Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARIC.V ·

Awalé Hits 24.8 g/t Gold over 5 Metres within 18.9 g/t Gold over 7 Metres at Charger

Drill Results

Awalé Hits 24.8 g/t Gold over 5 Metres within

18.9 g/t Gold over 7 Metres at Charger

Highlights:

Significant intercepts at Charger 1 include:

18.9 g/t gold over 7m from 292m, including 24.8 g/t gold over 5m (CHDD-20)

9.2 g/t gold over 7m from 310m, including 14.7 g/t gold over 4m & 11.7 g/t gold over 4m

(CHDD-13)

Results confirm and extend high-grade gold mineralization through depths of 300m below surface.

Four diamond drill holes at Charger 2 have been completed and are in the reporting pipeline.

Empire resource drilling results to be released shortly.

Toronto, Ontario--(Newsfile Corp. - April 14, 2026) -

Awalé Resources Limited (TSXV: ARIC)

(OTCQX: AWLRF) (FSE: 2F60)

("

Awalé

" or the "

Company

") is pleased to announce new step-down

drilling results from the Charger target at its Odienné Project ("

Odienné

" or the "

Project

") in Côte

d'Ivoire. The results build on those reported on

January 29, 2026

and

March 31 2026

, and continue to

demonstrate strong down-plunge continuity of the high-grade mineralization at Charger 1, supporting its

potential for future underground resource growth (see Figures 2 and 3).

"These latest results further demonstrate the continuity of high-grade gold mineralization within the

breccia and vein system at Charger, reinforcing its potential as a robust emerging underground target.

With all 17 holes from the Charger program now reported, we are building strong confidence in the

continuity of the Charger 1 system and its potential for further growth along strike and at depth, as we

advance toward an initial Mineral Resource Estimate targeted in Q2 2026," stated Andrew Chubb,

President and CEO of Awalé Resources.

Link to All Figures

Watch Video of CEO Andrew Chubb Discussing New Results from Charger

Link to Core Photos

Charger Step-Down Drilling

These results complete the 17-hole resource drilling program supporting the Company's initial MRE in

Q2 2026, which will include the BBM, Charger, and Empire targets. The program successfully tested the

down-plunge continuity of the high-grade Charger 1 system to depths of 400 metres below surface.

The reported holes in this release, together with those reported on

March 31 2026

are approximately

250 metres down-plunge from the original discovery hole at Charger (OEDD-83), which returned 57

metres at 26 g/t gold (

see March 25, 2024 news release

).

CHDD-14 and CHDD-17 were drilled a further 40 and 80 metres down-plunge from CHDD-03,

which returned 52.8 g/t gold over 9 metres (

see January 29, 2026 news release

).

CHDD-20 expands mineralization up-plunge from CHDD-03 in what was previously a lower grade

gap.

Follow-up drilling will test Charger to at least 600 metres vertical depth, while also stepping out to the

northeast and southwest to evaluate potential strike extensions and additional mineralized zones.

Ongoing Drilling and Results Pending - BBM, Charger 2, and Empire

The Company will soon report results from four additional exploration holes at Charger 2, as well as the

remaining twelve (12) holes from the Empire MRE drill program. Diamond drilling also continues at

BBM, targeting new exploration and expansion zones, alongside a broad aircore drilling program testing

multiple greenfields targets across the Odienné East and Odienné West permits.

About Awalé Resources

Awalé is a diligent and systematic mineral exploration company focused on discovering large high-

grade gold and copper-gold deposits. Exploration activities are currently underway in the underexplored

regions of Côte d'Ivoire, where the Company is exploring the Odienné Copper-Gold Project ("

Odienné

"

or the "

Project

"), covering 2,346 km

2

across seven permits-five granted and two applications. This

includes 797 km

2

in two permits held under the Awalé-Newmont Joint Venture ("OJV"). Awalé currently

manages all exploration activities over the OJV, with funding currently provided by Newmont Ventures

Limited ("Newmont") under an Exploration Agreement signed in May 2022.

Awalé has discovered four gold, gold-copper, and gold-copper-silver-molybdenum mineralized systems

within the OJV and has recently commenced exploration on its 100%-owned properties.

