Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ARIC.V ·

Awalé Confirms BBM's Continuity with 2.0 g/t Gold Equivalent over 72 Metres and Looks Toward Underground Potential

Drill Results

Awalé Confirms BBM's Continuity with 2.0 g/t

Gold Equivalent over 72 Metres and Looks

Toward Underground Potential

Highlights

BBM keeps delivering: Thick and consistent gold-copper mineralization highlighted by 2.0 g/t

AuEq. over 72m (OEDD-157, twin hole to OEDD-74 for metallurgy studies).

Multiple strong intervals, including 2.0 g/t AuEq. over 32m (including 7.4 g/t AuEq. over 2m) and

1.1 g/t AuEq. over 27m, reinforcing continuity.

MRE on track: BBM is emerging as the largest gold-copper discovery in West Africa with

strengthening confidence ahead of a Mineral Resource Estimate targeted for Q2 2026.

Scale continues to build with mineralization now defined over ~1.2 km of strike and to depths

exceeding 300m and now targeting 600m vertical depth.

Underground potential emerging at BBM, with high-grade core open down-plunge and 7,000m

step-down assays pending.

Toronto, Ontario--(Newsfile Corp. - February 23, 2026) -

Awalé Resources Limited (TSXV: ARIC)

(OTCQX: AWLRF) (FSE: 2F60)

("

Awalé

" or the "

Company

") is pleased to report new drilling results

from the first 12 holes of its resource and expansion drilling program at the BBM gold-copper discovery

within the Odienné Project ("

Odienné

" or the "

Project

") in Côte d'Ivoire. The latest assays confirm

strong grade continuity and thickness at BBM, continuing to build confidence as Awalé advances toward

its initial Mineral Resource Estimate ("MRE") targeted for Q2 2026. Importantly, Awalé has also

completed an 11-hole, 7,000-metre step-down program targeting the down-plunge extension of BBM's

high-grade core, designed to test underground potential to approximately 600 metres vertical depth.

Assays for this deeper program are pending (see long section and plan map in Figures 2 and 3).

Andrew Chubb, President and CEO of Awalé Resources stated, "BBM continues to deliver with

consistent grade and width and is showing the growth potential we expect from this significant gold-

copper discovery. The robust nature of mineralization gives increasing confidence in our upcoming

mineral resource estimate. In parallel with this shallow infill program, we have systematically drill-tested

the down-plunge extension of the high-grade shoot that forms the core of the BBM mineralization. This

deeper drilling has the potential to see BBM emerge as the largest gold-copper deposit in West Africa.

The shoot, or core of the BBM mineralization we have drilled, shows early indications of increasing

grade at depth, and we eagerly await results from this deeper drilling over the coming weeks."

Link to All Figures

Watch Video of CEO Andrew Chubb Discussing New Results from BBM

BBM Underground Target Drilling

An 11-hole, 7,000-metre program formed part of a step-down and resource phase of diamond drilling

designed to evaluate the underground potential of the BBM target. This phase of drilling aimed to test

continuity of the high-grade core of the BBM system down to a depth of 600 metres below surface.

If successful, further step-out drilling will be planned to test this zone to a depth of 800m below surface.

The high-grade gold, molybdenite, and copper mineralization is associated with a marked increase in

strain intensity and silica-biotite alteration along the subvertical to south-southwest contact between a

sheared granodiorite host and footwall metasediments and metavolcanics.

Results from this deeper drilling will play a key role in assessing the long-term scale and underground

potential of the BBM system. Higher-grade intervals intercepted withing this shoot are summarized in

Table 1.

Table 1: Selected Higher-Grade Intercepts from the Plunging Shoot at BBM

Hole ID

From

(m)

To

(m)

Width

(m)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Mo

(ppm)

AuEq.

(80%)

Comp.

Trigger

(Au g/t)

OEDD0074

265

286

21

3.1

0.55

1.9

329

3.1

2

OEDD0074

304

315

11

3.6

0.45

1.5

349

3.4

2

OEDD0097

461

471

10

2.1

0.46

1.2

137

2.2

2

OEDD0104

326

338

12

2.8

0.84

3.8

704

3.2

2

OEDD0105

93

103

10

2.4

0.54

1.8

511

2.5

2

OEDD0119

208

223

15

3.6

0.52

1.8

479

3.4

2

OEDD0152

523

544

21

3.2

0.68

2.1

534

3.3

2

OEDD0153

657

669

12

2.2

0.43

1.8

359

2.2

2

OEDD0157

241

246

5.00

3.7

0.38

1.3

582

4.6

2

OEDD0157

261

268

7.00

2.9

0.68

1.8

383

4.1

2

OEDD0157

272

275

3.00

5.9

0.80

3.3

204

7.2

2

OEDD0157

298

308

10.00

3.9

0.48

1.3

309

4.7

2

BBM Resource Drilling

These results mark the second batch of assays from Awalé's 2026 resource development drilling across

BBM, Charger, and Empire, forming part of the Company's 100,000-metre drill campaign at Odienné.

