TORONTO, ON, December 1, 2022 – Aclara Resources Inc. (“Aclara” or the “Company”) (TSX: ARA) is pleased
to announce an updated Mineral Resource Estimate (“Updated Mineral Resource Estimate” or “Updated
MRE”) for its Rare Earth Element ( “REE”) project, Penco Module (“Project”), located in the BioBio Region of
Chile.
Following drilling campaigns carried out during 2021 and 2022, a total of 5,298 m from 175 new drill holes
have been completed and incorporated into the Updated MRE. This work has resulted in both the definition
of a new resource area, Alexandra Poniente, as well as an increase in the Mineral Resources within the
Project area.
Aclara is planning to incorporate these results into a Feasibility Study for the Project, to be developed during
2023.
The exploration and infill drilling program resulted in:
• The addition of Measured, Indicated, and Inferred Mineral Resources at Alexandra Poniente, a new
area within the Project area to the north-west of Alexandra Oriente.
• The conversion of Inferred Mineral Resources from Luna, Victoria Norte, Alexandra Oriente, Victoria
Sur, and Maite into Measured and Indicated Mineral Resources.
A comparison of the Updated Mineral Resource Estimate and the mineral resource estimate presente d in
the “Amended and Restated NI 43 -101 Technical Report – Preliminary Economic Assessment for Penco
Module Project – Penco, Biobio Region, Chile” with an effective date of September 15, 2021, as prepared by
Ausenco Chile Limitada and filed on December 2 , 2021 (the “Technical Report”) (which is available under
the Company’s profile on SEDAR at www.sedar.com) is presented in Table 1, and highlights an increase of
32.6% in Measured and Indicated Resources and a decrease of 19.3% in Inferred Mineral Resources. Drilling
success at the Project was tempered by a higher cut -off value at the Project, reflecting changes to some
input prices. The Updated MRE (October 13, 2022) is presented in
Table 2 and the Previous MRE (September 15, 2021) is presented in Table 3.
Table 1: Updated Mineral Resource Estimate Comparison to Previous Mineral Resource Estimate
Category
MRE (Sept 15, 2021) MRE (Oct 13, 2022) Variation
Tonnage Contained
TREO Tonnage Contained
TREO Tonnage Contained TREO
(Mt) (kt) (Mt) (kt) (Mt) (%) (kt) (%)
Measured 15.4 37.9 21.3 49.3 5.9 38.2% 11.4 30.0%
Indicated 5.3 12.3 6.2 13.7 0.9 16.5% 1.4 11.1%
Measured + Indicated 20.7 50.2 27.5 62.9 6.8 32.6% 12.7 25.3%
Inferred 2.1 4.8 1.7 3.4 -0.4 -19.3% -1.4 -29.5%
Notes:
2
1. TREO = Total Rare Earth Oxides (La 2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3) + Yttrium
(Y2O3).
2. Totals may not balance due to rounding of figures.
3. NSR cut-off values: US$13/t (Oct 31, 2022) and US$ 9.79/t (Sept 15, 2021)
Table 2: Updated Mineral Resource Estimate (Effective October 13, 2022)
Category
Tonnage NSR TREO TREY TREY TDYTB TNDPR TDY TND
(Mt) (US$/t) (ppm) (ppm) Recovery (ppm) (ppm) Recovery Recovery
Measured 21.3 28.4 2,315 1,952 22.83% 67 384 43.15% 19.57%
Indicated 6.2 27.4 2,212 1,865 22.80% 64 368 43.49% 19.38%
Measured
+
Indicated
27.5 28.2 2,292 1,932 22.82% 66 380 43.23% 19.53%
Inferred 1.7 24.3 1,999 1,679 22.56% 71 298 39.25% 18.06%
Table 3: Previous Mineral Resource Estimate (Effective September 15, 2021)
Category Tonnage NSR TREO TREY TREY TDYTB TNDPR TDY TND
(Mt) (US$/t) (ppm) (ppm) Recovery (ppm) (ppm) Recovery Recovery
Measured 15.4 27.8 2,467 2,080 17.99% 71 401 35.70% 15.32%
Indicated 5.3 24.5 2,309 1,945 16.67% 69 373 33.30% 13.36%
Measured
+
Indicated
20.7 27.0 2,426 2,045 17.65% 71 394 35.08% 14.82%
Inferred 2.1 24.0 2,299 1,936 16.37% 70 371 32.49% 12.72%
Notes:
1. NSR = Net Smelter Return.
2. NSR cut-off value = US$13/t
3. TREY = Total Rare Earth Elements (La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu ) plus Yttrium.
4. TREO = Total Rare Earth Oxides (La 2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3) + Yttrium
(Y2O3).
