Altiplano Reports January Production Results with Increased Revenue
Altiplano Reports January Production Results
with Increased Revenue
Edmonton, Alberta--(Newsfile Corp. - March 2, 2021) -
Altiplano Metals Inc
. (TSXV: APN) (WKN:
A2JNFG) ("
Altiplano
" or the "Company") is pleased to report on the January 2021 production results of
from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile.
During January 2021, Farellon produced approximately 3,480 tonnes of mineralized Cu/Au material at
an approximate grade of 1.8% copper with shipments for processing totaling 2,770 tonnes. January
revenue (after processing costs) generated US$220,000 from the sale of 151,960 pounds of copper
compared with US$150,000 and 90,660 pounds of copper in December. At January month end, an
additional 610 tonnes were stockpiled and available to be shipped.
CEO, Alastair McIntyre commented, "I am pleased to see January's revenue and grade improve as we
begin the new year. Our development to the SW beyond the intrusive dyke has been completed on the
389 m SW and 382 m SW levels where we can now return our focus on advancement and production. I
am also encouraged to see the copper grade along the SW 389 m and 382 m level drifts improve from
1.2% to 1.7% previously recovered from the upper levels on the 395 m SW and 401 m SW drifts. This
demonstrates that copper grade is improving with depth as anticipated. Furthermore, we are also
encouraged by the stronger copper market that has broken the US$4.20/pound level and is in close
range to break the all-time high of $4.63/pound set in 2011. With strong demand fundamentals and
investor sentiment, the copper market looks very constructive."
Figure 1. Monthly Review of Farellon Output and Grade
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_001full.jpg
Figure 2. Monthly Processed Material, Income and Mining Cost at Farellon
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_002full.jpg
Figure 3. Five Year Copper Chart
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_003full.jpg
Figure 4. Illustration of Underground Operations at Farellon
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_004full.jpg
* The decision to commence production on the Farellon deposit is not based on a feasibility study of mineral reserves demonstrating economic
and technical viability and there is increased uncertainty and economic and technical risks of failure associated with the production decision.
Further development of the Hugo Decline is scheduled to extend the underground workings at depth to
access the 370 m level. This work will provide two additional development headings to access the NE -
SW trending vein system at the 370 m working level. These new access points will bring the total number
of development headings to eight once fully operational. The Hugo decline extension to the new 370 m
level will be approximately 50 m and is expected to begin in March.
Figure 5. Jackleg Drilling on the 376 m SW level
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_005full.jpg
Figure 6. Jumbo working on the 376 m level
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/4303/75840_7d0e01f5a461bb63_006full.jpg
COVID-19 Update:
The Government of Chile announced that its borders reopened to visitors on
November 23, 2020 (
https://chile.travel/en/coronavirus
) where travel to the country is permitted with some
limitations and requirements.
The health and safety of our employees, contractors, visitors, and the local
community remain our top priorities.
Altiplano continues to follow the COVID-19 guidance issued by the
Federal and Provincial Governments of Canada and Chile. Mine site safety and hygiene protocols (such
as: disinfection points for hand washing and supply of face masks) remain in place in order to keep
employees and stakeholders safe and to limit any spread at site or within the broader community
About Altiplano
Altiplano Metals Inc. (TSXV: APN) is a Canadian mining company focused on the acquisition and
development of near-term cash flowing assets and exploration projects of significant scale. Altiplano's
goal is to grow into a mid-tier producer of copper, gold and silver with immediate plans of generating
profits from three cash flowing projects in 2021. Management has a substantial record of success in
capitalizing on opportunity, overcoming challenges and building shareholder value.
John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed and
approved the technical contents of this document.
Altiplano is part of the Metals Group of companies, managed by an award-winning team of professionals
who stand for technical excellence, painstaking project selection and uncompromising corporate
governance, with a proven ability to capitalize on investment opportunities and deliver shareholder
returns.
ON BEHALF OF THE BOARD
/s/ "John Williamson"
Chairman
For further information, please contact:
Jeremy Yaseniuk, Director
Tel: (604) 773-1467
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
This release includes certain statements that may be deemed "forward-looking statements". All
statements in this release, other than statements of historical facts, that address exploration drilling,
exploitation activities and events or developments that the Company expects are forward-looking
statements. A qualified person has not done sufficient work to classify any historical estimates as
current mineral resources or mineral reserves and the issuer is not treating the historical estimates as
current mineral resources or mineral reserves. The Farellon mine was previously in production dating
back to the 1970's with a reported historical production (to a depth of 70 m) yielding approximately
300,000 tonnes at an average grade of 2.5% copper and 0.5g/t gold. This material was processed
locally and sold to ENAMI. Altiplano is relying upon past production records, underground sampling
and related activities and current diamond drilling to estimate grade and widths of the mineralization
to reactivate production. The decision to commence production on the Farellon deposit is not based
on a feasibility study of mineral reserves demonstrating economic and technical viability and there is
increased uncertainty and economic and technical risks of failure associated with any production
decision. Although the Company believes the expectations expressed in such forward-looking
statements are based on reasonable assumptions, such statements are not guarantees of future
performance and actual results or developments may differ materially from those in the forward-
looking statements. Factors that could cause actual results to differ materially from those in forward-
looking statements include market prices, exploitation and exploration successes, continuity of
mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and
delays due to third party opposition, changes in government policies regarding mining and natural
resource exploration and exploitation, and continued availability of capital and financing, and general
economic, market or business conditions. Investors are cautioned that any such statements are not
guarantees of future performance and actual results or developments may differ materially from those
projected in the forward-looking statements. For more information on the Company, investors should
review the Company's continuous disclosure filings that are available at
www.sedar.com
.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/75840