Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

APGO.V ·

Apollo Silver to Option Cinco de Mayo Project, Chihuahua, Mexico

Mergers & Acquisitions

Apollo Silver to Option Cinco de Mayo Project, Chihuahua, Mexico

VANCOUVER, British Columbia, Sept. 23, 2024 -- Apollo Silver Corp. (“Apollo Silver ” or the “Company”) (TSX.V:APGO,

OTCQB:APGOF, Frankfurt:6ZF0) has entered into an exploration, earn-in and option agreement (the “ Option Agreement ”),

dated effective September 20, 2024, with MAG Silver Corp. (“ MAG”) (TSX:MAG) and its subsidiary, Minera Pozo Seco, S.A.

de C.V. (“MPS”), pursuant to which Apollo Silver has the option (the “Transaction”) to acquire the Cinco de Mayo Project (the

“Project” or “Cinco de Mayo ”).

“This is an exciting time for Apollo Silver as the addition of Cinco de Mayo marks the beginning of our transformation as a

Company. We have successfully mitigated single asset risk by now boasting a portfolio of two exciting projects in two pro-

mining jurisdictions,” commented Chairman and Interim CEO, Andrew Bowering. “Much of our group has considerable

experience in Mexico and we are excited to begin the work to unlock value at Cinco de Mayo for all our stakeholders.”

Cinco de Mayo comprises 29 concessions totaling approximately 25,000 hectares and is located in the north central part of

Chihuahua State, Mexico approximately 190 kilometres (“ km”) northwest of the state capital of Chihuahua City in the

Municipio de Buenaventura. The Project area is located immediately west of the village of Benito Juárez and for the purposes

of exploration, benefits from excellent access via local dirt roads.

Figure 1: Regional Map showing the location of the Cinco de Mayo Project and other significant deposits

The Project is prospective for and hosts carbonate replacement type deposits (CRD) including the Upper Manto Pb-Zn-Ag (Au)

deposit, which consists of two parallel and overlapping manto deposits referred to as the Jose Manto and the Bridge Zone. The

Project also hosts the Pozo Seco Molybdenum-Gold (Mo-Au) deposit. The two deposits host distinctly different mineralization

with different commodities and are separated by four (4) km.

As of September 1, 2012, 445 holes totaling 213,591 metres (“ m”) had been drilled on the Project by the previous operators,

with no work completed since. Of these, 151 holes totaling 97,610 m are located at or nearby the Upper Manto deposit and

were used to model the mineralization. Roscoe Postle Associates Inc. (“ RPA”) prepared a technical report on the Project,

dated November 14, 2012, which includes a now historical inferred mineral resource. At an NSR cut-off of US$100 per tonne

the historical inferred resource was estimated at 12.45 million tonnes of 132 g/t silver (Ag), 2.86% lead (Pb), and 6.47%

zinc (Zn), 0.24 g/t gold (Au) (see Table 1). The total contained metals in the historical resource are 52.7 million ounces of

silver, 785 million pounds of lead, 1,777 million pounds of zinc, and 96,000 ounces of gold.

Figure 2: Oblique View Section highlighting the high priority Pegaso Target and historical resource estimate on

the Project

A potential new discovery, called the Pegaso Zone, was drilled in 2012. Consisting of 61.6 m of massive sulphide in a deeper

hole (CM-12-431), it was not included in the 2012 historical resource estimate (Figure 2). This intercept is considered a high

priority target and has potential to be a significant new discovery. The Company’s initial review of historical data suggests that

the Pegaso Zone could indicate a larger and higher-grade resource at depth.

As previously indicated, the Project also hosts the Pozo Seco Mo-Au deposit, for which RPA prepared a historical mineral

resource estimate in 2010. At a cut-off grade of 0.022% Mo, the historical indicated mineral resources were estimated at 29.1

million tonnes grading 0.147% Mo and 0.25 g/t Au, containing 94.0 million pounds Mo and 230,000 ounces Au, and a

historical inferred mineral resource estimated at 23.4 million tonnes grading 0.103% Mo and 0.17 g/t Au, containing 53.2

million pounds Mo and 129,000 ounces Au (see Table 1).

