Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARIS.TO ·

Gran Colombia Gold Announces High-grade Drill Results From the Ongoing 2020 Drilling Campaigns at Its Segovia Operations, Including the Discovery of a New High-grade Zone Down-dip at Its Fourth Mine Carla

Drill Results

Gran Colombia Gold Announces High-grade Drill Results From the Ongoing

2020 Drilling Campaigns at Its Segovia Operations, Including the Discovery of

a New High-grade Zone Down-dip at Its Fourth Mine Carla

TORONTO, July 20, 2020 -- Gran Colombia Gold Corp. (TSX: GCM, OTCQX: TPRFF) announced today high-grade intercepts

from the latest 72 diamond drill holes totaling 10,523 meters (approximately 33%) of the 2020 in-mine and near-mine drilling

programs at its Segovia Operations. The Company also announced the assay results from three additional kick-off diamond

drill holes (1,707 meters) from the ongoing directional drilling program at the El Silencio Deep Zone. High-grade intercepts from

eight diamond drill holes (594 meters) carried out by the Company’s Mine Geology Department are also included in this press

release as they provide and corroborate information of interest for current and future development on different sectors of the

Providencia and El Silencio mines.

Significant high-grade intercepts from the latest drill results include:

• Providencia: 111.79 g/t Au over 0.95 meters (PV-GM-U02-19);

• Sandra K: 45.63 g/t Au with 78.4 g/t Ag over 0.50 meters on the Sandra K Techo Vein (SK-IU-140);

• Sandra K: 34.13 g/t Au with 182.7 g/t Ag over 0.48 meters on the 6640 Vein (SK-IU-138);

• El Silencio: 70.13 g/t Au and 184.1 g/t Ag over 0.99 meters on the 1180 Vein (ES-IU-116);

• El Silencio: 12.32 g/t Au and 13.4 g/t Ag over 0.38 meters on the Nacional Vein (ES-MH07-01);

• El Silencio: 29.66 g/t Au and 41.6 g/t Ag over 0.72 meters on the Manto Vein (ES-MH07-01); and,

• Carla: 59.29 g/t Au and 48.6 g/t Ag over 0.66 meters on the Gran Colombia Vein (CA-ES-016).

Serafino Iacono, Executive Chairman of Gran Colombia, commented, “Our 2020 drilling programs in Segovia are continuing to

provide us with expected results, confirming that the Segovia Operations are a world-class gold system, both in terms of its

size and high grades. The grades and widths in the Sandra K results continue to impress and are expected to lead to mineral

resource growth coupled with a greater flexibility for mining. At Carla, our fourth mine which is coming into production later this

year, drilling intercepted high-grade mineralization down-dip below the existing underground mine development confirming a

high-grade intercept from a prior drilling program. With the deep drilling at the El Silencio mine continuing to return high-grade

intercepts from both main structures, the Nacional and Manto veins, we remain confident that we will be able to expand

mineral resources at Segovia and add to the mine life for this project. Over the last several months, our target generation team

has been working in a data processing and prospectivity analysis to aid in establishing future drilling targets at Segovia, both

near the existing mine areas as well as brownfield exploration away from the main mines. We will start testing by drilling some

of the most prospective targets over the next couple of months".

The planned 2020 in-mine and near-mine infill drilling campaigns commenced in early January with six diamond drill rigs

operating from purpose-built underground and surface drill stations and comprise a total of 159 drill holes totaling

approximately 31,400 meters or about 70% of the total drilling program for this year. The development of the planned drilling

programs has been somewhat hampered by the restrictions resulting from the COVID-19 pandemic that has resulted in

logistical difficulties and schedule disruptions.

The other 30% of the planned drilling campaign for 2020 is focused on the regional exploration targets encompassing the 24

veins within the Segovia title not currently in production. As a result of COVID-19 limitations to access these areas, this

portion of the program has been delayed until the second half of the year and the Company expects to complete

approximately 50% of its original plan for these targets.