The Odienné Project is underexplored and has multiple pipeline prospects with similar geochemical

signatures to Iron Oxide Copper Gold (

IOCG

) and intrusive-related mineral systems with substantial

upside potential. The Company benefits from a skilled and well-seasoned technical team that allows it to

continue exploring in a pro-mining jurisdiction that offers significant potential for district-scale

discoveries.

Table 1: Significant Intercepts from Diamond Drilling - (from this release)

Hole ID

From

(m)

To

(m)

Length

(m)

Au

(g/t)

Ag

(g/t)

Cu

(ppm)

Mo

(ppm)

Composite

Trigger

(Au g/t)

CHDD0005

279

280

1.00

1.1

0.1

57.6

3

0.5

342

343

1.00

0.6

0.2

171.2

2

0.5

378

380

2.00

0.7

0.7

68.5

2

0.5

399

400

1.00

0.5

0.4

63.9

1

0.5

416

417

1.00

0.6

0.4

238.8

3

0.5

CHDD0006

351

352

1.00

2.0

7.5

69.3

3

0.5

367

368

1.00

4.6

5.6

96.2

3

0.5

383

386

3.00

0.9

0.6

101.8

2

0.5

432

433

1.00

1.2

1.0

129.2

4

0.5

439

440

1.00

0.6

0.9

106.1

2

0.5

CHDD0008

307

308

1.00

0.5

0.2

108.3

1

0.5

332

333

1.00

1.4

0.7

121.6

2

0.5

384

385

1.00

1.1

0.5

64.2

2

0.5

390

391

1.00

1.4

1.5

95.1

4

0.5

400

401

1.00

1.7

0.5

92.7

10

0.5

413

414

1.00

2.2

3.8

164.7

7

0.5

CHDD0009

234

235

1.00

0.9

0.2

65.0

2

0.5

291

292

1.00

1.4

0.2

150.9

2

0.5

361

362

1.00

0.9

0.2

60.1

1

0.5

365

366

1.00

0.5

1.1

385.7

2

0.5

CHDD0013

301

303

2.00

0.9

ICP Results Pending

0.5

310

317

7.00

9.2

0.5

including

310

314

4.00

14.7

5.0

327

331

4.00

11.7

0.5

339

340

1.00

1.1

0.5

345

346

1.00

1.3

0.5

360

363

3.00

9.0

0.5

including

361

363

2.00

13.1

5.0

388

389

1.00

0.8

0.5

CHDD0019

306

307

1.00

0.6

0.1

103.5

4

0.5

314

315

1.00

2.3

0.3

168.3

6

0.5

354

355

1.00

1.1

0.2

51.5

2

0.5

CHDD0020

241

242

1.00

0.7

0.2

72.1

25

0.5

292

299

7.00

18.9

3.7

50.3

2

0.5

including

293

298

5.00

24.8

4.7

50.3

2

10.0

308

310

2.00

3.1

0.8

61.8

2

0.5

316

321

5.00

3.0

0.6

262.8

6

0.5

325

326

1.00

1.2

0.2

71.7

1

0.5

Table 2: Charger Drill Collar Details - (all collars from this release)

Hole ID

Easting

Northing

RL_M

Azimuth_True

Dip

EOH_M

Comment

CHDD0005

647828.0

1032078.5

466.7

306.9

-58.7

473.09

CHDD0006

647852.1

1032110.2

466.4

307.0

-58.6

473.50

CHDD0008

647839.1

1032095.7

466.5

306.7

-58.7

473.70

CHDD0009

647811.7

1032068.5

467.2

306.6

-58.7

488.20

CHDD0011

647845.8

1032130.8

467.1

307.5

-58.3

173.15

Failed Hole

CHDD0012

647852.6

1032072.1

465.5

307.6

-58.2

165.25

Failed Hole

CHDD0013

647838.7

1032130.7

467.4

307.5

-58.4

443.15

CHDD0016

647857.0

1032048.1

464.4

304.8

-59.7

67.60

Failed Hole

CHDD0018

647820.3

1032047.9

466.3

306.0

-59.1

40.17

Failed Hole

CHDD0019

647881.9

1032075.1

464.2

304.9

-59.9

578.34

CHDD0020

647870.3

1032154.7

466.3

307.0

-57.0

441.70

Quality Control and Assurance

Analytical work for drill samples is being carried out at the independent Intertek Laboratories in Ghana

and Australia, an ISO 17025 Certified Laboratory. Samples are prepared and stored at the Company's

field camps and put into sealed bags until collected by Intertek from the Company's secure Odienné

office and transported by ALS to their preparation laboratory in Yamoussoukro, Côte d'Ivoire, for

preparation. Samples are logged in the tracking system, weighed, dried, and pulverized to greater than