Table 1: Historical Resource Estimates for the Cinco de Mayo Project

Upper Manto Deposit, September 1, 2012, Mag Silver Corporation (1)

  Tonnage

(Mt)

Gold

(g/t)

Silver

(g/t)

Zinc

(%)

Lead

(%)

AgEq

(g/t)

Gold

(oz)

Silver

(Moz)

Zinc

(Mlb)

Lead

(Mlb)

Inferred 12.45 0.24 132 6.47 2.86 385 96,000 52.7 1,777 785

Pozo Seco Deposit, July 12, 2010, Mag Silver Corporation (2)

  Tonnage

(Mt)

Gold

(g/t)

Molybdenum

(%)

Gold

(oz)

Molybdenum

(Mlb)

Indicated 29.1 0.25 0.147 230,000 94.0

Inferred 23.4 0.17 0.103 129,000 53.2

1 The Upper Manto historical mineral resource was estimated by RPA with an effective date of September 1, 2012. Mineral

resources are estimated at an NSR cut-off value of US$100 per tonne. NSR values were calculated in US$ using factors of

$0.60 per g/t Ag, $12.32 per g/t Au, $18.63 per % Pb and $14.83 per % Zn. These factors are based on metal prices of

US$27.00/oz Ag, US$1,500/oz Au, $1.15/lb Pb, and $1.20/lb Zn and estimated recoveries and smelter terms.

2 The Pozo Seco historical mineral resource was estimated by RPA with an effective date of July 12, 2010. The cut-off grade of

0.022% Mo was estimated using a Mo price of US$17/lb and assumed operating costs and recoveries.

The historical mineral resources for the Upper Manto and Pozo Seco deposits, discussed in this news release were calculated

prior to the implementation of current CIM standards for mineral resource estimation (as defined by the CIM Definition Standard

on Mineral Resources and Ore Reserves dated May 10, 2014). The reader is cautioned not to treat them, or any part of them,

as current mineral resources or reserves. The historical resources have been included simply to demonstrate the mineral

potential of the Project. As part of the initial phase of work on the Project, the Company intends to do a thorough review of all

historical data performed by a qualified person, along with additional exploration work to confirm results, in order to produce a

current mineral resource estimate for the deposits. The Company is not aware of any more recent estimates prepared for the

Project.

The Project has not seen any modern work since 2012 when the previous operators, MAG, lost access to the property due to

a number of reasons involving community relations with local stakeholders and social licensing requirements. Access to the

Project is currently restricted by the ejido assembly in the region. Following completion of the Transaction, the Company

intends to actively work with the assembly and the local community to regain access and obtain the necessary licensing to

continue exploration activities on the Project.

Transaction Terms

Pursuant to the terms of the Transaction, the Company has been granted an option (the “ Option”) to acquire all of the

outstanding share capital of 0890887 B.C. Ltd. (“ NumberCo”), a wholly-owned subsidiary of MAG, which itself is the indirect

controlling shareholder of MPS. MPS is the sole registered and beneficial owner of the mineral concessions comprising the

Project. In order to exercise the Option, the Company is required to obtain the necessary licensing to access and conduct

mining activities on the Project, and subsequently complete no less than 20,000 m of exploratory drilling, all within a five-year

period (the “Option Term ”). Upon exercise of the Option, and subject to the final approval of the TSX Venture Exchange, the

Company will issue to MAG common shares (the “ Consideration Shares ”) equivalent to 19.9% of the then issued and

outstanding common shares of the Company, on a non-diluted basis.

During the Option Term, the Company will control all exploration and development activities on the Project and will be

responsible for all expenses associated with maintaining the Project in good standing. Following exercise of the Option, MAG

will be granted certain rights allowing it to participate in subsequent equity interests to maintain its percentage ownership

interest in the Company. The Consideration Shares will be subject to a four-month statutory hold period in accordance with

applicable securities laws.

