Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARIC.V ·

Awalé Hits 2.7 g/t Gold Eq. over 27 Metres at the BBM Zone, Odienné Project

Drill Results

Awalé Hits 2.7 g/t Gold Eq. over 27 Metres at the BBM Zone, Odienné Project

HIGHLIGHTS

• 27m @ 2.7 grams per tonne (“g/t”) gold equivalent (AuEq.), including 12m @ 3.9 g/t AuEq. from

435m downhole in OEDD-98.

• 10m @ 2.8 g/t AuEq. within 22m @ 2 g/t AuEq. from 454m downhole in OEDD-97.

• Deeper drilling shows the BBM system remains open at depth and down plunge , with

mineralization defined from surface to over 330 metres vertical depth.

• Awalé has recently commenced a 4000m diamond drill program, fully funded by Newmont as

part of a broader campaign that will continue throughout 2024 and into 2025.

Vancouver, British Columbia, November 18, 2024 -- Awalé Resources Limited (TSXV : ARIC) (“Awalé” or

the “Company”) is pleased to announce results from the final two 525-metre (“m”) deep holes of a 6,808-

metres in 28 holes follow-up drilling program at the BBM Zone within the Odienné Joint Venture (“OJV”)

in Côte d'Ivoire. These holes have intercepted mineralization at a planned depth exceeding 330m below

surface (see Figure 1 – Drill Plan View, Figure 2 - Cross Section, and Figure 3 - Cross Section).

“The BBM drill program has exceeded our expectations as we report the final two holes, which test the

down-plunge continuity of this discovery. The highlighted intercept of 27 metres at 2.7 g/t AuEq. including

12m at 3.9 g/t AuEq. in hole OOEDD -98 is significant, and confirms the system is open at depth with the

higher-grade core of BBM growing to 600 metres and remaining open.

A new interpretation of the drill data has introduced a fold model within the BBM mineralized shear, this

can have a meaningful impact on grade and volume within the core zone of this discovery. We are still

learning about BBM as drilling has been broadly spaced with only 6,808m drilled in 28 holes. We are

excited to see drilling resume as we continue to explore the potential scale and significance of the BBM

target.” commented Andrew Chubb, CEO of Awalé Resources.

LINK TO BBM’s OEDD-98 Drill Core Photos

LINK TO ALL HI-RES FIGURES

Link to BBM Webinar

2 | A w a l é R e s o u r c e s L t d .

About the BBM Zone

BBM is an Awalé grassroots discovery (see January 11, 2024 news release). Gold and copper mineralization

and alteration in the BBM system are controlled by a northwest striking shear zone that follows an

intrusive/sedimentary contact. This shear zone lies parallel to an interpreted major crustal boundary and

forms an 8-kilometre-long geochemical gold trend in termitaria and soil. The 6,808 metres of drilling in 28

holes completed to date have intercepted the target shear z one and covers only 2 kilometres of an 8-

kilometre trend (see Figure 5). Awalé has continued to expand the potential of the BBM discovery with

further intersections along strike from the initial discovery holes. The included interval of 12m at 3.9 g/t

AuEq. (see Core Photos) continues to show there is increasing grade with depth . The Company has now

completed 3 phases of drilling and has just commenced the fourth this drill season (see March 18, 2024

news release and September 9, 2024 news release).

Mineralization at BBM is steeply dipping (70 to 80 degrees) with a gentle plunge (45 to 55 degrees) toward

the northwest. Recent interpretation suggests this plunge is controlled by isoclinal folding withing the

BBM shear (see Cross Sections in Figure 2 and Figure 3 and Long Section in Figure 4 ). This fold geometry,

along with the frequency of the folds , can have a significant impact on the grade and volume of

mineralization.

The final two holes reported in this release were part of a program which consisted of 3,627 metres drilled

across 10 diamond holes and 2 diamond tails (hole extensions from previous drilling, targeting footwall

mineralization).

Alteration at BBM is dominated by silica and biotite with pyrite, chalcopyrite, and molybdenite as the main

sulphide species. Recently, a fold model for control on the plunging mineralization has taken precedence

over the footwall splay model previously discussed . What were previously considered as mineralized

fingers of granodiorite are now interpre ted to be fold hinges or ‘ knuckles’. Current drilling will test this

hypothesis and understanding the fold geometry and the controls on higher grade gold can have a positive

effect on both the grade and volume of mineralization at BBM.