Key Highlights

Providencia

A short campaign of in-mine exploration drilling from underground station PV5380, located on Level 15 and installed on

Sill15_04B, was designed on a nominal 10m x 10m drill spacing to test the intersection of the shallow-dipping Providencia

Vein with the steeply-dipping 14 Fault, interpreted as a zone of high-grade gold over unknown intervals. Drill hole PV-GM-U02-

19 intercepted high-grade mineralization with maximum grades of 111.79 g/t Au over 0.95 meters at the predicted

intersection, which proves the presence of high-grade gold mineralization over narrow widths. The high-grade mineralization

remains open down plunge. A phase of definition drilling is being designed to incorporate this area into the current mine plan.

Sandra K

In-mine infill drilling from underground station SK5675, located at the northernmost end of Level 3, currently in progress, has

continued to delineate and further extend down-plunge, to approximately Level 7, one of the main ore-shoots outlined by

mining in the upper levels of the existing operation. This orebody remains open at depth and offers the potential for additional

mineral resource growth and extension of the mine life. Multiple high gold grades were intersected from 22 drill holes (3,343

meters) on the main vein system with maximum intersection grades of 45.63 g/t Au with 78.4 g/t Ag over 0.50 meters on

the Sandra K Techo Vein (SK-IU-140) and 34.13 g/t Au with 182.7 g/t Ag over 0.48 meters on the 6640 Vein. As a result,

Gran Colombia will carry out an additional approximately 4,300 meters of in-fill drilling at Sandra K in 2020, to be completed by

the end of the year, to test the extension of all of the main ore-shoots further down plunge.

El Silencio

In-fill exploration drilling from underground station ES6180, installed off the North ramp, was completed on the recently

discovered high-grade vein called the 1180 Vein, which is a shallow-dipping structure located between the Manto and 1040

veins. Two additional high gold grade intercepts were intersected from 12 drill holes (1,593 meters) drilled from the same

underground station (ES6180) on the main vein system with maximum intersection grades of 70.13 g/t Au and 184.1 g/t Ag

over 0.99 meters on the 1180 Vein (ES-IU-116). A small delineation drilling program was also run by the Company’s Mine

Geology Department to complement the in-fill exploration drilling, with maximum grades of 89.69 g/t Au over 0.55 meters on

the 1180 Vein (ES-GM-U11-20). High-grade mineralization associated with the 1180 Vein remains open down-along plunge

and will be targeted by in-fill drilling in late 2020. As the 1180 Vein is in proximity of the North ramp, it will be incorporated into

the El Silencio mine plan and the Company expects that it will be able to begin mining the vein as early as the third quarter of

2020.

The ongoing directional drilling program on the El Silencio Deep Zone is targeted to better delineate the southern ore-shoots

down-plunge below Level 40. Drilling on the southern ore-shoot was successful in confirming the continuity and high-grade

nature of both the Nacional and Manto veins down-dip relative to Level 40, the deepest level of historical mining on the Manto

Vein by Frontino Gold Mines. Drill hole ES-MH07-01 returned 12.32 g/t Au and 13.4 g/t Ag over 0.38 meters on the Nacional

Vein and 29.66 g/t Au and 41.6 g/t Ag over 0.72 meters on the Manto Vein.

The Company’s Mine Geology Department also carried out a small exploration drilling program from station ES NV40, located

on Level 40, to test the presence of broad zones of mineralization on the central ore shoot previously intersected by directional

drilling. Multiple intervals of veins with maximum intersection grades of 6.04 g/t Au over 2.85 meters, including 13.47 g/t Au

over 0.50 meters (ES-GM-U02-20), were intercepted on the Nacional Vein.

There is still about 1,500 m to be drilled to complete the planned directional drilling program, which is scheduled to be

completed as early as the third quarter of 2020.

