ANDEAN PRECIOUS METALS EXTENDS LIFE OF SAN BARTOLOMÉ OPERATION TO 4.6 YEARS BASED ON NEW 2P MINERAL RESERVE ESTIMATE M+I mineral resources of 6.1 Mt grading 98 g/t silver, containing 19.0 million silver ounces, including

Drill Results Resource Estimates

1

ANDEAN PRECIOUS METALS EXTENDS LIFE OF

SAN BARTOLOMÉ OPERATION TO 4.6 YEARS

BASED ON NEW 2P MINERAL RESERVE ESTIMATE

M+I mineral resources of 6.1 Mt grading 98 g/t silver, containing 19.0 million silver ounces, including

2P mineral reserves of 5.1 Mt at 93 g/t silver, with 11.95 million recoverable silver ounces

(All amounts are in U.S. dollars unless otherwise stated)

TORONTO, ON – December 27, 2023 – Andean Precious Metals Corp. (“Andean” or the

“Company”) (TSX -V: APM) (OTCQX: ANPMF) is pleased to announce an updated mineral

reserve and resource estimate for the Company's San Bartolomé mine and mill operations , the

largest commercial oxide processing facility in Bolivia.

The 2023 mineral resource and reserve estimates herein (“2023 MR&RE”) were prepared by SRK

Consulting (U.S.) Inc. ("SRK") and will be supported by a technical report prepared in compliance

with National Instrument 43-101 – Standards for Disclosure for Mineral Projects (“NI 43-101”) that

is expected to be filed by Andean within 45 days of this press release.

“The results reported today reflect the work undertaken to extend the life of our San Bartolomé

processing facility and create value for our stakeholders. Our new mineral reserve and resource

estimate excludes our low-grade and high cost “pallacos” for the areas of Antuco, Huacajchi and

Santa Rita, and includes material from our fines d eposit facility1, as well as other higher grade

third-party contracted ore,” stated Alberto Morales, Executive Chairman and C hief Executive

Officer of Andean.

While Andean has been processing ore from both its internal pallacos and third-party contracted

material, the percentage of the contracted material has steadily increas ed. As of the end of the

third quarter, on a year -to-date basis, third-party material represented more than 60% of tonnes

processed and nearly 70% of ounces produced. During the first nine months of 2023, only 30% of

ounces produced came from the Company’s low-grade and high cost pallacos.

“To feed our mill during this next phase of operations, w e will completely transition away from

pallacos and focus on processing higher margin third-party sourced ore and on our FDF material,”

added Mr. Morales. “During the course of 2023, we have successfully negotiated agreements for

a significant amount of tonnage of higher -grade material to feed San Bartolom é, and we will

continue to negotiate with COMIBOL and look for other third-party sources during the course of

2024.”

1 The estimate includes the resources in our Fines Deposit Facility (“FDF”) which contains untreated fine-

grained plant feed from the oxide reserves previously mined as well as third party contracted high-grade

oxide material.

2

2023 MR&RE Highlights

• 2023 MR&RE for San Bartolomé reports:

̶ a contained M&I silver (“Ag”) resource of 19.0 Moz at 98 grams per tonne (“g/t”) Ag;

and

̶ a recoverable 2P reserve of 11.95 Moz with an average grade of 93 g/t Ag.

• New sources of mill feed acquired – including high-grade silver oxides from Paca, Alta

Vista and three deposits in the Tollojchi area – will augment FDF production.

• Life of operations from 2P mineral reserves stands at 4.6 years.

• Given the reprocessing of FDF tailings and an expanded portfolio of feed sources,

operations at San Bartolomé are expected to extend into 2028, more than 8 years beyond

the original 12-year life of mine, which was expected to end in 20202.

• Potential opportunities remain to further expand the life of operations by upgrading portions

of the high-grade inferred, which stands at 965 kt grading 167 g/t Ag.

• The Company has an active program to identify and acquire new oxidized materials that

would otherwise not be suitable for processing with typical flotation plants in the country.

