HIGH SULFIDATION AND PORPHYRY GOLD SYSTEM IN BOLIVIA

Phase II drilling confirmed that the San Pablo Project

has many of the characteristics of a porphyry gold system

Toronto, Ontario , September 7, 202 2 - Andean Precious Metals Corp. (TSXV:APM)

(OTCQX:ANPMF) (“Andean” or the “Company”) is pleased to report results received to date from

the Company’s phased drilling program being carried out at its wholly owned San Pablo gold project

in Bolivia.

San Pablo: Select Drilling Highlights

Phase I

• 53.80 m at 1.17 g/t Au in hole SP21-01

• 23.10 m at 0.47 g/t Au in hole SPW21-04

• 92.75 m at 0.37 g/t Au in hole SPW21-04

• 97.80 m at 0.30 g/t Au in hole SPW21-03

• 108.40 m at 0.29 g/t Au in hole SPW21-01

Phase II

• 4.50 m at 6.19 g/t Au, 67.07 g/t Ag, 0.41 % Pb and 0.47% Zn in hole SP22-03

• 2.60 m at 1.97 g/t Au, 331.23 g/t Ag, 1.78% Cu, 2.20% Pb and 4.93% Zn in hole SP22-03

• 13.70 m at 0.71 g/t Au in hole SP22-03

“We are pleased with the initial results of the exploration program at our San Pablo project. Phase

II drilling has confirmed a high sulfidation and porphyry gold system that demonstrates the potential

to host gold mineralization at these targets, which have similarities to other major gold occurrences

in Bolivia,” said Simon Griffiths, President and CEO of Andean.

Bolivia is an underexplored and highly prospective mining jurisdiction where Andean’s subsidiary,

Empresa Minera Manquiri, operates the only commercial scale oxide processing plant . Until now,

no modern-day exploration has been conducted on the San Pablo property, located in the heart of

one of the world’s oldest and most mineral rich mining jurisdictions.

The 100% owned San Pablo project, that comprises 650 hectares, is situated in the Department of

Potosí in the southern part of the prolific Bolivian tin-silver and polymetallic belts. This region hosts

several of Bolivia's largest mines, including the former Kori Kollo gold mine (Newmont) that produced

more than 5 million ounces of gold , and the Cerro Rico of Potosí (where the Company’s San

Bartolomé mine is located) , which has produced more than 2 billion ounces of silver as well as a

significant amount of tin.

Following up on the 2021 Phase I drill program of 12 core holes for a total of 3,581 m etres, in

February 2022, the Company started a second program using two drill rigs. To date it has drilled

5,573 metres in 11 core holes as part of Phase II and assays are pending for four holes. Highlights

from the Phase I (as previously published in the Company’s press release dated November 30,

2021) and Phase II drill programs are listed in Tables 1 and 2, and the hole locations are shown in

Figure 1.

2

“While the Phase I drill program returned several gold intersections, t he Phase II drilling has

confirmed that the San Pablo Project has many of the characteristics of a porphyry gold system,”

explained Dr. Stewart D. Redwood, the Company’s Principal Advisor, Geology. “The system is large,

and anomalous gold occurs in every hole drilled.”

Dr. Redwood added, “ The results show an alteration profile through the upper part of a porphyry

system starting with the root of the lithocap with epithermal veins, followed by the zone of phyllic

alteration, and finally by the zone of potassic alteration in the deeper parts . The best gold grades

occur with polymetallic sulphide veinlets associated with phyllic alteration, and with epithermal veins.

The porphyry intrusions drilled so far are late syn-mineral in age, and we have yet to encounter the

pre-mineral porphyries that are expected to have bet ter grades. The other important control is

structure to give zones with a high percentage of gold-bearing sulphide veins. This was the main ore

control at the Kori Kollo mine, where gold occurred in a zone of sheeted pyrite veinlets.”