Carla

Seventeen diamond drill holes were completed at Carla from three purpose-built surface drill stations, as part of a systematic

drilling program targeting the central and southern portions of the Gran Colombia Vein system, with the objective of converting

Inferred mineral resources to the Indicated mineral resource category to be able to provide future mining studies with

reasonable levels of confidence. The Gran Colombia Vein is a northerly-trending master vein with a continuous strike of more

than 700 meters and a vertical depth drilled for about 250 meters on which a small-scale underground mining operation was

developed in the past.

Two high-grade intersections were encountered approximately 150 meters below the existing underground mine development

with maximum grades of 59.29 g/t Au and 48.6 g/t Ag over 0.66 meters on the Gran Colombia Vein. The high-grade

mineralization remains open along strike and down dip. Importantly, these intercepts are of significantly higher gold grade than

the current Indicated and Inferred mineral resource estimates. Additional drill holes are currently in progress to further test the

high-grade portion of the Gran Colombia Vein. Assay results will be reported in due course.

The table below lists the key intercepts from the ongoing 2020 drilling campaign since the press release issued on February

24, 2020:

Hole From (m) To (m) Width (m) Au (g/t) Ag (g/t) Vein

PROVIDENCIA MINE

U-G Drilling station PV5380

PV-GM-U01-19* 1.10 1.30 0.20 76.04 *** PRO

PV-GM-U02-19* 0.00 1.20 1.20 63.66 *** PRO

PV-GM-U02-19* 17.05 18.00 0.95 111.79 *** FLT-14

PV-GM-U03-19* 0.00 0.42 0.42 26.00 *** PRO

SANDRA K MINE

U-G Drilling station SK5675

SK-IU-131* 90.88 93.51 2.63 9.46 464.4 SKT

including 91.37 92.35 0.98 22.46 1041.5 SKT

SK-IU-132* 105.00 106.90 1.90 2.79 17.7 SKT

Including 105.00 105.46 0.46 8.51 45.7 SKT

SK-IU-133* 66.31 66.68 0.37 15.03 676.0 6640

SK-IU-136* 166.05 167.70 1.65 13.22 40.0 SKT

Including 166.05 166.6 0.55 38.96 112 SKT

SK-IU-138* 106.30 106.78 0.48 34.13 182.7 6640

SK-IU-138* 179.57 182.42 2.85 2.67 18.7 SKT

Including 181.59 182.42 0.83 7.49 45.1 SKT

SK-IU-140* 172.40 175.40 3.00 9.07 41.5 SKT

Including 174.9 175.4 0.50 45.63 78.4 SKT

SK-IU-141* 159.62 161.46 1.84 25.39 22.3 SKT

SK-IU-143* 125.00 128.20 3.20 5.44 8.4 SKT

Including 125.5 125.93 0.43 13.65 3.8 SKT

SK-IU-144* 163.75 167.20 3.45 6.24 30.0 SKT

Including 163.75 164.24 0.49 34.22 129.0 SKT

SK-IU-146* 116.94 118.53 1.59 3.75 385.8 SKT

including 118.1 118.53 0.43 13.73 1418.0 SKT

EL SILENCIO MINE

U-G Drilling station ES6180

ES-IU-113* 82.17 82.67 0.50 24.15 99.0 1180

ES-IU-116* 75.17 76.16 0.99 70.13 184.1 1180

U-G Drilling station ES6150

ES-GM-U07-20* 79.70 80.00 0.30 18.24 *** 1180

ES-GM-U11-20* 93.55 94.60 1.05 48.47 *** 1180

including 94.05 94.60 0.55 89.69 ***  

ES-GM-U12-20* 92.00 92.95 0.95 7.74 *** 1180

including 92.40 92.95 0.55 11.84 ***  

U-G Drilling station ES-NV40

ES-GM-U02-20* 14.10 16.95 2.85 6.04 *** NAL

including 15.90 16.40 0.50 13.47 ***  

ES-GM-U03-20* 20.54 25.35 4.81 3.63 *** NAL

including 20.54 21.63 1.09 14.34 ***  

ES-GM-U03-20* 49.80 50.20 0.40 14.69 *** VEM

El SILENCIO DEEP - DIRECTIONAL DRILLING