Mineral Resource Estimate Methodology – FDF

The estimates of mineral res ources are effective as of December 1, 2023, and are presented in

the Appendix - Table 1.

San Bartolomé mine processed the pallacos oxidized deposits formed from erosion of the world-

class Cerro Rico hydrothermal deposit (high sulphidation -type) since its commissioning in 2008 .

The San Bartolomé processing plant screened out fine-grained material of less than 2.5 mm in

size ( -8 mesh), effectively upgrading the silver content of material . This untreated material

contained silver and was stockpiled in the FDF at San Bartolomé.

The tails material was sampled for silver content before being stockpiled and based on that

historical sampling data, the Company previously estimated the silver grade to be between 35 and

40 g/t.

The FDF has been drilled extensively utilizing Sonic core drilling methods from a barge-mounted

platform. Personnel from Empresa Minera Manquiri SA (“ Manquiri”), the wholly owned, Bolivian

subsidiary of Andean, logged and sampled the drill core and submitted the samples to ALS

2 *Coeur d’Alene Mine, San Bartolomé Technical Report, January 1, 2009, p.111. The San Bartolomé operation

started up in 2008 with an estimated end of mine of 2020.

3

Global’s (“ALS”) sample preparation and analytical facilities in Oruro, Bolivia and Lima, Peru,

respectively. ALS is a certified commercial analytical services company.

SRK completed an analysis of the raw exploration data, analysis of outliers and defined capping

levels where necessary and composited the samples to a 2 meter (m), consistent vertical length.

Variogram analysis was completed to define the block size, search strategy used in the estimation.

Silver grade estimates were made from the composited data into the block model, with a

dimension of 20 m x 20 m x 5 m using ordinary kriging, inverse distance, and nearest neighbor

methods, as appropriate. A bulk density of 1.52 g/cm3 was assigned to the block material. FDF

mineral resources were categorized by SRK in a manner consistent with CIM Guidelines and

considered spacing of drilling, numbers of composites, and geostatistical indicators of estimation

quality as well as other factors.

Mineral Resource Estimate Methodology – Contracted Material

Since 2015, Manquiri supplemented its pallacos plant feed with material purchased from

Corporación Minera de Bolivia (“COMIBOL”), the Bolivian state mining company, and from other

non-governmental sources.

Manquiri has performed drilling and rock sampling in the areas that are sources of contracted

material.

Manquiri and SRK completed the geological model and the resource estimation for the oxidized

material in the three areas of Tollojchi (Platera, Manto and Rosario), Alta Vista and Paca , and

included the partially oxidized (transition) material in Paca. SRK completed an analysis of the raw

exploration data for each project , including the analysis of outliers in each zone of the projects,

defining capping levels where necessary and composited the samples to a 2.5 m in Paca and no

compositing was applied to samples in Tollojchi and Alta Vista. Variogram analysis was completed

to define the block size, search strategy used in the estimation. Silver grade estimates were made

from the composited data into the block model for each domain where necessary. P arent block

dimensions used are: 20 m x 20 m x 10 m in Paca, 10 m x 10 m x 10 m in Manto, 5 m x 5 m x 5 m

x 5 m in Rosario and Platera, and 10 m x 10 m x 10 m in Alta Vista. The estimation methods

included ordinary kriging, inverse distance, and nearest neighbor methods, as appropriate. The

bulk density was assigned according to the geological domains in each area.

Mineral Reserves Estimate Methodology – All Material and Mining Methods

The estimates of mineral reserves are effective as of December 1, 2023, and are presented in the

Appendix - Table 2. The prefeasibility study (“PFS”) models an open pit mine with a proven and

probable mineral reserve containing 15.19 Moz of contained silver. Measured and indicated

resources were used for conversion to proven and probable reserves within the optimized PFS pit

designs. The mineral reserve (in -pit) cut-off grades used were 70 g/t Ag for Antuco, Santa Rita,

Huacajchi, Manto, Platera, Rosario; 50 g/t Ag for FDF material; 180 g/t Ag for Paca; and 250 g/t

Ag for Alta Vista. The mineral reserves were calculated using a silver price of $23/oz.

