Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

APGO.V ·

Calico Silver Project 2022 Drill Program Update:

Exploration Programs

- 1 -

Calico Silver Project 2022 Drill Program Update:

Drill Rig Mobilization to Commence March 29, 2022.

Vancouver, British Columbia , March 24, 2022 – Apollo Silver Corp. (“Apollo” or the “ Company”)

(TSX.V:APGO, OTCQB:APGOF, Frankfurt:6ZF0) is pleased to provide an update on the upcoming 2022

Drill Program at its Calico Silver Project (“ Calico” or the “Project”) located in San Bernardino County,

California. The 2022 Drill Program is one component of the multi-component 2022 Calico Technical

Program that aims to upgrade and expand the recently announced Inferred Mineral Resource Estimate

(“MRE”) of 166 million ounces (“Moz”) of silver contained in 58.1 million tonnes (“Mt”) at an

average grade of 89 grams per tonne (“g/t”) (see news release dated February 9, 2022). Preparations

for the drill program are well-advanced and the reverse circulation (“RC”) drill rig will be mobilized to the

Project from Monte Vista, Colorado by Cooper Drilling LLC (“Cooper Drilling”) commencing on March

29, 2022. Drilling is planned to commence April 4, 2022.

The RC drill rig arrived at Cooper Drilling in Colorado, on February 9, 2022. Major modifications were

made to the rod handling and sampling systems and a thorough operational and safety inspection of the

rig has been performed. A test hole was completed to a depth of 450 feet in overburden, mudstone and

basalt on March 19, 2022. The rig performed well and is now being prepared for shipment to Calico.

“With timing of the mobilization of the drill rig now confirmed, commencement of the first hole is

imminent,” Apollo CEO, Tom Peregoodoff, commented. “ The delay we have encountered was a direct

result of issues related to the US/Canadian border blockade and broader supply chain issues that are

all too familiar to most industries. Ultimately this delay should have no impact on the timing of the planned

resource update and commencement of the Preliminary Economic Assessment in Q4. The 15,000 metre

program we are announcing today is designed primarily to increase both the size and confidence in the

resource at Calico. Testing of the recently identified gold mineralized horizon is also a key aspect of the

program. Our initial drilling will focus on expanding the distribution of the known high- grade silver and

results will be released as they become available.”

2022 Calico Technical Program

The 2022 Calico Technical P rogram is comprised of three components: Drilling, Metallurgical Testing

and Historic Sample Testing, which together aim to upgrade the confidence in, and expand the recently

announced Inferred MRE of 166 Moz of silver contained in 58.1 Mt at an average grade of 89 g/t

(see news release dated February 9, 2022).

Drilling Program

• The proposed drill ing program comprises 15,000 m (49,213 ft) of drilling using RC and

diamond core drilling methods.

o Approximately 10,000 m of RC drilling and 5,000 m of diamond drilling are planned.

• Focus of the drilling program is to upgrade the confidence level of the MRE and to expand

the deposits’ metal inventory through the following activities:

o Acquiring high-quality geotechnical, rock properties, geochemical and lithological

information. Geotechnical, rock properti es and lithological information will be

acquired using both Optical Televiewer surveying and traditional logging methods.

o Expanding the metal inventory by:

 Confirming historic bonanza grade silver intercepts (+1,000 gram/tonne);

 Targeting areas that may increase the continuity of and expand high- grade

silver mineralization identified in the MRE;

 T argeting shallow ounces by drilling untested Barstow Formation along

strike and down dip; and

 Testing the gold- mineralized Barstow -Pickhandle lithologic contact (see

new release dated January 11, 2022).

Updates regarding the Metallurgical Testing and Historic Sample Testing will be provided at a later

date.

ABOUT THE CALICO PROJECT

Location

The Project is located in San Bernardino County, California and comprises the adjacent Waterloo and

Langtry properties which total 2,950 acres. T he Project is 15 kilometers ( 9 miles) from the city of

Barstow and has an extensive private gravel road network spanning the property. There is commercial

electric power within 5 kilometres (3 miles) of the Project.

Geology and Mineralization at Calico

The Project is situated in the southern Calico Mountains of the Mojave Desert, in the south-western

region of the Basin and Range tectonic province. This mountain range is a 15 k ilometre (9 mile) long

northwest-southeast trending range dominantly composed of Tertiary (Miocene) volcanics,

volcaniclastics, sedimentary rocks and dacitic intrusions. Mineralization at Calico comprises high-level

low-sulfidation silver-dominant epithermal vein-type and disseminated-style deposits associated with

northwest-trending faults and fracture zones and mid-Tertiary volcanic activity. The Project represents

a district -scale mineral system endowment with approximately 6,000 metres (19,685 feet) in

mineralized strike length controlled by Apollo. Oxidized, disseminated and stockwork -style

mineralization is primarily hosted in the Barstow sedimentary formation and is the subject of the MRE.

On February 9, 2022, Apollo announced the MRE for the Project (Table 1) below.

Table 1: Calico Project Inferred Mineral Resource Estimate at a 50 g/t Ag Cut-Off Grade. Effective Jan 28, 2022.

