ARIS Mining to Increase Ownership IN Soto Norte Project to 51% and Commences Study to Assess New Development Plan
News Release
TSX: ARIS | NYSE-A: ARMN | aris-mining.com 1
ARIS MINING TO INCREASE OWNERSHIP IN SOTO NORTE PROJECT TO 51% AND
COMMENCES STUDY TO ASSESS NEW DEVELOPMENT PLAN
Vancouver, Canada, May 23, 2024 – Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS; NYSE -A:
ARMN) announces that it has entered into a binding agreement with MDC Industry Holding Company LLC
(Mubadala), a wholly -owned subsidiary of the Abu Dhabi based investment company Mubadala Investment
Company PJSC, whereby, subject to certain customary conditions, Aris Mining will acquire a n additional 31% joint
venture interest in the Soto Norte gold-copper project in Colombia (Soto Norte or PSN) and amend the current Joint
Venture Agreement to account for this change in ownership . Soto Norte is one of the largest undeveloped
underground gold projects in South America, set to employ modern and sustainable mining practices.
• Acquisition of 51% of PSN and Share Exchange: Aris Mining will acquire an additional 31% joint venture interest
in PSN from Mubadala, bringing its total ownership to 51%. In exchange, Aris Mining will issue 15,750,000 shares
to Mubadala, representing an approximate 9.9% ownership stake based on Aris Mining’s issued and outstanding
shares as of March 31, 2024 , with an additional 6,000,000 shares to be issued on receipt of an environmental
license for PSN.
• New, Smaller-Scale Development Plan: Aris Mining has completed optimization studies of a smaller, more
efficient development plan for PSN. Key changes include reducing the environmental footprint, building a smaller
processing plant with a longer operating life, adopting a flexible mining method to target higher-grade material
earlier in the mine life, and installing a paste backfill plant to minimize surface tailings storage requirements.
• Strategic and Operational Benefits: With a 51% controlling interest, Aris Mining will integrate the PSN
development team into its management structure and procedures , enhancing operational efficiencies and
creating synergies.
Aris Mining CEO Neil Woodyer stated: “As the only mining company with operational experience to own and operate
Soto Norte, we believe a new, smaller-scale development plan with a reduced environmental footprint is the right
path forward. Aris Mining also plans to incorporate processing solutions for contract mining partners into the design
and development of Soto Norte, following the successful partnership model developed at our Segovia Operations in
Colombia. Based on the attractive results of our preliminary work, w e are initiating a Pre-Feasibility Study (PFS) of
the new development plan, which is expected to be complete by early 2025.
In support of this plan, we are delighted to become the 51% controlling shareholder of the Soto Norte joint venture
at closing, enabling Aris Mining to develop this very attractive project.”
Soto Norte Transaction
• On closing, Aris Mining will issue 15,750,000 common shares to Mubadala. These shares will be subject to a 12-
month hold period, inclusive of a four-month statutory hold period and an additional eight -month contractual
restriction on transfer.
• Following receipt of an environmental license to develop PSN, Aris Mining will issue an additional 6,000,000
common shares to Mubadala , which together with the 15,750,000 common shares issued at closing would
increase Mubadala’s ownership stake to approximately 13% based on Aris Mining ’s issued an d outstanding
shares as of March 31, 2024.
News Release
TSX: ARIS | NYSE-A: ARMN | aris-mining.com 2
• The current market value of the 21,750,000 Aris Mining shares to be issued to Mubadala is US$90 million.
• On closing, Aris Mining will hold a 51% interest in PSN and Mubadala will retain a 49% interest . The current
option held by Aris Mining to acquire an additional 30% interest in PSN will be terminated . Aris Mining will
continue to be the operator of PSN.
• Aris Mining and Mubadala have mutual right-of-first-offer (ROFO) rights, should a partner choose to exit the joint
venture.
• As a result of Aris Mining integrating the PSN development team into its management structure and procedures,
Aris Mining will sole fund certain operating costs on behalf of the joint venture during the pre-licensing period.
Non-operating and project construction costs will be funded on a pro-rata ownership basis.
• Closing of the transaction is expected to occur in June 2024 following satisfaction of customary closing conditions,
including execution of definitive documentation related to the issuance of the shares and approval of the Toronto
Stock Exchange and the NYSE American.
Soto Norte Project and Planned Optimizations
In March 2022, Aris Mining disclosed the results of mineral resource and reserve estimates and the results of a
Feasibility Study for the Soto Norte Gold Project in a NI 43-101 compliant Technical Report with an effective date of
January 1, 2021 (the Feasibility Study). The Feasibility Study includes a 7,200 tonnes per day (tpd) capacity processing
plant with average annual production of over 450,000 gold ounces (oz) over an 11-year production period at average
all in sustaining costs (AISC) of US$471/oz from a 5.0 million ounce mineral reserve1.