Table 1. Polymetallic Mineralization in Hole SP22-03

Hole

Number

Mineralized Interval

From (m) To (m) Width (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%)

SP22-03 137.00 141.50 4.50 6.19 67.07 0.01 0.41 0.47

SP22-03 165.00 178.70 13.70 0.71 2.83 0.01 0.03 0.13

Inc. 167.20 168.60 1.40 3.18 0.82 0.03 0.01 0.02

SP22-03 192.00 194.60 2.60 1.97 331.23 1.78 2.20 4.93

Inc. 193.10 194.60 1.50 2.50 481.00 2.46 3.15 7.37

Table 2: Composited Analytical Results from the San Pablo Project

Hole No. From (m) To (m) Length (m) Au (g/t)

Phase I

SPW21-01 54.00 162.40 108.40 0.29

183.00 195.10 12.10 0.42

209.80 279.65 69.85 0.23

SPW21-03 8.80 106.60 97.80 0.30

SPW21-04 4.50 27.60 23.10 0.47

44.35 136.70 92.75 0.37

196.15 209.85 12.90 0.33

225.90 233.20 7.30 0.96

Inc. 229.00 229.30 0.30 12.15

311.10 328.35 16.05 0.34

SPWE21-03 120.65 137.00 16.35 0.33

145.90 149.70 3.80 0.50

170.55 171.30 0.75 2.45

222.05 225.00 2.95 0.92

282.10 283.15 1.05 0.37

371.00 377.00 6.00 2.04

SP21-01 210.90 264.70 53.80 1.17

Inc. 221.00 223.90 2.90 3.75

Inc. 238.60 241.15 2.55 6.23

Inc. 257.30 258.30 1.00 17.65

3

Notes to Tables 1 and 2

1. All assays performed by ALS Global Inc., a certified independent analytical services provider.

2. A cut-off grade of 0.15 g/t Au was used for the compositing.

3. A maximum of 5 m of dilution (less than cut-off) was used in compositing.

4. Composited lengths are down-hole, and true widths are currently unknown.

5. Intersections >5 g/t*m and >0.3 g/t Au are reported.

6. Holes SPW21-02, 05, 06, 07, SPWE21 -01, 02, SPQ22 -01, SPW22 -10 and 11 did not r eturn any significant

intersections.

7. SP - San Pablo, SPW – Willacollito, SPQ – Quinoa, SPWE - Willacollito East.

8. According to Company protocols, three QAQC samples (blanks, standard s, duplicates) per 25 samples were

inserted into the sample stream (approximately 12% QAQC samples). Analytical results were within acceptable

limits.

9. The Qualified Person reviewed the assay composites herein and verified them against the assays from the

certified analytical services provider.

Geology and Mineralization

Gold mineralization at San Pablo is hosted by diamictites of the Silurian-aged, Cancañiri Formation

on the western limb on a major anticline over a large area of at least 2.5 km elongated northwest by

1.5 km wide , and multiphase porphyry intrusions in stocks and dykes . Early potassic alteration

affects porphyry and sediments and comprises secondary biotite, potassium feldspar and magnetite,

with quartz veinlets, and magmatic -hydrothermal breccias, accompanied by low -grade gold. The

porphyries encountered to date are syn-mineral in relative age. The pre-mineral porphyries have not

been found yet and are an important target. The roots of the lithocap occur in the peaks above about

5,000 m comprising minor veins of pyrite -covellite, or residual vuggy quartz and advanced argillic

alteration. Sericite alteration (phyllic alteration) with gold-rich polymetallic sulphides (As, Bi, Cu, Zn)

partly overprints potassic alteration or fresh rock in structurally controlled zones and veins.