The 12 holes reported in this release form part of a 20-hole resource drilling program designed to

support an initial mineral resource estimate for the BBM target in Q2 2026. This phase of drilling is

testing the continuity of the BBM mineralized system to a depth of 300 metres below surface and further

defining the geometry and grade distribution of the mineralized zones. Hole OEDD-157 was drilled as a

twin to previously reported OEDD-74 as part of broader metallurgical studies where several other holes

along with this twin hole were selected to give a representative sample for the study.

BBM Exploration

An initial two-hole diamond drill program has also been completed as a step-out to the northwest of the

resource drill area, with the aim of better understanding the geology and tenor of mineralization

associated with a modelled second plunging shoot.

If successful, further drilling will be planned to step down at depth and along strike to open additional

mineralization potential and near-surface opportunities within the BBM system.

About Awalé Resources

Awalé is a diligent and systematic mineral exploration company focused on discovering large high-

grade gold and copper-gold deposits. Exploration activities are currently underway in the underexplored

regions of Côte d'Ivoire, where the Company is exploring the Odienné Copper-Gold Project ("

Odienné

"

or the "

Project

"), covering 2,346 km

2

across seven permits-five granted and two applications. This

includes 797 km

2

in two permits held under the Awalé-Newmont Joint Venture ("OJV"). Awalé currently

manages all exploration activities over the OJV, with funding currently provided by Newmont Ventures

Limited ("Newmont") under an Exploration Agreement signed in May 2022.

Awalé has discovered four gold, gold-copper, and gold-copper-silver-molybdenum mineralized systems

within the OJV and has recently commenced exploration on its 100%-owned properties.

The Odienné Project is underexplored and has multiple pipeline prospects with similar geochemical

signatures to Iron Oxide Copper Gold (

IOCG

) and intrusive-related mineral systems with substantial

upside potential. The Company benefits from a skilled and well-seasoned technical team that allows it to

continue exploring in a pro-mining jurisdiction that offers significant potential for district-scale

discoveries.

Table 2: Significant Intercepts from Diamond Drilling - (from this release)

Hole ID

From

(m)

To

(m)

Width

(m)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Mo

(ppm)

AuEq.

(80%)

Comp.

Trigger

(Au g/t)

