Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

APGO.V ·

Apollo Reports First Assay Results From Phase 2 Drilling Silver Mineralization Continues to Expand Beneath Current Resource Boundary

Drill Results

Apollo Reports First Assay Results From Phase 2 Drilling

Silver Mineralization Continues to Expand Beneath Current Resource Boundary

Vancouver, British Columbia, December 1, 2022 – Apollo Silver Corp. (“Apollo” or the “ Company”)

(TSX.V:APGO, OTCQB:APGOF, Frankfurt:6ZF0) is pleased to report initial assay results from the recently

completed Phase 2 of the 2022 Drill Program at the Calico Silver Project (“Calico” or the “Project”) located

in San Bernardino County, California.

• Drilling continues to expand silver (“Ag’) mineralization at depth up to approximately 100

metres (“m”) below the base of the current mineral resource estimate (“MRE”) in the northern

portion of the Waterloo deposit.

• Resource infill drilling results continue to confirm the continuous and predictable nature of

near-surface silver mineralization, providing a solid foundation for the updated MRE in early

2023.

• Gold (“Au”) horizon continues to be intercepted with 39.0 m of 0.790 g/t Au intercepted in

drill hole W22-RC-044 (15.0 m estimated true width).

• New significant intercepts include:

SILVER

o 133 g/t Ag over 129.0 m from 7.0 m depth down hole (W22-RC-043), including;

• 288 g/t Ag over 6.0 m from 67.0 m depth down hole;

• 287 g/t Ag over 3.0 m from 91.0 m depth down hole; and

• 280 g/t Ag over 6.0 m from 103.0 m depth down hole;

o 93 g/t Ag over 52.5 m from 38.5 m depth down hole (W22-RC-044), including;

• 257 g/t Ag over 1.5 m from 62.5 m depth down hole;

o 72 g/t Ag over 143.5 m from surface (W22-RC-058);

o 119 g/t Ag over 79.5 m from 1.0 m depth down hole (W22-RC-059), including;

• 284 g/t Ag over 1.5 m from 32.5 m depth down hole;

o 113 g/t Ag over 47.5 m from surface (W22-RC-061), including;

• 302 g/t over 1.5 m from 55.0 m depth down hole.

GOLD

o 0.790 g/t Au over 39.0 m from 109.0 m depth down hole (W22-RC-044), including;

• 1.080 g/t Au over 19.5 m from 112.0 m depth down hole;

• and 2.551 g/t Au over 4.5 m from 115.0 m depth down hole;

• and 1.645 g/t Au over 1.5 m from 125.5 m depth down hole;

• and 1.125 g/t Au over 1.5 m from 130.0 m depth down hole;

• 0.825 g/t Au over 7.5 m from 137.5 m depth down hole;

• and 1.910 g/t Au over 1.5 m from 143.5 m depth down hole.

Silver intercepts are reported at a 50 g/t silver cut -off grade (“COG”) with up to 4.5 m dilution and are uncapped. Gold intercepts are reported at a

0.1 g/t COG with up to 4.5 m dilution and are uncapped. Lengths are down hole lengths and may not represent true widths unless otherwise stated.

____________________________________________________________________________________

Assay results from the Waterloo Property continue to confirm the near-surface silver mineralization within

the current MRE block model is continuous and predictable. Additionally, silver continues to be identified at

depths below the base of the MRE potentially expanding the resource. Phase 2 drilling is part of the 2022

Calico Technical Program, which aims to upgrade and expand the previously announced maiden Inferred

MRE of 166 million ounces of silver contained in 58.1 million tonnes at an average grade of 89 grams

per tonne (“g/t”) (see news release dated February 9, 2022)1.

Results below are reported for six reverse circulation (“RC”) drill holes totaling 828.0 metres (“m”),

completed between September 21, 2022, and October 23, 2022. These are the first assays received from

Phase 2 of the drill program, in which 44 holes (4,822.0 m) were completed between September 19, 2022,

and November 12, 2022.