SP21-02 92.15 102.80 10.65 0.39

113.50 125.75 12.25 0.33

229.50 234.50 5.00 1.92

399.85 403.55 3.70 0.53

470.80 473.90 3.10 7.39

Phase II

SPQ22-02 42.17 42.60 0.43 0.58

62.45 63.00 0.55 2.50

SPW22-08 27.65 28.15 0.50 1.31

45.45 46.85 1.40 0.74

SPW22-09 23.55 24.00 0.45 9.93

38.80 39.20 0.40 0.69

SPW22-12 54.60 56.30 1.70 0.91

SP22-03 137.00 141.50 4.50 6.19

Inc. 137.00 137.80 0.80 13.90

Inc. 138.60 140.00 1.40 8.59

165.00 178.70 13.70 0.71

192.00 194.60 2.60 1.97

4

San Pablo Target

The San Pablo target is the zone around the high point of Cerro Alcandevario in the north-western

part of the concession in diamictites with porphyry dykes. This target gave the best intersection in

Phase I of 53.80 m at 1.17 g/t Au from 210.90 m (SP21-01) in a stockwork of sulfide veinlets. Hole

SP21-02 intersected several zones including 1 0.65 m at 0.39 g/t Au from 92.15 m, and 3.10 m at

7.39 g/t Au from 470.80 m.

These holes were followed up in Phase II by holes SP22-03 (lost at 207 m), SP22-03 BIS (re-drilled)

and SP22-04, with assays pending for the latter two. SP22-03 returned 4.50 m at 6.19 g/t Au, 67.07

g/t Ag, 0.41 % Pb and 0.47% Zn from 137.00 m in veinlets of specularite, pyrite, arsenopyrite and

quartz; 13.70 m at 0.71 g/t Au from 165.00 m in veinlets of pyrite-arsenopyrite; and 2.60 m at 1.97

g/t Au, 331 .23 g/t Ag, 1.78% Cu, 2.20% Pb and 4.93% Zn f rom 192.00 m in a pyrite-covellite-

enargite-sphalerite vein. This is the first hole to return significant silver and base metal grades which

are interpreted to be epithermal mineralization in the root of the lithocap. Please see cross section

in Figure 2.

Willacollito Target

The Willacollito target is a ridge at lower elevation east of the San Pablo target in diamictite with

seven Phase I holes (SPW22-01 to 07). They returned several long intersections in sulfide veinlets

including 108.40 m at 0.29 g/t Au from 183.00 m (SPW21 -01), 69.85 m at 0.23 g/t Au from 209.80

m (SPW21-01), 97.80 m at 0.30 g/t Au from 8.80 m (SPW21 -03), and 92.75 m at 0.37 g/t Au from

44.35 m (SPW21-04).

Five holes were drilled in Willacollito in Phase II (SPW22-08 to 12) of which two were lost before

reaching the target depth. They intersected diamictites and altered porphyries with gold in veins

such as 0.45 m at 9.93 g/t Au (SPW22-09) and 0.50 m at 1.31 g/t Au (SPW22 -08), and with

anomalous gold zones below cut-off grade; the low grades are believed to be due to the relatively

late age porphyries post-dating the main gold stage. The pre -mineral porphyries have not been

intersected yet.

Willacollito East Target

The Willacollito East target is east of Willacollito in diamictite with porphyries and breccias. One hole

is under way (SPWE22-04) in Phase II to drill deeper below the Phase I holes (SPWE21-01 to 03).

Two Phase I holes intersected a magmatic-hydrothermal breccia body ~130 m true width (SPWE21-

01 and 03). Hole SPWE21-03 returned 16.35 m at 0.33 g/t Au from 120.65 m, and 6.00 m at 2.04

g/t Au from 371.00 m in breccia.

5

Quinoa Target

Cerro Quinoa is a diamictite ridge in the southeastern part of the concession. Two holes drilled in

Phase II (SPQ22-01, 02) were both lost due to high pressure artesian water. They cut diamictites

with pyrite veinlets with gold grades up to 0.55 m at 2.50 g/t Au (SPQ22-02).

Ongoing Exploration Program

Andean has recently acquired the Jiwaki II property (200 hectares) on the northern continuation of

the San Pablo target. T he Company has field crews carrying out geological mapping and channel

sampling on the newly acquired concession. In addition, Fractal Geophysics company of La Paz has

started a 100 line-kilometre ground magnetic and induced polarisation (IP) geophysical survey. It is

expected that the drilling will resume in October to complete the remaining approximately 1,000 m

of the program.

