 2.58 2.7 119 Deeps

MT-IU-035 149.10 305.73 156.63 1.27 3.5 199 Deeps

including 177.05 199.95 22.90 2.55 4.2 58 Deeps

MT-IU-036 365.25 670.60 305.35 2.74 2.9 836 Deeps

including 365.25 429.95 64.70 4.66 6.4 301 Deeps

including 469.00 490.60 21.60 3.55 2.4 77 Deeps

including 531.10 670.60 139.50 2.48 2.0 346 Deeps

MT-IU-037 208.93 326.35 117.42 1.82 2.8 214 Deeps

including 208.93 255.85 46.92 2.53 2.1 119 Deeps

including 286.90 310.25 23.35 2.16 4.6 50 Deeps

MT-IU-038 255.25 501.25 246.00 2.03 3.0 499 Deeps

including 280.30 300.15 19.85 3.19 3.5 63 Deeps

including 334.70 404.05 69.35 3.16 4.0 219 Deeps

MT-IU-039 204.35 356.20 151.85 1.78 3.1 271 Deeps

including 218.50 237.00 18.50 2.70 5.5 50 Deeps

including 253.05 294.70 41.65 2.50 3.1 104 Deeps

including 314.45 332.30 17.85 2.09 4.2 37 Deeps

MT-IU-040 186.80 337.65 150.85 2.00 4.4 302 Deeps

including 224.60 260.45 35.85 3.40 9.3 122 Deeps

including 260.45 295.30 34.85 2.56 2.7 89 Deeps

MT-IU-041 189.07 452.70 263.63 2.84 4.9 748 Deeps

including 226.94 401.90 174.96 3.86 6.0 675 Deeps

including 226.94 300.57 73.63 5.72 8.8 421 Deeps

including 300.57 333.25 32.68 1.46 4.5 48 Deeps

including 333.25 401.90 68.65 3.00 3.9 206 Deeps

MT-IU-042 286.75 379.20 92.45 1.00 1.7 92 Deeps

MT-IU-043 NSI            

MT-IU-044 229.88 501.30 271.42 1.04 1.8 282 Deeps

including 421.50 434.70 13.20 2.73 2.0 36 Deeps

including 467.20 484.45 17.25 2.80 2.9 48 Deeps

MT-IU-045 195.25 607.15 411.90 2.06 4.8 849 Deeps

including 230.30 302.00 71.70 3.50 5.3 251 Deeps

including 420.10 504.85 84.75 3.21 8.7 272 Deeps

including 563.50 607.15 43.65 1.92 2.3 84 Deeps

MT-IU-046 150.70 220.15 69.45 1.89 4.5 131 Deeps

including 191.25 220.15 28.90 2.81 4.4 81 Deeps

MT-IU-047 NSI            

MT-IU-048 115.90 486.55 370.65 1.35 2.8 500 Deeps

including 152.85 206.00 53.15 2.19 6.2 116 Deeps

including 288.86 327.70 38.84 1.91 3.3 74 Deeps

including 414.00 453.00 39.00 2.39 2.4 93 Deeps

MT-IU-049 132.15 324.25 192.10 1.51 4.7 291 Deeps

including 162.15 206.10 43.95 2.69 8.3 118 Deeps

including 214.41 232.30 17.89 2.76 3.6 49 Deeps

including 254.15 276.45 22.30 2.13 6.4 48 Deeps

MT-IU-050 226.75 696.25 469.50 2.29 3.2 1075 Deeps

including 246.75 301.17 54.42 3.65 4.3 199 Deeps

including 379.30 431.10 51.80 3.00 6.0 155 Deeps

including 449.00 490.35 41.35 4.14 4.3 171 Deeps

including 538.25 615.00 76.75 3.12 1.9 239 Deeps

MT-IU-051 188.40 351.70 163.30 2.81 5.2 459 Deeps

including 205.50 233.05 27.55 2.63 7.0 72 Deeps

including 248.00 323.83 75.83 4.03 5.5 306 Deeps

including 333.15 351.70 18.55 2.53 3.3 47 Deeps

MT-IU-052 271.60 429.37 157.77 2.14 3.3 337 Deeps

including 271.60 297.40 25.80 2.57 5.5 66 Deeps

including 310.30 375.20 64.90 2.76 3.9 179 Deeps

MT-IU-053A Results pending            

MT-IU-054 260.10 424.35 164.25 2.58 2.9 424 Deeps

including 260.10 322.75 62.65 2.91 2.0 182 Deeps

including 358.00 424.35 66.35 3.05 3.9 202 Deeps

All are underground drill holes. They were drilled at -38 to -74 degrees from the horizontal, and the intersection lengths do not