85%, passing a 75-micron screen. Two pulps are prepared from each sample with one stream to

Intertek Ghana for fire assay and a second to Australia where the sample is analyzed by 52 element

ICP/MS with a 4-Acid digest. Blanks, duplicates, and certified reference material (standards) are being

used to monitor laboratory performance during the analysis. Where visible gold is observed in drill core,

a quartz wash is applied between every sample to reduce or eliminate any contamination. Once fire

assay results are received, samples over 5 g/t gold are routinely screen fire assayed, samples lower

than 5 g/t gold continued within a high-grade interval are also screen fire assayed.

Mineralized Interval Calculations

Significant intervals reported in this news release are calculated as downhole length-weighted

intercepts. For the Charger target, initial mineralized zones are calculated at a 0.5 g/t Au trigger and

include up to 3 metres of internal waste for delineating mineralized zones. Included intervals are

calculated at 2 g/t Au, 5 g/t Au, and 10 g/t Au trigger values, with up to 3 metres of internal waste. Table 2

contains a list of all Charger holes reported in this release. True widths are estimated to be 70% of the

downhole widths. Holes not reported do not make the 0.5 g/t Au grade trigger.

Qualified Person

The technical and scientific information contained in this news release has been reviewed and approved

for release by Andrew Chubb, the Company's Qualified Person as defined by National Instrument 43-

101. Mr. Chubb is the Company's Chief Executive Officer and holds an Economic Geology degree, is a

Member of the Australian Institute of Geoscientists (AIG), and is a Member of the Society of Economic

Geoscientists (SEG). Mr. Chubb has over 25 years of experience in international mineral exploration and

mining project evaluation.

Abbreviations Used in this Release

Ag

Silver

Au

Gold

Cu

Copper

g/t

Grams per tonne

km

Kilometres

m

Metres

MRE

Mineral Resource

Estimate

Mo

Molybdenum

ppm

Parts per million

AWALÉ Resources Limited

On behalf of the Board of Directors

"Andrew Chubb"

Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:

Andrew Chubb, CEO

(+356) 99139117

[email protected]

Ardem Keshishian, VP Corporate Development

+1 (416) 471-5463

[email protected]

The Company's public documents may be accessed at

www.sedarplus.ca

. For further information on the

Company, please visit our website at

www.awaleresources.com

.

Forward-Looking Information

This news release contains forward-looking information within the meaning of Canadian securities

laws (collectively "forward-looking statements"). Forward-looking statements are typically identified by

words such as: believe, expect, anticipate, intend, estimate, plans, propose, potential, postulate and

similar expressions, or are those, which, by their nature, refer to future events. All statements that are

not statements of historical fact are forward-looking statements. Forward-looking statements in this

news release include but are not limited to statements regarding the Company's presence in Côte

d'Ivoire and ability to achieve results, creation of value for Company shareholders, achievements

under the Newmont JV, works on other properties, timing and extent of planned drilling, expectations

to achieve a first mineral resource estimate and preliminary economic assessment, advancing

towards a pre-feasibility study, potential for new discoveries, timing for providing assay results,

commencement of operations. Although the Company believes any forward-looking statements in this

news release are reasonable, it can give no assurance that the expectations and assumptions in such

statements will prove to be correct. Factors that could cause actual results to differ materially from

such forward-looking information include, but are not limited to, the results of the proposed drilling

programs, the number of drilling rigs on site, changes in the state of equity and debt markets,

fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals,

and other risks involved in the mineral exploration and development industry, including those risks

set out in the Company's management's discussion and analysis as filed under the Company's

profile at

www.sedarplus.ca

. Forward-looking information in this news release is based on the opinions

and assumptions of management considered reasonable as of the date hereof, including that all

necessary governmental and regulatory approvals will be received as and when expected and that the

proposed drilling program will proceed as planned. Although the Company believes that the

assumptions and factors used in preparing the forward-looking information in this news release are

reasonable, undue reliance should not be placed on such information. The Company disclaims any

intention or obligation to update or revise any forward-looking information, other than as required by

applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/292284