Analyses and Qualified Person

All samples were prepared by ALS Global at their laboratory in Oruro, Bolivia and the pulps were

analysed at ALS Global at their laboratory in El Callao, Peru. ALS Global is an independent, certified,

commercial analytical service company, per ISO/IEC 17025:2017 and ISO 9001:2015. Gold was

assayed by a 30-gram fire assay with atomic adsorption spectroscopy (“AAS”) finish and multi -

element values were derived from four acid digestion and inductively coupled plasma mass

spectrometry (“ICP -MS”). Blanks, standards and duplicates were routinely inserted for quality

assurance and quality control (“QAQC”) per Company protocol.

The scientific and technical content disclosed in this press release was reviewed and approved by

Donald J. Birak, Senior Consulting Geologist to the Company, a Qualified Person as defined by

Canadian National Instrument 43 -101, Registered Member, Society for Mining, Metallurgy and

Exploration (SME), Fellow, Australasian Institute of Mining and Metallurgy (AusIMM).

About Andean Precious Metals Corp.

Andean Precious Metals is a Canadian headquartered, growth-focused silver producer that owns

and operates the San Bartolomé project located in the department of Potosí, Bolivia. San Bartolomé

has been operating continuously since 2008, producing an average of over five million ounces of

silver equivalents per year. The Company is also exploring its wholly owned San Pablo gold projects

and seeking other accretive opportunities in Bolivia and Latin America. Andean is committed to

fostering safe, sustainable and responsible operations. For more information, please visit

www.andeanpm.com.

Company Contact North America Europe

Trish Moran

VP Investor Relations

[email protected]

T: +1 416 564 4290

Anna Speyer

NATIONAL Capital Markets

[email protected]

T: +1 416-848-1376

Charles Vivian

Tavistock

[email protected]

T: +44 20 7920 3150

6

Neither the TSX Venture Exchange, Inc. nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Statements

This press release contains statements which constitute "forward-looking statements" and "forward-

looking information" within the meaning of applicable securities laws (collectively, "forward-looking

statements"), including statements regarding the plans, intentions, beliefs and current expectations

of Andean with respect to future business activities and operating performance. Forward-looking

statements are often identified by the words "may", "would", "could", "should", "will", "intend", "plan",

"anticipate", "believe", "estimate", "expect" or similar expressions. Forward-looking statements in

this news release include without limitation, statements regarding the anticipated temporary hold of

the Phase II diamond drill program and resumption thereof, and the anticipated laboratory

turnaround time for assay results.

Investors are cautioned that forward-looking statements are not based on historical facts but instead

reflect Andean's expectations, estimates or projections concerning future results or events based on

the opinions, assumptions and estimates of management considered reasonable at the date the

statements are made. Although Andean believes that the expectations reflected in such forward-

looking statements are reasonable, such statements involve risks and uncertainties, and undue

reliance should not be placed thereon, as unknown or unpredictable factors could have material

adverse effects on future results, performance or achievements of Andean. Among the key factors

that could cause actual results to differ materially from those projected in the forward-looking

statements are the following: changes in general economic, business and political conditions,

including changes in the financial markets; changes in applicable laws and regulations both locally

and in foreign jurisdictions; compliance with extensive government regulation; the risks and

uncertainties associated with foreign markets. These forward-looking statements may be affected

by risks and uncertainties in the business of Andean and general market conditions, including

COVID-19 and the ongoing conflict between Russia and Ukraine and any actions taken by other

countries in response thereto, such as sanctions or export controls.

Should one or more of these risks or uncertainties materialize, or should assumptions underlying

the forward-looking statements prove incorrect, actual results may vary materially from those

described herein as intended, planned, anticipated, believed, estimated or expected. Although

Andean has attempted to identify important risks, uncertainties and factors which could cause actual

results to differ materially, there may be others that cause results not to be as anticipated, estimated

or intended and such changes could be material. Andean does not intend, and does not assume

any obligation, to update the forward-looking statements except as otherwise required by applicable

law.

7

Figures

Figure 1: Geological map of the San Pablo project showing drill hole locations

Figure 2: Cross section of drill hole SP22-03 BIS at San Pablo target