5. TDYTB = Total Dysprosium plus Total Terbium.
6. TNDPR = Total Neodymium plus Total Praseodymium.
7. TDY Recovery = Average metallurgical recovery for Dysprosium.
8. TND Recovery = Average metallurgical recovery for Neodymium.
9. Totals may not balance due to rounding of figures.
10. Mineral Resources are not Mineral Reserves, as they do not have demonstrated economic viability. The estimate of Mineral Resources may
be materially affected by environmental, permitting, legal, title, taxation, socio -political, marketing, or other relevant factors.
11. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been i nsufficient
exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resource s.
12. Mineral Resources are classified in accordance with the CIM (2014) Standards and Definitions of Mineral Resources.
13. The results are presented in-situ and undiluted, are constrained within optimized open pit shells, and are considered to have reasonable
prospects of economic viability.
The Updated MRE encompasses four mineralized zones , namely Luna, Maite, Victoria (Victoria Norte and
Victoria Sur) and Alexandra (Alexandra Oriente and Alexandra Poniente). The Updated MRE figures by zone
are presented in Table 44 and grade values for all 15 elements are shown in Table 5.
Updated Mineral Resource Estimate Details
3
Figure 1 highlights the location of the new drill holes, the Mineral Resource pit shells, and the environmental
buffers limiting the Mineral Resources. New drilling incorporated into the Updated MRE was completed
between May 2021 to May 2022.
Figure 1: Location of New Drilling, Constraining Pit Shells, Environmental Constraints, and Project Boundary
Several restricted areas exist within the Project area viz. native forests, the Penco Creek, the Ruta del Itata
highway servitude, and the Al exandra Creek. The Updated MRE does not include any mineralized material
within these areas.
A geological overview for the Project is available the Technical Report under the Company’s profile on SEDAR
at www.sedar.com. The geology, sampling, assay protocols, and QA/QC for the Alexandra Poniente zone
have been presented in Aclara’s news release on brownfield exploration results, dated July 25, 2022, which
is also available on SEDAR, stating that the total grades database shows good precision and accuracy, and
all estimating protocols are in line with standard industry practices.
Estimation Methodology
High-grade capping supported by statistical analyses (Parrish criteria) were completed on raw assay data
before compositing and applying to the Victoria, Alexandra, and Luna zones. No capping was applied to
Maite samples, as the statistical analysis suggested.
4
The Updated MRE was completed using GEOVIA Surpac for four different block models (Luna, Maite,
Victoria, Alexandra zones) each consisting of 10 m x 10 m x 2 m blocks. Grade interpolation for each of the
15 elements was obtained by Ordinary Kriging using hard boundaries.
Variography was done for each of the four domains in the four different zones, for three groups of elements:
Heavy Rare Earth elements plus Yttrium (Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu , Y), Light Rare Earth elements minus
Europium (La, Ce, Pr, Nd, Sm), and Europium (Eu) which showed a poor correlation with the other two groups.
Block estimation was validated visually, by global bias analysis and by trend analysis . Figure 2 shows a
comparison between estimated blocks and composites for a vertical section at the Alexandra Poniente zone.
Additionally, a Whittle pit outline is displayed in the section.
Figure 2: Comparison Between Estimated Blocks and Composites for a Vertical Section at Alejandra Poniente
5
Average bulk density values ranging from 1.25 to 2.0 t/m 3 were assigned to each Geological Unit . In-situ
trench tests were completed at surface (horizon A) and for the deeper horizons (horizons B, C, and D0), and
density was calculated using Shelby tubes.
The Updated MRE is classified as Measured, Indicated, and Inferred Mineral Resources, respectively. For
both Measured and Indicated Mineral Resources, the Kriging estimation error must be less than 15% in 90%
of the cases, for a volume equivalent to three months of production for Measured and one year for Indicated.
The Measured Mineral Resource category is defined by three or more drill holes when the closest sample is
located less than 40 m from the block being estimated, or with two drill holes if the closest sample is located
less than of 24 m from the block being estimated.
The Indicated Mineral Resource category is defined with a minimum of two drill holes when the closest
sample is be less than 65 m from the block being estimated.
The Inferred Mineral Resource category is defined with a ll blocks estimated with samples closer than 160
m.
Figure 3 presents a plan view of the Alejandra block model displaying the three block categories.