OEDD0157

229

230

1.0

1.3

0.62

3.3

340

1.9

0.5

OEDD0157

238

310

72.0

1.8

0.36

1.1

266

2.0

0.2

including

238

276

38.0

2.1

0.47

1.5

376

2.4

0.5

and

241

246

5.00

3.7

0.38

1.3

582

4.6

2

Including

245

246

1.0

6.1

0.27

1.1

598

5.5

5

and

261

268

7.00

2.9

0.68

1.8

383

4.1

2

and

272

275

3.00

5.9

0.80

3.3

204

7.2

2

and

272

274

2.0

7.6

0.89

3.5

244

7.2

5

including

282

289

7.0

0.6

0.20

0.8

119

0.8

0.5

including

296

309

13.0

3.3

0.45

1.2

289

3.3

0.5

and

298

308

10.00

3.9

0.48

1.3

309

4.7

2

and

298

303

5.0

5.3

0.56

1.7

335

5.0

5

OEDD0160

287

314

27.0

0.6

0.22

0.9

190

0.8

0.2

including

289

296

7.0

1.2

0.28

1.0

276

1.4

0.5

and

308

311

3.0

0.9

0.46

3.0

589

1.6

0.5

334

340

6.0

0.3

0.32

1.0

27

0.6

0.2

351

353

2.0

0.7

0.80

2.1

59

1.5

0.2

OEDD0162

55

58

3.0

0.4

0.33

1.5

198

0.8

0.2

133

160

27.0

0.4

0.41

2.4

37

0.8

0.2

including

145

149

4.0

1.1

0.77

4.1

49

1.8

0.5

and

154

156

2.0

1.0

1.26

8.2

55

2.3

0.5

OEDD0164

198

204

6.0

0.8

0.82

1.7

125

1.6

0.2

including

198

203

5.0

0.9

0.91

1.9

136

1.8

0.5

OEDD0167

266

271

5.0

1.3

0.03

0.3

29

1.1

0.2

including

266

268

2.0

2.6

0.06

0.4

62

2.2

0.5

OEDD0168

223

231

8.0

0.9

0.28

0.7

154

1.1

0.2

including

223

229

6.0

1.0

0.34

0.8

201

1.3

0.5

290

292

2.0

1.5

0.65

1.8

66

2.0

0.5

OEDD0171

50

56

6.0

0.6

0.31

1.3

221

0.9

0.2

62

74

12.0

0.4

0.36

1.3

107

0.8

0.2

including

63

67.5

4.5

0.5

0.49

1.5

128

1.0

0.5

94.5

142

47.5

0.5

0.42

2.1

35

0.9

0.2

including

110

121

11.0

0.9

0.71

3.7

56

1.6

0.5

and

129

133

4.0

1.0

0.66

3.4

36

1.6

0.5

BBDD0002

172

174

2.0

1.8

0.36

1.8

22

1.9

0.2

including

172

173

1.0

3.4

0.62

3.0

36

3.4

0.5

224

273

49.0

0.5

0.37

1.9

36

0.9

0.2

including

230

237

7.0

0.8

0.19

0.9

12

0.8

0.5

and

241

247

6.0

0.6

0.39

1.5

16

0.9

0.5

and

251

269

18.0

0.6

0.54

3.0

58

1.1

0.5

BBDD0003

324

350

26.0

0.7

0.53

1.2

197

1.3

0.2

including

331

349

18.0

0.9

0.64

1.4

199

1.6

0.5

383

427

44.0

0.8

0.25

0.7

360

1.1

0.2

including

387

400

13.0

1.2

0.21

0.6

263

1.3

0.5

and

406

427

21.0

0.9

0.27

0.7

217

1.1

0.5

BBDD0005

164

165

1.0

2.7

1.15

5.3

207

3.5

0.5

229

256

27.0

1.0

0.18

0.8

237

1.1

0.5

BBDD0007

51

61.5

10.5

0.4

0.24

1.6

14

0.6

0.2

66

88

22.0

0.4

0.43

1.8

23

0.8

0.2

including

57.5

61.5

4.0

0.7

0.39

2.8

18

1.0

0.5

76

80

4.0

0.6

0.53

2.0

29

1.1

0.5

85

87

2.0

0.6

0.59

2.4

28

1.1

0.5

101

102

1.0

1.6

0.11

1.1

5

1.4

0.5

BBDD0012

97.5

98

0.5

13.1

2.38

9.9

32

13.1

0.5

157

168

11.0

2.2

0.12

0.9

27

1.9

0.2

including

158

165

7.0

3.3

0.17

1.3

38

2.9

0.5

and

158

159

1.0

6.2

0.18

3.3

28

5.2

5

and

160

162

2.0

5.9

0.34

2.0

62

5.1

5

280

281

1.0

1.2

0.05

0.4

3

1.0

0.5

including

285

317

32.0

1.9

0.34

1.4

180

2.0

0.5

including

288

290

2.0

7.2

0.71

4.5

149

6.6

5

and

311

313

2.0

6.6

1.09

3.8

1622

7.4

5

Table 3: BBM Drill Collar Details - (all collars from this release)

Hole ID

Easting

Northing

RL_M

EOH_M

Azimuth_True

Dip

BBDD0002

655453.4

1048191.8

425.6

308.25

28.73

-58.45

BBDD0003

655376.0

1048140.7

426.3

460.8

34.9

-55

BBDD0005

656057.9

1047843.0

419.8

296.36

34.5

-55.1

BBDD0007

655414.4

1048316.1

423.4

140.38

39.8

-52.2

BBDD0012

655671.0

1048089.5

419.6

415

24.5

-59

OEDD0157

655921.5

1047962.6

415.5

335.87

24.01

-61.72

OEDD0160

655721.2

1048437.8

415.4

395.24

213.97

-61.12

OEDD0162

655541.7

1048214.1

423.5

181

34.56

-56.23

OEDD0164

655734.1

1048326.1

417.0

266.39

214.31

-58.28

OEDD0167

655689.0

1048390.1

417.4

344.22

215.6

-59.63

OEDD0168

655775.2

1048379.6

414.8

329.16

215

-58

OEDD0171

655605.7

1048185.8

421.7

191.5

34.9

-55

Quality Control and Assurance

Analytical work for drill samples is being carried out at the independent Intertek Laboratories in Ghana

and Australia, an ISO 17025 Certified Laboratory. Samples are prepared and stored at the Company's

field camps and put into sealed bags until collected by Intertek from the Company's secure Odienné

office and transported by Intertek to their preparation laboratory in Yamoussoukro, Côte d'Ivoire, for

preparation. Samples are logged in the tracking system, weighed, dried, and pulverized to greater than

85%, passing a 75-micron screen. Two pulps are prepared from each sample with one stream to

Intertek Ghana for fire assay and a second to Australia where the sample is analyzed by 52 element

ICP/MS with a 4-Acid digest. Blanks, duplicates, and certified reference material (standards) are being

used to monitor laboratory performance during the analysis. Where visible gold is observed in drill core,

a quartz wash is applied between every sample to reduce or eliminate any contamination. Once fire

assay results are received, samples over 5 g/t gold are routinely screen fire assayed, samples lower

than 5 g/t gold continued within a high-grade interval are also screen fire assayed.