In 2023, Aris Mining commissioned a technical and economic assessment of PSN that considered a scaled-down
mining concept. Aris Mining is now commissioning a new PFS and NI 43 -101 compliant Technical Report for the
scaled-down concept, both of which are expected to be completed in Q1 2025 . The new PFS will include the
assessment of the key project optimizations described in Table 1.
Table 1: Key project optimizations to be evaluated in the new PFS
Optimized
underground mining
strategy prioritizes
initial access to a
higher grade zone
There are two main parallel mineralized zones at PSN and each has a strike length of
approximately 2.0 km . The r evised underground min ing strategy prioritizes initial
access to the higher grade zone, which can be quickly accessed from an existing portal.
The revised plan is expected to sustain a mining rate approaching 2.0 million tonnes of
mill feed and waste per year.
Change of mining
method
The mining method for the Feasibility Study was modified Avoca, which required a
significant amount of additional waste, sourced from underground waste quarry
stopes, to provide backfill and a base for mining.
The proposed mining method for the new PFS is long hole open stoping (LHOS )
targeting higher grade stopes in the upper levels of the mine early in the mine life and
1 See “Technical Disclosure and Qualified Person” section below for full disclosure of technical and scientific details.
News Release
TSX: ARIS | NYSE-A: ARMN | aris-mining.com 3
utilizing pillars for support in the first stage of mining. Paste backfill will be utilized in
the second stage of mining while the support pillars are systematically extracted.
Defer underground
paste fill plant
After installation of the paste fill plant , the mining method is proposed to change to
LHOS and paste fill, to increase overall mining recovery while reducing the upfront
capital requirement.
Smaller processing
plant
The proposed processing plant is expected to have a 2,750 tpd capacity, approximately
60% smaller than the Feasibility Study design, with a longer operating life.
Aerial ropeway
proposed to move mill
feed from the existing
portal to the
processing plant
Elimination of the 6.9 km tunnel, which was to be created by way of a tunnel boring
machine ( TBM), accelerating construction timelines and reducing cap ital costs .
Ropeway technology is currently in use in Colombia, requires minimal land use, and is
easily removed at the end of the mine life. The ropeway will also move tailings from the
processing plant to the underground paste fill plant.
Reduced size and
relocation of
tailings storage facility
The new PSN design considers the use of process tailings as backfill in the underground
stopes, significantly reducing the surface tailings storage capacity requirements and
environmental footprint.
Shortened
construction period
The Feasibility Study estimated a 3.5-year construction period, with the critical path
highly dependent on the TBM advance rate . The new PSN development plan will not
utilize a TBM, resulting in an accelerated construction period.
Environmental studies The new, smaller -scale development plan is expected to reduce the environmental
impact of PSN and is expected to remain mostly within the Feasibility Study project
footprint covered by the existing environmental baseline studies and datasets.
Páramo proximity PSN remains outside the Santurbán páramo delimitation area.
Opportunity for
Contract Mining
Partners (CMPs)
Aris Mining has a successful partnership model with CMPs that combines the traditional
skills and local knowledge of artisanal and small-scale miners with the technology,
infrastructure, health/safety standards, and access to capital of industrial miners.
Aris Mining intends to incorporate processing solutions for CMPs into the design and
development of PSN, with the potential to formalize miners in the Soto Norte region in
addition to Calimineros, an existing partner at PSN with about 160 miners. Aris Mining’s
CMP model eliminates the use of mercury and illegal explosives by artisanal miners ,
creating an ecosystem that benefits CMPs, local communities, the Colombian
government, the environment, and Aris Mining.
News Release
TSX: ARIS | NYSE-A: ARMN | aris-mining.com 4
Conference Call
Management will host a conference call on Thursday, May 23, 2024, at 9:00 am ET / 6:00 am PT to discuss this
transaction. The call will be webcast and can be accessed at Aris Mining’s website at www.aris-mining.com, or at
https://services.choruscall.ca/links/arismining202405.html.
Participants may gain expedited access to the conference call at the following registration link. Upon registering,
call in details will be displayed on screen. Using these call details will by-pass the operator and avoid the call queue.
Registration will remain open until the end of the live conference call.
Participants who prefer to dial-in and speak with a live operator, can access the call by dialing:
• Toll-free North America: 1-844-763-8274
• International: 1-647-484-8814
After the call, an audio recording will be available via telephone for 7 days, until end of day May 30th, 2024. The
recording can be accessed by dialing:
• Toll-free in the US and Canada: 1-855-669-9658
• International: 1-604-674-8052 and using the access code: 0915#
A replay of the event will be archived at Aris Mining Corporation – Investors – Events & Presentations (www.aris-
mining.com).