Class Deposit

Imperial Units Metric Units Strip

Ratio

(t:t)

Contained Silver

Volume

Million

(yd3)

Tons

Million

(st)

Ag

Grade

(oz/st)

Volume

Million

(m3)

Tonnes

Million

(t)

Ag

Grade

(g/t)

Million

(oz)

Inferred

Waterloo 20.8 42.8 2.98 15.9 38.9 93 2.2 116

Langtry 10.3 21.3 2.59 7.9 19.3 81 6.0 50

Calico

(Total) 31.2 64.1 2.85 23.8 58.1 89 3.4 166

• Base-case resource estimates reported in Table 1. Ounces are reported as troy ounces.

• Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) definitions are followed for classification of the Mineral Resource.

• Prospects for eventual economic extraction determined using surface mining operating costs of US$2.50/st, processing costs of US$29.00/st and silver

price of US$23.00/oz.

• Specific gravity for the mineralized zone is fixed at 2.44 kg/m3 (13.13 ft3/st). Silver grade was capped at 400 g/t only for Waterloo estimation.

• Resources are constrained to within an economic pit shell targeting mineralized blocks with a minimum of 50 ppm (50 g/t) silver.

• Totals may not represent the sum of the parts due to rounding.

• The MRE has been prepared by Derek Loveday, P. Geo. of Stantec Consulting Services Ltd., in conformance with CIM “Estimation of Mineral Resource

and Mineral Reserves Best Practices” guidelines and are reported in accordance with the Canadian Securities A dministrators NI 43-101. Mineral

resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that any mineral resource will be converted

into a mineral reserve.

QUALIFIED PERSONS

The scientific and technical data contained in this news release was reviewed, and approved by Cathy

Fitzgerald, P.Geo., Apollo’s Vice President Exploration and Resource Development, a Qualified

Person as defined by NI 43-101 Standards of Disclosure for Minerals Projects. Ms. Fitzgerald is a

registered Professional Geoscientist in British Columbia, Canada.

Please visit www.apollosilver.com for further information.

ON BEHALF OF THE BOARD OF DIRECTORS

Tom Peregoodoff

Chief Executive Officer

For further information, please contact:

Tom Peregoodoff

Chief Executive Officer

Telephone: +1 (604) 428-6128

[email protected]

About Apollo Silver Corp.

Apollo Silver Corp. has assembled an experienced and technically strong leadership team who have

joined to advance world class precious metals projects in tier -one jurisdictions. The Company is

focused on advancing its portfolio of two significant silver e xploration and resource development

projects, the Calico Silver Project, in San Bernardino California and Silver District Project in Arizona.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding “Forward-Looking” Information

This news release includes “forward -looking statements” and “forward- looking information” within the meaning of

Canadian securities legislation. All statements included in this news release, other than statements of historical fact,

are forward-looking statements including, without limitation, statements with respect to the potential of the Calico

Project; the potential for identification of gold and barite resources at Calico; the potential to expand the resource

estimate and upgrade its confidence level, including prospective mineralization on strike and at depth; timing of

commencement of mobilization, drilling and exploration activities; timing and commencement of the Preliminary

Economic Assessment. Forward-looking statements include predictions, projections and forecasts and are often, but

not always, identified by the use of words such as “anticipate”, “believe”, “plan”, “estimate”, “expect”, “potential”,

“target”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or

be achieved and other similar expressions and includes the negatives thereof.

Forward-looking statements are based on the reasonable assumptions, estimates, analysis and opinions of the

management of the Company made in light of its experience and its perception of trends, current conditions and

expected developments, as well as other factors that management of the Company believes to be relevant and

reasonable in the circumstances at the date that such statements are made. Forward-looking information is based on

reasonable assumptions that have been made by the Company as at the date of such information and is subject to

known and unknown risks, uncertainties and other factors that may have caused actual results, level of activity,

performance or achievements of the Company to be materially different from those expressed or impli ed by such

forward-looking information, including but not limited to: risks associated with mineral exploration and development;

metal and mineral prices; availability of capital; accuracy of the Company’s projections and estimates; realization of

mineral resource estimates, interest and exchange rates; competition; stock price fluctuations; availability of drilling

equipment and access; actual results of current exploration activities; government regulation; political or economic

developments; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in

connection with development activities; personnel relations; contests over title to properties; changes in project

parameters as plans continue to be refined; and impact of the COVID-19 pandemic. The estimate of mineral resources

may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant

issues. The quantity and grade of reported inferred mineral resourc es in this estimation are uncertain in nature and

there has been insufficient exploration to define these inferred mineral resources as an indicated or measured mineral

resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral

resource category. Forward-looking statements are based on assumptions management believes to be reasonable,

including but not limited to the price of silver, gold and barite; the demand for silver, gold and barite; the ability to carry

on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified

personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and

effective matter; and the regulatory framework regarding environmental matters, and such other assumptions and

factors as set out herein. Although the Company has attempted to identify important factors that could cause actual

results to differ materially from those contained in forward-looking information, there may be other factors that cause

results not to be as anticipated, estimated or intended. There can be no assurance that forward -looking statements

will prove to be accurate and actual results, and fu ture events could differ materially from those anticipated in such

statements. Accordingly, readers should not place undue reliance on forward looking information contained herein,

except in accordance with applicable securities laws. The forward-looking information contained herein is presented

for the purpose of assisting investors in understanding the Company’s expected financial and operational performance

and the Company’s plans and objectives and may not be appropriate for other purposes. The Company does not

undertake to update any forward-looking information, except in accordance with applicable securities laws.