represent true widths. Sample lengths are on average 1.50 meters long but may be varied for geological and recovery factors.

Intersections were calculated using a cut-off grade of 0.5 g/t gold, and no more than 5.0 m of continuous internal dilution for

intervals up to 50 m, no more than 10 m of continuous internal dilution for intervals of 50-200 m, and no more than 20 m of

continuous internal dilution for intervals greater than 201 m. Gold grades were capped at 13.0 g/t gold which affects 14

samples of a total of 1960 samples. Intervals greater than or equal to 1.0 g/t are reported. NSI means no significant intervals.

Grade-width is calculated as the width of the drill intersection in meters multiplied by the Au grade in g/t.

Please refer also to the attached illustrative images in Attachment 1 showing a longitudinal section of the higher-grade MZ

zone at a cut-off grade of 1.7 g/t Au and Attachment 2 showing a cross-section of the intersection of drill hole MT-IU-050

outside the current mineral resources model for the MZ.

Qualified Person

Dr. Stewart D. Redwood, PhD, FIMMM, Senior Consulting Geologist to the Company, is a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure or Mineral Projects and prepared or reviewed the preparation of the

scientific and technical information in this press release. Verification included a review of the quality assurance and quality

control samples, and review of the applicable assay databases and assay certificates.

Quality Assurance and Quality Control

The Marmato Project core samples were prepared by SGS Laboratories Ltd (ISO 9001:2008) at their laboratory in Medellin,

and assayed in their laboratory in Segovia, Colombia. Gold was assayed by 30 g fire assay with atomic absorption

spectrophotometer (“AAS”) finish. Samples over 10.0 g/t gold were re-assayed by 30 g fire assay with gravimetric finish. Silver

was assayed by aqua regia digestion and AAS finish. Blank, standard and duplicate samples were routinely inserted for

quality assurance and quality control.

About Gran Colombia Gold Corp.

Gran Colombia is a Canadian-based mid-tier gold producer with its primary focus in Colombia where it is currently the largest

underground gold and silver producer with several mines in operation at its Segovia and Marmato Operations. Gran Colombia is

continuing to focus on exploration, expansion and modernization activities at its high-grade Segovia Operations and, through a

spin out transaction with Bluenose Gold Corp. announced on October 7, 2019, Gran Colombia is progressing toward a major

expansion and modernization of its underground mining operations at the Marmato Project.

Additional information on Gran Colombia can be found on its website at www.grancolombiagold.com and by reviewing its

profile on SEDAR at www.sedar.com.

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information", which may include, but is not limited to, statements with respect to

anticipated business plans or strategies, including exploration programs and mineral resources and reserves. Often, but not

always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget",

"scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of

such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken,

occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements of Gran Colombia to be materially different from any future

results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause

actual results to differ materially from those anticipated in these forward-looking statements are described under the caption

"Risk Factors" in the Company's Annual Information Form dated as of March 27, 2019 which is available for view on SEDAR

at www.sedar.com. Forward-looking statements contained herein are made as of the date of this press release and Gran

Colombia disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a

result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or

otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place

undue reliance on forward-looking statements. 

For Further Information, Contact:

Mike Davies

Chief Financial Officer

(416) 360-4653

[email protected]

A photo accompanying this announcement is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/9e0b03cf-67d4-4d4c-8a3b-32fca43768b9

A photo accompanying this announcement is available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/38aa7ec4-5bfd-4ef2-b714-3ecfe861ab10