Figure 3: Plan View Displaying Block Categories at Alexandra
The Updated MRE is pit-constrained using GEOVIA Whittle 2022 software, with an overall slope angle of 23°
and a mining cost of US$3/t . The Updated MRE is reported at a Net Smelter Return (NSR) marginal cut-off
of US$13/t based on processing plus general and administrative cost estimates.
NSR was calculated for each block using the following parameters:
• Selling prices for rare earth oxides : Price estimates in US$/kg corresponds to those used in the
Technical Report for pit optimization: La 2O3 = 2.62, CeO 2 = 1.88, Pr 6O11 = 92.93, Nd 2O3 = 96.34, Sm 2O3 =
6
2.16, Eu2O3 = 41.40, Gd2O3 = 35.55, Tb4O7 = 1,344.82, Dy2O3 = 537.93, Ho2O3 = 106.65, Er2O3 = 31.76, Tm2O3
= 0.0, Yb2O3 = 6.78, Lu2O3 = 707.97, Y2O3 = 6.78.
• Metallurgical recoveries : Obtained from the 2021/22 laboratory test program performed by SGS
Lakefield in Canada, consisting of 119 representative samples tested under conditions which carry out
desorption at a pH of 3.0, plus a synthetic lixiviant solution designed to emulate the predicted
concentrations of recycled salts generated in the closed -circuit process. For each Geological Unit, the
median of the corresponding laboratory results was assigned. For some minor Geological Units with no
available laboratory results, the 2021 PEA recover y values were used. See Table 66 at the end of this
news release.
• Plant efficiency: Variable by element, ranging from 90.5 to 99.1% with an approximate average of 94%.
• Concentrate treatment and selling cost = $0.5034/kg of concentrate
• Concentrate purity = 83%
The Technical Report provides the basis for the assumptions used in the Updated MRE, unless otherwise
stated. All technical and economic parameters will be subject to further consideration during the preparation
of the Feasibility Study, which is expected to be developed during 2023.
Neither the authors of this news release nor the management of Aclara are aware of any environmental,
permitting, legal, title-related, taxation, socio-political, marketing, or any other relevant issue not reported in
the Technical Report that could materially affect the Updated MRE other than the information included in
Aclara’s news release, dated May 10, 2022, which is also available on SEDAR, where the Company provided
an update on its corporate strategy.
Qualified Persons and Review of Technical Information
The Updated MRE has been prepared by Andres Beluzan (General Manager, ABelco Consulting SpA), an
independent consultant for geostatistics and resource estimation with more tha n 12 years of relevant
experience. Mr. Beluzan, who is responsible for the Updated MRE, and has reviewed and approved the
scientific and technical information related to the Updated MRE contained in this news release, is registered
under the Chilean Mining Commission and is an independent Qualified Person under NI 43 -101.
The scientific and technical information related to geology, drilling, mineralization, and geological modeling
in this news release has been reviewed and approved by Luis Oviedo (General Manager, Atticus Chile S.A.),
an independent Consulting Geologist with more than 45 years’ experience. Mr. Oviedo is a member of the
Colegio de Geólogos de Chile and the Institute of Mining Engineers of Chile , is registered under the Chilean
Mining Commission and is an independent Qualified Person under NI 43-101.
Manuel Arre ( Head of Mine Engineering, Aclara), a mining engineer with 20 years’ experience in economic
modeling of mining projects, has produced pit shells to constrain the resources for reasonable prospects of
eventual economic extraction. Mr. Arre is registered under the Chilean Mining Commission and is a Qualified
Person under NI 43-101. He has led an internal peer review for the Updated MRE.
7
About Aclara
Aclara Resources is a Rare Earths co mpany with a development project in Chile, and is listed on the TSX
(TSX:ARA).
Aclara is initiating the development of its resources through a project called the Penco Module, which covers
a surface area of approximately 600 hectares, and which hosts ionic clays rich in rare earth elements. Aclara
is currently focused on the development and future construction and operation of the Penco Module, which
will aim to produce a rare earth concentrate through a processing plant that will be fed by clays from nearby
deposits. Aclara’s extraction process offers several environmentally positive attributes such as: no blasting,
crushing, or milling; no tailings facility; minimal water consumption due to a high level of water recirculation;
is amenable to leaching with a fertilizer; and contains no radioactivity.
Contact Information
For further information, please visit www.aclara-re.com or contact: [email protected] or
Forward-Looking Statements
This news release contains “forward-looking information” within the meaning of applicable securities legislation, which
reflects the Company’s current expectations regarding future events, including statements with regard to mineral
continuity, grade and upside at the Alexa ndra Poniente zone and the Company’s expectations in respect thereof, the
Updated MRE in respect of the Project and the estimates contained therein, the Company’s proposed Feasibility Study
and the Expected timing and contents in respect thereof. , Forward -looking information is based on a number of
assumptions and is subject to a number of risks and uncertainties, many of which are beyond the Company’s control.