Surface Drilling station ES6160

ES-MH06-04A** 1085.5 1099.6 14.16 2.09 5.19 VEM

Including 1085.5 1087.1 1.58 8.24 8.25 VEM

U-G Drilling station ES5690

ES-MH07-01** 1033.75 1034.56 1.35 3.70 10.8 NAL

including 1033.75 1034.13 0.38 12.32 13.4 NAL

ES-MH07-01** 1048.60 1050.450 1.85 10.96 17.0 VEM

including 1049.73 1050.45 0.72 29.66 41.6 VEM

CARLA MINE

Surface Drilling station CA4960

CA-ES-004 154.23 155.45 1.22 7.00 6.4 LGC-HW1

including 154.74 155.45 0.71 9.74 8.2 LGC-HW1

Surface Drilling station CA4840

CA-ES-010 110.74 111.05 0.31 18.30 17.5 LGC-HW1

Surface Drilling station CA4850

CA-ES-016 273.68 274.34 0.66 59.29 48.6 LGC

CA-ES-017 265.35 266.25 0.90 12.35 14.1 LGC

* Denotes underground drill holes. Underground drill holes coded as GM were drilled by the Company’s Mine Geology

Department. The underground infill holes were drilled at -8 to -84 degrees from the horizontal. Sample interval grades over 7.0

g/t Au are reported. Grades are for quartz vein intersections and are length-weighted composites. The width is the sample

length and is not necessarily the true width of the vein. All gold and silver grades are uncut and are not diluted to a minimum

mining width.

** Denotes directional drilling mother and kick-off holes. The directional drilling kick-off hole was drilled at -42 degrees from the

horizontal. Sample interval grades over 7.0 g/t Au are reported.

*** Silver was not assayed for these drill holes carried out by the Company’s Mine Geology Department.

Results from in-mine infill drilling are reported for 55 holes (6,782 m) including 21 holes (1,846 m) at Providencia (PV-IU-241 to

PV-IU-261), 22 holes (3,343 m) at Sandra K (SK-IU-130 to SK-IU-151) and 12 holes (1,593 m) at El Silencio (ES-IU-106 to ES-

IU-117). There are no results above cut-off grade for the 21 holes at Providencia, 12 holes at Sandra K and 10 holes at El

Silencio and so these holes are not listed in the table.

Results from near-mine surface exploration drilling at Carla are reported for 17 holes (3,741 m) (CA-ES-001 and CA-ES-017).

There are no results above cut-off grade for 13 holes at Carla.

Results from directional drilling from two purpose-built stations at El Silencio are reported from 3 kick-off holes (ES-MH06-04A,

ES-MH07-01 and ES-MH07-02) totaling 1,707 m, which include 1 kick-off hole (485 m) on the central ore-shoot and 2 kick-off

holes (1,222 m) on the southern ore-shoot. In addition, 495 meters were drilled in one mother hole (ES-MH-007).

Please refer also to the attached illustrative maps showing the Providencia, Sandra K, El Silencio and Carla drilling programs.

Vein name abbreviations: PRO: Providencia Vein. FLT-14: 14 Fault. SKT: Sandra K Techo Vein. 6640: 6640 Vein. 1180: 1180

Vein. NAL: Nacional Vein. VEM: Manto Vein. LGC-HW1: La Gran Colombia Hanging Wall 1 Vein.

Gran Colombia currently has six diamond drill rigs in operation at Segovia, with four rigs carrying out resource definition within

the underground developments of the Providencia, Sandra K and El Silencio mines, one rig operating from Level 3 at Sandra K

targeting the down-plunge extension of the south ore-shoot of the El Silencio mine and one rig carrying out resource definition

from surface at the Carla mine.