Technical Disclosure and Qualified Person
The technical information in this news release was reviewed and approved by Pamela De Mark, P .Geo, Senior Vice
President, Geology and Exploration of Aris Mining, who is a Qualified Person as defined by NI 43 -101. Unless
otherwise indicated, the mineral res ource and reserve estimates, scientific disclosure, and technical information
included in this news release are based upon information included in the following NI 43 -101 compliant technical
report: “NI 43-101 Technical Report Feasibility Study of the Soto Norte Gold Project, Santander, Colombia”, dated
March 21, 2022 with an effective date of January 1, 2021 (the Soto Norte Technical Report). The Soto Norte Technical
Report was prepared by Ben Parsons, MSc, MAusIMM (CP), Chris Bray, BEng, MAusIMM (CP), and Dr John Willis PhD,
BE (MET), MAusIMM (CP), and Dr Henri Sangam, Ph.D., P .Eng., each of whom is independent of Aris Mining within
the meaning of NI 43 -101 and is a “Qualified Person” as such term is defined in NI 43 -101. The report was also
prepared by Robert Anderson, P .Eng., a Qualified Person who is considered non-independent of Aris Mining. The
Soto Norte Technical Report is available for download on Aris Mining's website at www.aris-mining.com and on Aris
Mining Holdings Corp's (Aris Holdings) SEDAR+ profile at www.sedarplus.ca and in Aris Mining's filings with the SEC
at www.sec.gov. Aris Holdings is a subsidiary of Aris Mining.
News Release
TSX: ARIS | NYSE-A: ARMN | aris-mining.com 5
About Aris Mining
Aris Mining is a gold producer in the Americas, currently operating two mines with expansions underway in Colombia.
The Segovia Operations and the Marmato Upper Mine produced 226,000 ounces of gold in 2023. Aris Mining is
targeting a production rate of 500,000 ounces of gold per year in the second half of 2026, following a ramp-up period
after the Segovia mill expansion scheduled for completion in Q1 2025 and the Marmato Lower Mine’s first gold pour
in late 2025. Aris Mining also operates the Soto Norte joint venture, where environmental licensing is advancing to
develop a new underground gold, silver and copper mine. In Guyana, Aris Min ing is advancing Toroparu, a
gold/copper project. Aris Mining intends to pursue acquisitions and o ther growth opportunities to unlock value
through scale and diversification.
Aris Mining promotes the formalization of artisanal and small -scale mining into contract mining partners as this
process enables all miners to operate in a legal, safe and responsible manner that protects them and the
environment.
Additional information on Aris Mining can be found at www.aris-mining.com, www.sedarplus.ca, and on
www.sec.gov.
Aris Mining contact s:
Oliver Dachsel
Senior Vice President, Capital Markets
+1.917.847.0063
Kettina Cordero
Vice President, Investor Relations
+1.604.417.2574
For ward -Looking Information
This news release contains "forward -looking information" or forward -looking statements" within the meaning of Canadian securities
legislation. All statements included herein, other than statements of historical fact, including, without limitation, the acquisition of additional
joint venture interest in PSN and the details and timing thereof, plans pertaining to PSN and the details, costs, benefits and timing thereof, the
PFS and the expected timing thereof and the timing and details thereof and the Company’s plans and strategies are forward-looking. Generally,
the forward-looking information and forward looking statements can be identified by the use of forward looking terminology such as "plans",
"expects" or "does not expect", "is expected", "budget", "sch eduled", "estimates", "forecasts", "intends", "anticipates" or "does not
anticipate", "will continue" or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could",
"would", "might" or "will be taken", "occur" or "be achieved”. The material factors or assumptions used to develop forward looking information
or statements are disclosed throughout this news release.
Forward looking information and forward looking statements, while based on management's best estimates and assumptions, are s ubject to
known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of
Aris Mining to be materially different from those expressed or implied by such forward -looking information or forward looking statements,
including but not limited to those factors discussed in the section entitled "Risk Factors" in Aris Mining's annual information form dated March
6, 2024 which is available on SEDAR+ at www.sedarplus.ca and in the Company’s filings with the SEC at www.sec.gov.
Although Aris Mining has attempted to identify important factors that could cause actual results to differ materially from th ose contained in
forward-looking information and forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated
or intended. There can be no assurance that such information or statements will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such information or statements. The Comp any has and continues to disclose in its Management's
Discussion and Analysis and other publicly filed documents, changes to material factors or assumptions underlying the forward -looking
information and forward -looking statements and to the validity of th e information, in the period the changes occur. The forward -looking
statements and forward-looking information are made as of the date hereof and Aris Mining disclaims any obligation to update any such factors
or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein
to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information.