Drilling completed to date has consistently confirmed strong grade continuity within the distinct silica-

biotite alteration system. The fold model suggests the potential for parallel higher-grade shoots within a

core zone of robust mineralization that now exceeds 600m in length with an open vertical depth of 330m,

true widths of the mineralized envelope are up to 50m. Mineralization also remains open outside the BBM

discovery zone, with potential for other plunging shoots within the initial 2 km discovery as well as satellite

discoveries along strike. The Company will continue with further step-out and infill drilling throughout the

2024-2025 field season. Prior to drilling the extension targets, an Induced Polarization (“IP”) program is

planned to aid in drill targeting in the satellite areas northwest of the BBM zone . This IP survey on the

Joint Venture permits will complement and be completed alongside the IP planned over the 100%-owned

Awalé ‘Sienso’ permit which abuts the BBM discovery zone (see October 22, 2024 news release).

Drill collar locations and full table of significant intercepts for the program are provided in Table 1 and

Table 2 below.

3 | A w a l é R e s o u r c e s L t d .

Table 1: BBM Drilling Collar Cable – (from this program)

HOLEID EASTING NORTHING RL_M AZIM_TRUE DIP EOH_M Comments

OEDD0065 655949.04 1048015.91 450.19 35.00 -55.00 209.51 DD Tail from 66m (NSV)

OEDD0073 655796.27 1048113.92 448.95 35.00 -55.00 107.30 DD Tail from 209m

OEDD0089 655813.07 1047963.67 445.71 31.20 -57.47 410.00

OEDD0090 655993.81 1047946.69 450.68 35.00 -55.00 317.27

OEDD0091 656138.39 1047853.14 455.30 35.00 -55.00 194.20

OEDD0092 655702.70 1048073.71 451.07 35.00 -55.00 335.30

OEDD0093 655379.89 1048249.71 458.08 35.00 -55.00 278.27

OEDD0094 655518.24 1048148.92 457.56 35.00 -55.00 398.30

OEDD0095 655305.16 1048288.12 458.20 35.00 -55.00 284.15

OEDD0096 656212.45 1047770.64 460.13 35.00 -55.00 191.18

OEDD0097 655771.52 1047907.10 448.81 35.00 -55.00 524.00

OEDD0098 655709.29 1047942.84 451.40 35.00 -55.00 525.92

Table 2: Significant Intercepts – (from this program)

Hole From

(m)

To

(m)

Width

(m)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Mo

(ppm)

AuEq.

(g/t)

Au

gm

AuEq.

gm

Comp

Trigger

(g/t)