The Company is at arms-length from MAG and MPS, and no finders’ fees or commissions are payable in connection with the

entering into of the Option Agreement. In the event the option is exercised, and the Project is acquired by the Company, a

finders’ fee equivalent to 3.5% of the value of the Consideration Shares is due and owing to an arms-length third-party who

assisted in facilitating the Transaction. The finders’ fee is payable in cash or common shares of the Company, or any

combination, at the discretion of the Company, and subject to the approval of the TSX Venture Exchange. In the event any

portion of the finders’ fee is payable in common shares of the Company, the shares will be issuable at an equivalent deemed

price to the Consideration Shares.

Qualified Person

The scientific and technical data contained in this news release was reviewed and approved by Isabelle Lépine, M.Sc., P.Geo.,

Apollo Silver’s Director, Mineral Resources. Ms. Lépine is a registered professional geologist in British Columbia and a

Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Minerals Projects and is not an

independent of the Company.

About Apollo Silver

Apollo Silver has assembled an experienced and technically strong leadership team who have joined to advance world class

precious metals projects in tier-one jurisdictions. The Company is focused on advancing its portfolio of two significant silver

exploration and resource development projects, the Calico Project, in San Bernardino County, California and the Cinco de

Mayo Project, in Chihuahua State, Mexico.

Please visit www.apollosilver.com for further information.

ON BEHALF OF THE BOARD OF DIRECTORS

Andrew Bowering

Chairman and Interim President & Chief Executive Officer

For further information, please contact:

Andrew Bowering

Chairman and Interim Chief Executive Officer

Telephone: +1 (604) 428-6128

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding “Forward-Looking” Information

This news release includes “forward-looking statements” and “forward-looking information” within the meaning of Canadian

securities legislation. All statements included in this news release, other than statements of historical fact, are forward-looking

statements including, without limitation, statements with respect to the potential Transaction; the potential to obtaining the

necessary licensing to operate and perform exploration activities; the potential to advance community relations and regain

access to the project, the potential to locate and identify a larger and higher grade resource at depth; the potential for new

discoveries; geological interpretations and historical resource estimates for the Project; future silver recoveries; timing,

successful commencement and execution of future planned drilling and exploration activities. Forward-looking statements

include predictions, projections and forecasts and are often, but not always, identified by the use of words such as

“anticipate”, “believe”, “plan”, “estimate”, “expect”, “potential”, “target”, “budget” and “intend” and statements that an event or

result “may”, “will”, “should”, “could” or “might” occur or be achieved and other similar expressions and includes the negatives

thereof.

Forward-looking statements are based on the reasonable assumptions, estimates, analysis, and opinions of the management

of the Company made in light of its experience and its perception of trends, current conditions and expected developments, as

well as other factors that management of the Company believes to be relevant and reasonable in the circumstances at the

date that such statements are made. Forward-looking information is based on reasonable assumptions that have been made

by the Company as at the date of such information and is subject to known and unknown risks, uncertainties and other

factors that may have caused actual results, level of activity, performance or achievements of the Company to be materially

different from those expressed or implied by such forward-looking information, including but not limited to: risks associated

with mineral exploration and development; metal and mineral prices; availability of capital; accuracy of the Company’s

projections and estimates; realization of mineral resource estimates, interest and exchange rates; competition; stock price

fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government

regulation; political or economic developments; environmental risks; insurance risks; capital expenditures; operating or

technical difficulties in connection with development activities; personnel relations; and changes in Project parameters as

plans continue to be refined. Forward-looking statements are based on assumptions management believes to be reasonable,

including but not limited to the price of silver, gold and barite; the demand for silver, gold and barite; the ability to carry on

exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel,

equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner;

and the regulatory framework regarding environmental matters, and such other assumptions and factors as set out herein.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from

those contained in forward-looking information, there may be other factors that cause results not to be as anticipated,

estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate and actual

results, and future events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking information contained herein, except in accordance with applicable securities laws.

The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the

Company’s expected financial and operational performance and the Company’s plans and objectives and may not be

appropriate for other purposes. The Company does not undertake to update any forward-looking information, except in

accordance with applicable securities laws.

Photos accompanying this announcement are available at: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/8187f49a-2284-4368-ba71-d07e98519ee2

https://www.globenewswire.com/NewsRoom/AttachmentNg/d0655a9e-25b0-40db-bc4b-e8c31ab00742