4

The reserves have 12.2 Mt of waste, and the life of mine stripping ratio is 1.26 (waste to in situ RoM

ore).

The following process and modifying factors were followed to calculate the mineral reserves:

• Selection of metal selling prices based on historical and projected prices.

• Review of all modifying factors including metal prices, costs, dilution, mining recovery,

processing recovery, sustaining capital, royalties, and mining methods.

• Convert geological block models to mine models (addition of dilution to mine models).

• Dilution studies.

• Pit optimization using all modifying factors.

• Selection of economical pit using Rev Factor 1.

• Pit design following geotechnical recommendations.

• Monthly mine schedules for the life of the project.

• Cost model verification based on new mine schedule and inventory.

• Generation of post-tax cash flow.

Mining activities at the Manquiri operations will include removal of any growth medium (topsoil),

free-digging, drilling, blasting, loading, hauling and mining support activities. Material within the

pits will be generally blasted on a 2.5 m high bench. Saprolite material can be loaded directly with

hydraulic excavators without the need for blasting. Lower-grade economic material will be placed

in stockpiles, near to the primary crusher location. Higher -grade economic material will be sent

directly to the primary crusher.

A conventional truck -shovel method was considered for the open pit portion of all the deposits

except the FDF (tailings recovery) and Alta Vista (underground) deposit. The open pit analysis

results in several distinct open pits coalescing into over 14 pits. Most pits are shallow due to the

nature of mining only the oxide portion of the resources.

For the underground portion of the PFS analysis the block model created in Datamine using 5 m

x 5 m x 5 m parent cell and variable sub -celling was evaluated. The planned mining inventory

provided the contents of the underground design including estimated mining dilution and mining

recovery. The dilution and mining recovery was built in during the reblock (subblock) exercise

applied to the original model. The planned mining from Alta Vista underground consists of

evaluated tonnes and grade within Mineable Stope Optimizer ( MSO) software shapes that met

the cut-off grade. The planned mining from underground is near the surface and multiple access

will be minimal.

The FDF tailings will be reprocessed using submersible pumps on a barge and slurried for

classification and thickening with the undersize d material going directly into the dry stack facility

(“DSF”) with the coarse material pumped into the ball mill . The barge loops systematically over

cells at depth of 2.5 m to hydraulically mine horizontal layers considering the original topography

5

of the FDF . The grades of the blocks were modelled from barge -supported sonic drilling. Low

grade material is also passed into the DSF. The block model was created in Datamine and

reblocked using 20 m x 20 m x 5 m with a dilution of approximately 5%.

A monthly production schedule and cash flow were prepared to verify the economic feasibility of

the estimated mineral reserves. Production is based on a maximum mine movement of roughly

38,000 tonnes per day, ore and waste, and the processing rate of about 4,500 tonnes per day.

Cost estimates were prepared based on site-specific recent historic data and covered the mining,

processing, and G&A operating costs. Cost estimates related to the sustaining capital of the

operation include the installation of a hydraulic mining operation for the reclaim of the FDF and a

pre-concentration circuit, maintenance capital to sustain the fixed assets and an estimate of

closure costs.

Revenue projections by the cash flow are based on reviewed contracts in place for the sale of

doré bars containing silver and the related costs include shipping, assaying, and refining

associated with a refining recovery. Private and governmental royalties were included in the cash

flow, the former being 4% and the latter 6% of sales revenue net of all selling costs.

Qualified Persons

The scientific and technical content disclosed in this press release was reviewed and approved

by:

Giovanny Ortiz, BSc, FAusIMM, SEG, Principal Resource Geologist of SRK Consulting (U.S.) Inc.