OEDD0073 147.00 173.00 26 0.6 0.16 0.5 131 0.9 15 23 0.2

including 150.00 152.00 2 0.9 0.14 0.6 14 1.1 2 2 0.5

including 160.00 173.00 13 0.8 0.24 0.8 230 1.3 11 17 0.5

OEDD0089 318.00 353.00 35 2.2 0.48 1.9 567 3.3 77 114 0.5

Including 319.00 325.00 6 2.3 0.27 1.0 1071 3.5 14 21 2

Including 330.00 353.00 23 2.5 0.60 2.3 365 3.6 59 83 1

and 377.00 394.00 17 1.8 0.30 0.9 195 2.4 31 41 0.5

Including 384.00 390.00 6 3.1 0.55 1.6 353 4.1 19 25 2

OEDD0090 181.00 233.00 52 1.5 0.21 0.9 234 2.0 80 104 0.2

Including 212.00 231.00 19 2.6 0.31 1.1 246 3.2 50 62 2

OEDD0091 120.00 173.00 53 0.6 0.13 0.6 130 0.9 34 48 0.2

and 134.00 169.00 35 0.8 0.14 0.6 158 1.1 28 39 0.5

OEDD0092 84.00 89.00 5 0.7 0.46 1.5 18 1.3 4 7 0.5

Including 84.00 85.00 1 2.7 1.82 6.1 38 5.2 3 7 1

and 278.00 310.00 32 1.5 0.36 1.3 138 2.1 48 67 0.50

Including 287.00 302.00 15 2.4 0.38 1.3 181 3.0 35 45 1.00

OEDD0093 199.00 233.00 34 0.6 0.59 3.0 40 1.5 22 51 0.20

Including 180.00 182.00 2 2.5 1.16 4.8 36 4.1 5 8 1.00

and 211.00 232.00 21 0.8 0.74 3.9 40 1.9 17 40 0.50

Including 215.00 216.00 1 1.4 0.94 3.8 27 2.8 1 3 1.00

Including 220.00 221.00 1 3.8 1.02 6.4 132 5.3 4 5 1.00

Including 228.00 229.00 1 1.5 0.33 2.6 18 2.0 2 2 1.00

OEDD0094 241.00 257.00 16 0.7 0.37 0.9 146 1.3 12 21 0.50

Including 245.00 246.00 1 1.9 0.21 0.6 93 2.3 2 2 1.00

Including 252.00 253.00 1 1.1 0.54 1.0 99 1.9 1 2 1.00

Including 256.00 257.00 1 1.2 1.03 3.3 85 2.7 1 3 1.00

and 298.00 317.00 19 0.8 0.14 0.5 69 1.0 15 19 0.50

Including 298.00 303.00 5 1.1 0.20 0.6 146 1.5 6 8 1.00

Including 307.00 311.00 4 1.1 0.20 0.5 30 1.4 4 6 1.00

and 333.00 354.00 21 0.9 0.28 0.9 196 1.4 18 29 0.50

Including 337.00 349.00 12 1.1 0.32 1.0 231 1.7 13 21 1.00

and 353.00 354.00 1 1.8 0.35 1.3 43 2.3 2 2 1.00

OEDD0095 185.00 204.00 19 0.3 0.36 1.4 24 15.5 6 16 0.20

Including 192.00 193.00 1 0.6 0.81 3.5 63 1.7 1 2 0.50

Including 203.00 204.00 1 1.2 0.36 1.5 7 1.7 1 2 0.50

and 212.00 213.00 1 0.6 1.11 3.8 35 2.2 1 2 0.50

4 | A w a l é R e s o u r c e s L t d .

Hole From

(m)

To

(m)

Width

(m)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Mo

(ppm)

AuEq.

(g/t)

Au

gm

AuEq.

gm

Comp

Trigger

(g/t)

and 217.00 218.00 1 0.6 0.72 2.9 46 1.6 1 2 0.50

and 238.00 239.00 1 0.6 0.22 2.4 5 1.0 1 1 0.50

OEDD0096 126.00 137.00 11 0.3 0.15 0.4 178 7.0 3 7 0.20

Including 132.00 133.00 1 0.5 0.25 0.7 68 0.9 1 1 0.50

and 141.00 162.00 21 0.9 0.17 0.8 114 26.2 20 26 0.20

Including 144.00 146.00 2 2.2 0.38 1.5 227 5.8 4 6 1.00

Including 152.00 161.00 9 1.4 0.17 0.9 95 15.2 12 15 0.50

Including 156.00 159.00 3 2.9 0.32 1.6 112 10.4 9 10 2.00

OEDD0097 446.00 476.00 30 1.1 0.28 0.7 83 1.5 33 46 0.2

including 454.00 476.00 22 1.4 0.35 0.9 107 2.0 31 44 0.5

including 461.00 471.00 10 2.1 0.46 1.2 137 2.8 21 28 2

and 519.00 524.00 5 1.3 0.00 0.2 6 1.4 7 7 0.5

OEDD0098 435.00 462.00 27 1.9 0.40 1.4 279 2.7 52 72 0.5

including 435.00 445.00 10 1.34 0.25 0.92 241 1.9 13 19 1

including 449.00 461.00 12 2.86 0.59 1.95 338 3.9 34 47 1

and 482.00 498.00 16 1.0 0.23 0.8 129 1.4 16 23 0.5

About Awalé Resources

Awalé is a diligent and systematic mineral exploration company focused on discovering large high -grade

gold and copper-gold deposits. Exploration activities are currently underway in the underexplored regions

of Côte d'Ivoire, where the Company is focused on the Odienné Copper -Gold Project (“Odienné” or the

“Project”), covering 2,489 km2 across seven permits. This includes 796 km2 in two permits held under the

Awalé-Newmont Joint Venture (“OJV”) . Awalé manages all exploration activities over the OJV, with

funding provided by Newmont Joint Ventures Limited (“Newmont”) (see May 31, 2022 news release).

Awalé has discovered four gold, gold-copper, and gold-copper-silver-molybdenum discoveries within the

OJV and has recently commenced exploration on its 100% -owned properties following an $11.5 million

capital raise in April 2024.

The Odienné Project is underexplored and has multiple pipeline prospects with similar geochemical

signatures to Iron Oxide Copper Gold (IOCG) and intrusive-related mineral systems with substantial upside

potential. The Company benefits from a skilled and well seasoned technical team that allows it to continue

exploring in a pro-mining jurisdiction that offers significant potential for district-scale discoveries.

Quality Control and Assurance

Analytical work for drill samples is being carried out at the independent Intertek Laboratories in Ghana

and Australia, an ISO 17025 (2017) Certified Laboratory. Samples are stored at the Company's field camps

and put into sealed bags until collected by Intertek from the Company's secure Odienné of fice and

transported by Intertek to their preparation laboratory in Yamoussoukro, C ôte d'Ivoire, for preparation.