“These first assay results from our Phase 2 drill program continue where Phase 1 left off” commented Apollo

CEO Tom Peregoodoff. “Our primary focus for Calico in 2022 was two- fold. First, to provide additional

confidence to the current resource to enable us to maximize the amount of silver ounces we can convert to

a higher resource category . Second, to expand the extent of known silver mineralization. I am pleased to

report that on both counts we have been successful. The consistency of silver mineralization bodes very

well for conversion of our current silver resource to a higher resource category. In addition, the continued

intersection of silver mineralization beneath the current MRE highlights the potential to grow the resource

at Calico. These initial results have also confirmed the extensive nature of the gold horizon, and while not

a primary focus, the potential to add gold to the upcoming revised MRE could make a meaningful impact to

the outcome of the planned 2023 Preliminary Economic Assessment.”

ASSAY RESULTS

All six holes reported below intersected silver mineralization above the MRE cut-off grade (“COG”)

of 50 g/t silver. These holes were designed to complete further infill drilling in the southern half of the

Waterloo deposit to confirm silver grade trends identified in the MRE block model and to test possible

extensions of silver mineralization at depth below the base of the MRE in the northern half of the deposit .

Refer to Figure 1, Figure 2 and Figure 3 for drill hole locations and select cross sections showing assay

results relative to the MRE. Specifically, holes W22-RC-058 and W22-RC-059 were designed to follow up

deeper silver identified in hole W22-RC-033 (see news release dated August 23, 2022). Drilling has now

identified silver mineralization up to 100 m (approximate) depth below the base of the MRE a cross

over 65 m up dip (see Figure 3) in the northern portion of the Waterloo deposit . Refer to Figure 1 and

Table 1 for drill hole locations and Table 2 for silver assay results.

Hole W22-RC-044 was selected for gold analysis as it specifically targeted the modeled gold mineralized

horizon occurring at the Barstow sediments -Pickhandle volcanics contact beneath the current MRE (gold

is not included in the current MRE announced February 9, 2022). This hole intercepted 39.0 m of 0.790 g/t

Au from 109.0 m downhole, representing a modeled true thickness of 15.0 m (see Figure 2). Drilling

continues to better define and expand the gold mineralization at Waterloo and the pending MRE

update will seek to add gold to the mineralized resource. Refer to Figure 1 and Table 1 for drill hole

locations and Table 3 for gold assay results.

Table 1: Drill hole information for results reported December 1, 2022, for the Calico Project 2022 Drill Program.

Hole Easting

(m)

Northing

(m)

Elevation

(m)

Total

Depth (m)

Total

Depth (ft) Azimuth Dip

W22-RC-043 510899 3867874 855 154.0 505 140 -60

W22-RC-044 510843 3867934 830 148.0 486 140 -70

W22-RC-058 510475 3868017 775 166.0 545 0 -90

W22-RC-059 510545 3868090 789 199.0 653 230 -76

W22-RC-060 510478 3868109 785 91.0 299 225 -65

W22-RC-061 510540 3868003 805 70.0 230 0 -90

Note: Drill hole assay results are reported as received from the laboratory. Results are not necessarily received in the order holes

were drilled.

Table 2: Silver assay results reported December 1, 2022, for Phase 2 of the Calico Project 2022 Drill Program.

Hole From

(m)

To

(m)

Interval

(m)

Ag

(g/t)

Ag

(opt*)

W22-RC-043

0.0 1.0 1.0 117 3.4

and 7.0 136.0 129.0 133 3.9

including 49.0 50.5 1.5 267 7.8

including 67.0 73.0 6.0 288 8.4

including 91.0 94.0 3.0 287 8.4

including 98.5 100.0 1.5 251 7.3

including 103.0 109.0 6.0 280 8.2

W22-RC-044

1.0 8.5 7.5 50 1.4

and 26.5 28.0 1.5 88 2.6

and 38.5 91.0 52.5 93 2.7

including 62.5 64.0 1.5 257 7.5

and 110.5 113.5 3.0 64 1.9

and 125.5 127.0 1.5 69 2.0

and 137.5 139.0 1.5 73 2.1

W22-RC-058 0.0 143.5 143.5 72 2.1

W22-RC-059

1.0 80.5 79.5 119 3.5

including 32.5 34.0 1.5 284 8.3

including 43.0 44.5 1.5 252 7.4

and 88.0 124.0 36.0 73 2.1

and 191.5 194.5 3.0 321 9.4

including 191.5 193.0 1.5 520 15.2

W22-RC-060

1.0 2.5 1.5 53 1.5

and 13.0 25.0 12.0 71 2.1

W22-RC-061

0.0 47.5 47.5 113 3.3

including 34.0 35.5 1.5 302 8.8

and 55.0 56.5 1.5 54 1.6

Silver intercepts calculated using 50 g/t cut -off grade (“COG”) with significantly higher-grade intercepts

reported at 250 g/t COG with a maximum of 4.5 m internal dilution and are uncapped. Intercepts are down

hole lengths and may not represent true widths. *Troy ounces per US short ton.