Mineralized Interval Calculations

Significant intervals reported in this news release are calculated as downhole length-weighted

intercepts. For the Charger target, initial mineralized zones are calculated at a 0.5 g/t Au trigger and

include up to 3 metres of internal waste for delineating mineralized zones. Included intervals are

calculated at 2 g/t Au, 5 g/t Au, and 10 g/t Au trigger values, with up to 3 metres of internal waste. Table 2

contains a list of all Charger holes reported in this release. True widths are estimated to be 70% of the

downhole widths. Holes not reported do not make the 0.5 g/t Au grade trigger.

Au Equivalent Calculations

Au Equivalent is calculated using the following parameters in USD: Au - 1910/Oz (Troy), Cu 3.80/lb, Mo

40,000/Tonne, and Ag 23.40/Oz (Troy). The Formula AuEq = Au (g/t) + ((Cu (ppm) * 0.00014) + (Mo

(ppm) * 0.00065) + (Ag (g/t)*0.01225)). An 80% metallurgical recovery is assumed for all metals, as the

specific recovery rates for individual metals are unclear, and assuming different recoveries would be

premature at this stage.

Qualified Person

The technical and scientific information contained in this news release has been reviewed and approved

for release by Andrew Chubb, the Company's Qualified Person as defined by National Instrument 43-

101. Mr. Chubb is the Company's Chief Executive Officer and holds an Economic Geology degree, is a

Member of the Australian Institute of Geoscientists (AIG), and is a Member of the Society of Economic

Geoscientists (SEG). Mr. Chubb has over 25 years of experience in international mineral exploration and

mining project evaluation.

Abbreviations Used in this Release

Ag

Silver

Au

Gold

AuEq.

Gold equivalent

Cu

Copper

g/t

Grams per tonne

km

Kilometres

m

Metres

MRE

Mineral Resource Estimate

Mo

Molybdenum

ppm

Parts per million

AWALÉ Resources Limited

On behalf of the Board of Directors

"Andrew Chubb"

Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:

Andrew Chubb, CEO

(+356) 99139117

[email protected]

Ardem Keshishian, VP Corporate Development

+1 (416) 471-5463

[email protected]

The Company's public documents may be accessed at

www.sedarplus.com

. For further information on the Company, please visit our website at

www.awaleresources.com

.

Forward-Looking Information

This news release contains forward-looking information within the meaning of Canadian securities

laws (collectively "forward-looking statements"). Forward-looking statements are typically identified by

words such as: believe, expect, anticipate, intend, estimate, plans, propose, potential, postulate and

similar expressions, or are those, which, by their nature, refer to future events. All statements that are

not statements of historical fact are forward-looking statements. Forward-looking statements in this

news release include but are not limited to statements regarding the Company's presence in Côte

d'Ivoire and ability to achieve results, creation of value for Company shareholders, achievements

under the Newmont JV, works on other properties, timing and extent of planned drilling, expectations

to achieve a first mineral resource estimate and preliminary economic assessment, advancing

towards a pre-feasibility study, potential for new discoveries, timing for providing assay results,

commencement of operations. Although the Company believes any forward-looking statements in this

news release are reasonable, it can give no assurance that the expectations and assumptions in such

statements will prove to be correct. Factors that could cause actual results to differ materially from

such forward-looking information include, but are not limited to, the results of the proposed drilling

programs, the number of drilling rigs on site, changes in the state of equity and debt markets,

fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals,

and other risks involved in the mineral exploration and development industry, including those risks

set out in the Company's management's discussion and analysis as filed under the Company's

profile at

www.sedarplus.ca

. Forward-looking information in this news release is based on the opinions

and assumptions of management considered reasonable as of the date hereof, including that all

necessary governmental and regulatory approvals will be received as and when expected and that the

proposed drilling program will proceed as planned. Although the Company believes that the

assumptions and factors used in preparing the forward-looking information in this news release are

reasonable, undue reliance should not be placed on such information. The Company disclaims any

intention or obligation to update or revise any forward-looking information, other than as required by

applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/284808