Samples are logged in the tracking system, weighed, dried, and pulverized to greater than 85%, passing a

75-micron screen. Two pulps are prepa red from each sample with one stream to Intertek Ghana for fire

assay and a second to Australia where the sample is analyzed by 52 element ICP/MS with an Aqua Regia

digest. Blanks, duplicates, and certified reference material (standards) are being used to monitor

laboratory performance during the analysis. All fire assay samples returning greater than 5 g/t gold are

routinely Screen Fire Assayed, in this special case lower than 5g samples up and down hole from the high-

5 | A w a l é R e s o u r c e s L t d .

grade interval in OEDD -88 were also subject to Screen Fire Assays. As a further QC precaution due to

visible gold presence, Intertek was requested to insert a quartz wash between each sample in the

mineralized interval, ensuring no sample contamination in the preparation process.

Mineralized Interval Calculations

Significant intervals reported in this news release are calculated downhole length weighted intercepts.

For the BBM target initial mineralized are calculated at a 0.2 g/t trigger and include up to 5 metres internal

waste for of delineation mineralized zones. Included intervals are at 0.5 g/t, 1 g/t, and 2 g/t trigger values

with 3m of internal waste only . Table 1 Contains a list of all BBM holes drilled this program – including

extensions to OEDD-65 and OEDD-73 which contain mineralized intervals at less than the 0.2 g/t Au trigger

value. True Widths are estimated to be 70% of the downhole widths.

Au Equivalent Calculations

Au Equivalent is calculated using the following parameters in USD: Au – 1910/Oz (Troy), Cu 3.80/lb, Mo

40,000/Tonne, and Ag 23.40/Oz (Troy) . Prices are 12 month average for 2023 closing price, and the

Formula AuEq = Au (g/t) + ((Cu (ppm) * 0.00014) + (Mo (ppm) * 0.00065) + (Ag (g/t)*0.01225)) assuming

100% recovery rates.

Abbreviations Used in this Release

Ag Silver

Au Gold

AuEq. Gold Equivalent

Cu Copper

Cu Eq. Copper Equivalent

g/t Grams per tonne

km Kilometres

m Metres

Qualified Person

The technical and scientific information contained in this news release has been reviewed and approved

for release by Andrew Chubb, the Company's Qualified Person as defined by National Instrument 43-101.

Mr. Chubb is the Company's Chief Executive Officer and holds an Economic Geology degree, is a Member

of the Australian Institute of Geoscientists (AIG) , and is a Member of the Society of Economic Geologists

(SEG). Mr. Chubb has over 20 years of experience in international mineral exploration and mining project

evaluation.

AWALÉ Resources Limited

On behalf of the Board of Directors

“Andrew Chubb”

Chief Executive Officer

6 | A w a l é R e s o u r c e s L t d .

FOR FURTHER INFORMATION, PLEASE CONTACT:

Andrew Chubb, CEO

(+356) 99139117

[email protected]

Ardem Keshishian, VP Corporate Development & Investor Relations

+1 (416) 471-5463

[email protected]

The Company’s public documents may be accessed at www.sedarplus.com. For further information on the Company, please visit our website at

www.awaleresources.com.

Forward-Looking Information

This press release contains forward -looking information within the meaning of Canadian securities laws

(collectively "forward-looking statements"). Forward-looking statements are typically identified by words

such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those,

which, by their nature, refer to future events. All statements that are not statements of historical fact are

forward-looking statements. Forward-looking statements in this press release incl ude but are not limited

to statements regarding, the Company's presence in Côte d'Ivoire and ability to achieve results, creation

of value for Company shareholders, achievements under the Newmont JV, works on other properties,

planned drilling, commencement of operations. Although the Company believes any forward -looking

statements in this press release are reasonable, it can give no assurance that the expectations and

assumptions in such statements will prove to be correct. Factors that could cause actual results to differ

materially from such forward-looking information include, but are not limited to, changes in the state of

equity and debt markets, fluctuations in commodity prices, delays in obtaining required regulatory o r

governmental approvals, and other risks involved in the mineral exploration and development industry,

including those risks set out in the Company's management's discussion and analysis as filed under the

Company's profile at www.sedarplus.ca. Forward-looking information in this news release is based on the

opinions and assumptions of management considered reasonable as of the date hereof, including that all

necessary governmental and regulatory approvals will be received as and when expected. Although the

Company believes that the assumptions and factors used in preparing the forward-looking information in

this news release are reasonable, undue reliance should not be placed on such information. The Company

disclaims any intention or obligation to update or revise any forward -looking information, other than as

required by applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.