Table 3: Gold assay results reported December 1, 2022, for Phase 2 of the Calico Project 2022 Drill Program.

Hole From

(m)

To

(m)

Interval

(m)

Au

(g/t)

W22-RC-043 Not assayed for Au

W22-RC-044

109.0 148.0 39.0 0.790

including 112.0 131.5 19.5 1.080

and including 115.0 119.5 4.5 2.551

and including 125.5 127.0 1.5 1.645

and including 130.0 131.5 1.5 1.125

including 137.5 145.0 7.5 0.825

and including 143.5 145.0 1.5 1.910

W22-RC-058 Not assayed for Au

W22-RC-059 Not assayed for Au

W22-RC-060 Not assayed for Au

W22-RC-061 Not assayed for Au

Gold intercepts calculated using 0.1 g/t cut -off grade (“COG”) with higher-grade intercepts calculated at 0.5

g/t COG. Intercepts are down hole lengths and may not represent true widths.

1The MRE has been prepared by Derek Loveday, P. Geo. of Stantec Consulting Services Ltd., in conformance with Canadian Institute of Mining and

Metallurgy’s “Estimation of Mineral Resource and Mineral Reserves Best Practices” guidelines and are reported in accordance w ith the Canadian

Securities Administrators NI 43- 101. It is effective January 28, 2022. Mineral resources are not mineral reserves and do not have demonstrated

economic viability. There is no certainty that any mineral resource will be converted into a mineral reserve. Mr. Loveday is an independent Qualified

Person for Apollo’s MRE. Please refer to the Company’s news release dated February 9, 2022, for more information.

SAMPLING AND QUALITY ASSURANCE/QUALITY CONTROL

Drilling was undertaken by Cooper Drilling LLC, of Monte Vista, Colorado. RC chip samples were collected

in 1.5 m lifts with 15 lb representative samples sent for analysis. Representative chip samples were also

collected for logging purposes (lithology, alteration, mineralization), detailed photography and analy sis by

portable X-Ray Fluorescence. RC samples are catalogued and securely stored in a warehouse facility in

Barstow, California until they are ready for secure shipment to ALS Global-Geochemistry in Reno, Nevada

(“ALS Reno”) for sample preparation and gol d analysis. ALS Reno may selectively ship samples to other

ALS laboratories for preparation. After preparation, splits of prepared pulps are securely shipped to ALS

Vancouver, British Columbia for multi-element analysis.

Samples were prepared at ALS -Naves and ALS-Chihuahua, both in Mexico (Prep-31 package) with each

sample crushed to better than 70% passing a 2 mm (Tyler 9 mesh, U.S. Std. No.10) screen. A split of up

to 250 g is taken and pulverized to better than 85% passing a 75- micron (Tyler 200 mesh, U .S. Std. No.

200) screen. All samples were analyzed for 48 elements via ICP -MS following a four -acid digestion with

reportable ranges for silver of 0.01 to 100 ppm (method ME-MS61). Over-range samples analyzed for silver

were re-submitted for analysis using a four-acid digestion and ICP-AES finish with a silver range of 1-1,500

ppm (method Ag-OG62). When results were over 400 ppm silver, they were re- submitted for analysis by

fire assay with a gravimetric finish using a 30 g nominal sample weight with repor table silver range of 5-

10,000 ppm (method Ag- GRA21). Over -range samples analyzed for copper, lead and zinc were re-

submitted for analysis using a four-acid digestion and ICP-AES finish with range of 0.001-50% for copper,

0.001-20% for lead, and 0.001-30% for zinc. Gold was analyzed by fire assay with atomic absorption finish

(method Au- AA26) with a reportable range of 0.01- 100 ppm Au. All analyses were completed at ALS

Vancouver except for gold by fire assay, which was completed at ALS Reno.