Mr. Ortiz has sufficient experience which is relevant to the type of material under consideration

including mineral resources and to the activities being undertaken to qualify as a Qualified Person

as defined by NI 43-101. The most recent site visit occurred in May 2022 and included: review

and verification of the exploration procedures, sampling, analytical analysis, and the geological

interpretations of all the deposit areas.

Fernando Rodrigues, BS Mining, MBA, MAusIMM, MMSAQP, Practice Leader/Principal

Consultant (Mining) of SRK Consulting (U.S.) Inc. Mr. Rodrigues has sufficient experience which

is relevant to the type of material under consideration including Mineral Reserve s and to the

activities being undertaken to qualify as a Qualified Person as defined by NI 43-101. Mr. Rodrigues

visited the site in July 2023 and reviewed active pallacos mining areas, the FDF tailings area, and

the contracted material stockpiles.

Donald J. Birak, Independent Consulting Geologist to the Company, a Qualified Person as defined

by NI 43-101, Registered Member, Society for Mining, Metallurgy and Exploration (SME) and

Fellow, Australasian Institute of Mining and Metallurgy (AusIMM). During his periodic site visits,

he inspected the geology and mineralization of all the deposit areas referenced herein. Mr. Birak

also verified Sonic sample quality and assay data and QAQC used to prepare the FDF mineral

resource estimates.

6

About Andean Precious Metals

Andean is a growth-focused precious metals producer that owns and operates the San Bartolomé

project located in the department of Potosí, Bolivia. San Bartolomé has been operating

continuously since 2008, producing an average of 5 million oz of silver equivalent per year. The

Company is seeking accretive growth opportunities in Bolivia and the Americas. Andean is

committed to fostering safe, sustainable and responsible operations.

For more information, please contact:

Trish Moran

VP Investor Relations

[email protected]

T: +1 416 564 4290

Neither the TSX Venture Exchange, Inc. nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Statements

Certain statements and information in this release constitute “forward-looking statements” within

the meaning of applicable U.S. securities laws and “forward-looking information ” within the

meaning of applicable Canadian securities laws, which we refer to collectively as “forward-looking

statements”. Forward -looking statements are statements and information regarding possible

events, conditions or results of operations that are based upon assumptions about future

economic conditions and courses of action. All statements and information other than statements

of historical fact may be forward-looking statements. In some cases, forward-looking statements

can be identified by the use of words such as “seek”, “expect”, “anticipate”, “budget”, “plan”,

“estimate”, “continue”, “forecast”, “intend”, “believe”, “predict”, “potential”, “target”, “may”, “could”,

“would”, “might”, “will” and similar words or phrases (including negative variations) suggesting

future outcomes or statements regarding an outlook.

Forward-looking statements in this release include, but are not limited to, statements and

information regarding timing to file the technical report supporting the 2023 MR&RE, the expected

sources of the Company’s mill feed in the upcoming year, the ability of the Company to extend

San Bartolomé life of mine , and the Company’s plans for growth through exploration activities,

acquisitions or otherwise. Such forward -looking statements are based on a number of material

factors and assumptions, including, but not limited to: the Company’s ability to carry on exploration

and development activities; the Company’s ability to secure and to meet obligations under property

and option agreements and other material agreements; the timely receipt of required approvals

and permits; that there is no material adverse change affecting the Company or its properties; that

contracted parties provide goods or services in a timely manner; that no unusual geological or

technical problems occur; that plant and equipment function as anticipated and that there is no

material adverse change in the price of silver, costs associated with product ion or recovery.

Forward-looking statements involve known and unknown risks, uncertainties and other factors

7

which may cause actual results, performance or achievements, or industry results, to differ

materially from those anticipated in such forward-looking statements. The Company believes the

expectations reflected in such forward-looking statements are reasonable, but no assurance can

be given that these expectations will prove to be correct, and you are cautioned not to place undue

reliance on forward-looking statements contained herein.