Such risks and uncertainties include, but are not limited to, the factors discussed under “Risk Factors” in the Company’s
annual information form dated as of March 30, 2022, filed on the Company’s SEDAR profile. Actual results and timing
could differ materially from those projected herein. Unless otherwise noted or the c ontext otherwise indicates, the
forward- looking information contained in this news release is provided as of the date of this news release and the
Company does not undertake any obligation to update such forward -looking information, whether because of new
information, future events or otherwise, except as expressly required under applicable securities laws.
8
Table 4: Updated Mineral Resource Estimate (Effective October 13, 2022), Detail by Zone
Zone Category
Tonnage NSR TREO TREY TREY TDYTB TNDPR TDY TND
(Mt) (US$/t) (ppm) (ppm) Recovery (ppm) (ppm) Recovery Recovery
Alexandra O.
Measured 4.01 27.8 2429 2044 20.09% 78 383 41.88% 10.16%
Indicated 1.11 25.5 2316 1951 18.96% 71 375 41.66% 10.07%
M + I 5.12 27.3 2,404 2,024 19.84% 76 381 41.83% 10.14%
Inferred 0.22 23.0 2,175 1,832 18.27% 69 351 39.89% 9.37%
Alexandra P.
Measured 4.11 27.8 2065 1745 23.58% 54 358 46.95% 24.08%
Indicated 1.09 27.8 1911 1613 26.03% 52 331 49.40% 27.53%
M + I 5.21 27.8 2,033 1,717 24.09% 53 352 47.47% 24.80%
Inferred 0.38 22.8 1,420 1,199 28.21% 38 247 53.02% 32.48%
Luna
Measured 1.68 25.1 1545 1295 29.27% 66 211 42.38% 20.20%
Indicated 0.47 24.8 1417 1185 33.87% 64 184 44.24% 23.60%
M + I 2.15 25.1 1,517 1,270 30.28% 66 205 42.79% 20.95%
Inferred 0.60 27.5 2,077 1,734 25.55% 99 249 33.44% 15.15%
Maite
Measured 3.93 30.5 2501 2110 21.25% 71 421 41.43% 16.93%
Indicated 1.59 30.8 2510 2117 21.47% 72 422 41.47% 16.91%
M + I 5.52 30.6 2,504 2,112 21.32% 71 421 41.44% 16.92%
Inferred 0.02 35.3 2,893 2,439 21.78% 82 481 41.50% 16.90%
Victoria N.
Measured 5.73 30.6 2695 2274 23.53% 70 457 42.01% 23.81%
Indicated 0.87 29.3 2566 2166 23.98% 64 439 43.54% 25.07%
M + I 6.60 30.4 2,678 2,259 23.59% 69 455 42.22% 23.98%
Inferred 0.14 20.4 2,364 1,993 17.30% 65 379 31.20% 18.32%
Victoria S.
Measured 1.81 22.8 1741 1468 22.51% 54 292 45.40% 21.94%
Indicated 1.04 23.6 2027 1710 19.46% 59 341 41.91% 17.78%
M + I 2.86 23.1 1,845 1,557 21.40% 56 310 44.13% 20.42%
Inferred 0.34 22.2 2,195 1,852 15.88% 62 364 36.81% 12.65%
Notes:
1. NSR = Net Smelter Return
2. NSR cut-off value = US$13/t
3. TREY = Total Rare Earth Elements (La, Ce, Pr, Nd, Sm , Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu) plus Yttrium.
4. TREO = Total Rare Earth Oxides (La 2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3) + Yttrium
(Y2O3).
5. TDYTB = Total Dysprosium plus Total Terbium.
6. TNDPR = Total Neodymium plus Total Praseodymium.
7. Totals may not balance due to rounding of figures.
8. Mineral Resources are not Mineral Reserves, as they do not have demonstrated economic viability. The estimate of Mineral Resources may
be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
9. The quantity and grade of reported Inferred Mineral Resources in this estimation are uncertain in nature and there has been i nsufficient
exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resources.
10. Mineral Resources are classified in accordance with the CIM (2014) Standards and Definitions of Mineral Resources.
11. The results are presented in-situ and undiluted, are constrained within optimized open pit shells and are considered to have reasonable
prospects of economic viability.