Qualified Person

Dr. Stewart D. Redwood, PhD, FIMMM, FGS, Senior Consulting Geologist to the Company, is a qualified person as defined by

National Instrument 43-101 – Standards of Disclosure or Mineral Projects and prepared or reviewed the preparation of the

scientific and technical information in this press release. Verification included a review of the quality assurance and quality

control samples, and review of the applicable assay databases and assay certificates.

Quality Assurance and Quality Control

The Segovia samples were prepared by SGS Laboratories Ltd (ISO 9001:2008) at their laboratory in Medellin, and assayed at

their laboratories in Segovia, Colombia and El Callao, Peru. Gold was assayed by 30 g fire assay with atomic absorption

spectrophotometer (“AAS”) finish. Samples above the upper detection limit of 10.0 g/t gold were re-assayed by 30 g fire assay

with gravimetric finish. Silver was assayed by aqua regia digestion and AAS finish. Silver samples above 500 g/t were re-

assayed by aqua regia or multiacid digestion with AAS finish for ore grades. Samples from some of the GM holes were

prepared and assayed by the Mine Laboratory at Segovia which is run by Gran Colombia. Gold was assayed by 30 g fire

assay with AAS finish. Samples above 10 g/t were re-assayed by 30 g fire assay with gravimetric finish. Blank, standard and

duplicate samples were routinely inserted and monitored for quality assurance and quality control.

About Gran Colombia Gold Corp.

Gran Colombia is a Canadian-based mid-tier gold producer with its primary focus in Colombia where it is currently the largest

underground gold and silver producer with several mines in operation at its high-grade Segovia Operations. Gran Colombia

owns approximately 58% of Caldas Gold Corp., a Canadian mining company currently advancing a major expansion and

modernization of its underground mining operations at its Marmato Project in Colombia. Gran Colombia’s project pipeline

includes its Zancudo Project in Colombia together with an approximately 20% equity interest in Gold X Mining Corp. (TSXV:

GLDX) (Guyana – Toroparu) and an approximately 26% equity interest in Western Atlas Resources Inc. (TSX-V: WA) (Nunavut

– Meadowbank).

Additional information on Gran Colombia can be found on its website at www.grancolombiagold.com and by reviewing its

profile on SEDAR at www.sedar.com.

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information", which may include, but is not limited to, statements with respect to

anticipated business plans or strategies, including exploration programs and mineral resources and reserves. Often, but not

always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget",

"scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of

such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken,

occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements of Gran Colombia to be materially different from any future

results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause

actual results to differ materially from those anticipated in these forward-looking statements are described under the caption

"Risk Factors" in the Company's Annual Information Form dated as of March 30, 2020 which is available for view on SEDAR

at www.sedar.com. Forward-looking statements contained herein are made as of the date of this press release and Gran

Colombia disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a

result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or

otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place

undue reliance on forward-looking statements.  

For Further Information, Contact:

Mike Davies

Chief Financial Officer

(416) 360-4653

[email protected]

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/4d86e138-7c82-48e6-a18a-f5d7ecf5d469

https://www.globenewswire.com/NewsRoom/AttachmentNg/ef00cf78-d4d6-4435-a5e1-b3823c8f5660

https://www.globenewswire.com/NewsRoom/AttachmentNg/d825a6ac-805c-47bb-9423-d84d921211ae

https://www.globenewswire.com/NewsRoom/AttachmentNg/d713bd9b-defe-4816-a00d-9920f44bd4e3

https://www.globenewswire.com/NewsRoom/AttachmentNg/b297ae3f-254e-4cff-894a-edb461a4a926

https://www.globenewswire.com/NewsRoom/AttachmentNg/777d6e25-edb8-40fd-8890-95416c36a06a

https://www.globenewswire.com/NewsRoom/AttachmentNg/eb657de6-34d0-4b5d-a0d9-ffbf2a7e6e71