Some of the risks and other factors which could cause actual results to differ materially from those

expressed in the forward-looking statements contained in this release include, but are not limited

to: risks and uncertainties relating to the interpretation of drill results, the geology, grade and

continuity of mineral deposits and conclusions of economic evaluations; results of initial feasibility,

pre-feasibility and fe asibility studies, and the possibility that future exploration, development or

mining results will not be consistent with the Company ’s expectations; risks relating to possible

variations in reserves, resources, grade, planned mining dilution and ore loss, or recovery rates

and changes in project parameters as plans continue to be refined; mining and development risks,

including risks re lated to accidents, equipment breakdowns, labour disputes (including work

stoppages and strikes) or other unanticipated difficulties with or interruptions in exploration and

development; the potential for delays in exploration or development activities or the completion of

feasibility studies; risks related to the inherent uncertainty of production and cost estimates and

the potential for unexpected costs and expenses; risks related to commodity price and fore ign

exchange rate fluctuations; the uncertainty of profitability based upon the cyclical nature of the

industry in which the Company operates; risks related to failure to obtain adequate financing on a

timely basis and on acceptable terms or delays in obta ining governmental or local community

approvals or in the completion of development or construction activities; risks related to

environmental regulation and liability; political and regulatory risks associated with mining and

exploration; risks related to the uncertain global economic environment; and other factors

contained in the section entitled “Risk Factors” in the MD&A and the Company ’s Management

Discussion and Analysis dated November 29, 2023.

Although the Company has attempted to identify important factors that could cause actual results

or events to differ materially from those described in the forward -looking statements, you are

cautioned that this list is not exhaustive and there may be other factors that the Company has not

identified. Furthermore, the Company undertakes no obligation to update or revise any forward -

looking statements included in this release if these beliefs, estimates and opinions or other

circumstances should change, except as otherwise required by applicable law.

8

APPENDIX

Table 1: Updated Mineral Resources - San Bartolomé Operation as of December 1, 2023

Material

Source Area Category Tonnes(1)

(000s)

Ave. Silver

Grade

(g/t)

Contained

Silver

(Moz)

San Bartolomé Tailings FDF (2)

Measured - - -

Indicated 3,813 56 6.90

M+I 3,813 56 6.90

Inferred 92 52 0.15

Tollojchi Area - Contracted

Manto (3)

Measured - - -

Indicated 773 127 3.15

M+I 773 127 3.15

Inferred 35 131 0.15

Platera (3)

Measured - - -

Indicated 636 160 3.28

M+I 636 160 3.28

Inferred 445 145 2.07

Rosario (3)

Measured - - -

Indicated 183 148 0.87

M+I 183 148 0.87

Inferred 115 136 0.50

Other Areas - Contracted

Alta Vista (4)

Measured - - -

Indicated 34 354 0.39

M+I 34 354 0.39

Inferred 55 371 0.66

Paca (5)

Measured - - -

Indicated 666 223 4.78

M+I 666 223 4.78

Inferred 223 230 1.65

Owner +

Contracted Totals

Measured 0 0 0

Indicated 6,105 98 19

M+I 6,105 98 19

Inferred 965 167 5

Notes to Table 1

1. Mineral resources are effective as of December 1, 2023, and inclusive of mineral reserves. Mineral

resources that are not mineral reserves have not demonstrated economic viability. There is no

certainty that all or any part of those mineral resources will be converted into mineral reserves

estimate. Mineral resource tonnage and contained metal have been rounded to reflect the accuracy

of the estimate, any apparent errors are insignificant. Silver assays were capped where appropriate.

Given the historical production and knowledge of the projects, it is the Company's opinion that all the

silver grades included in the calculations have a reasonable potential to be recovered and sold.

2. The following assumptions are considered for the FDF mineral resources:

a) Assumed silver price of $25/oz and metallurgical recovery of 78%.

b) Mineral resources are reported at an in-situ cut-off of 47 g/t Ag, grade of material above mesh

#14. This cut -off considers, on a per tonne basis: mining cost: $1.42/t; processing costs:

$17.89/t; general & administrative and indirect costs: $6.1/t; capital: $0.63/t; refining, shipping,