The Company maintains its own comprehensive quality assurance and quality c ontrol (“QA/QC”) program

to ensure best practices in sample preparation and analysis for samples. The QA/QC program includes the

insertion and analysis of certified reference materials, commercial pulp blanks, preparation blanks, and field

duplicates to the laboratories. Apollo’s QA/QC program includes ongoing auditing of all laboratory results

from the laboratories. The Company’s Qualified Person is of the opinion that the sample preparation,

analytical, and security procedures followed are sufficient and reliable. The Company is not aware of any

drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data

reported herein.

Figure 1: Locations of drill hole collars for results reported December 1, 2022, for Phase 2 of the Calico Project

2022 Drill Program.

Figure 2: Assay results for drill holes W22-RC-043 and W22-RC-044 reported December 1, 2022, for Phase 2 of

the Calico Project 2022 Drill Program.

Figure 3: Assay results for drill holes W22-RC-058 and W22-RC-059 reported December 1, 2022, for Phase 2 of

the Calico Project 2022 Drill Program.

ABOUT THE PROJECT

Location

The Project is located in San Bernardino County, California and comprises the adjacent Waterloo and

Langtry properties which total 2,950 acres. The Project is 15 km (9 miles) from the city of Barstow and has

an extensive private gravel road network spanning the property. There is commercial electric power within

5 km (3 miles) of the Project.

Geology and Mineralization

The Project is situated in the southern Calico Mountains of the Mojave Desert, in the south-western region of

the Basin and Range tectonic province. This mountain range is a 15 km (9 mile) long northwest- southeast

trending range dominantly composed of Tertiary (Miocene) volcanics, volcaniclastics, sedimentary rocks

and dacitic intrusions. Mineralization at the Project comprises high- level low -sulfidation silver -dominant

epithermal vein-type and disseminated-style deposits associated with northwest-trending faults and fracture

zones and mid-Tertiary volcanic activity. The Project represents a district-scale mineral system endowment

with approximately 6,000 m (19,685 ft) in mineralized strike length controlled by Apollo. Oxidized,

disseminated and stockwork-style mineralization is primarily hosted in the Barstow sedimentary formation

and is the subject of the MRE.

QUALIFIED PERSONS

The scientific and technical data contained in this news release was reviewed, and approved by Cathy

Fitzgerald, M.Sc., P.Geo., Apollo’s Vice President Exploration and Resource Development, a Qualified Person

as defined by NI 43-101 Standards of Disclosure for Minerals Projects. Ms. Fitzgerald is a registered

Professional Geoscientist in British Columbia, Canada.

Please visit www.apollosilver.com for further information.

ON BEHALF OF THE BOARD OF DIRECTORS

Tom Peregoodoff

Chief Executive Officer

For further information, please contact:

Tom Peregoodoff

Chief Executive Officer

Telephone: +1 (604) 428-6128

[email protected]

About Apollo Silver Corp.

Apollo Silver Corp. has assembled an experienced and technically strong leadership team who have joined to advance

world class precious metals projects in tier-one jurisdictions. The Company is focused on advancing its portfolio of two

significant silver exploration and resource development projects, the Calico Silver Project, in San Bernardino County,

California and Silver District Project in La Paz County, Arizona.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding “Forward-Looking” Information

This news release includes “forward -looking statements” and “forward -looking information” within the meaning of

Canadian securities legislation. All statements included in this news release, other than statements of historical fact,

are forward- looking statements including, without limitation, statements with respect to the potential of the Calico

Project; the potential for identification of gold and barite resources at Calico; the potential to expand the resource

estimate and upgrade its confidence level, including prospective mineralization on strike and at depth; timing of drilling

and exploration activities ; timing of completion of the updated mineral resource estimate and 2023 preliminary

economic assessment. Forward-looking statements include predictions, projections and forecasts and are often, but

not always, identified by the use of words such as “anticipate”, “believe”, “plan”, “estimate”, “expect”, “potential”, “target”,

“budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be

achieved and other similar expressions and includes the negatives thereof.

Forward-looking statements are based on the reasonable assumptions, estimates, analysis, and opinions of the

management of the Company made in light of its experience and its perception of trends, current conditions and

expected developments, as well as other factors that management of the Company believes to be relevant and

reasonable in the circumstances at the date that such statements are made. Forward-looking information is based on

reasonable assumptions that have been made by the Company as at the date of such information and is subject to

known and unknown risks, uncertainties and other factors that may have caused actual results, level of activity,

performance or achievements of the Company to be materially different from those expressed or implied by such

forward-looking information, including but not limited to: r isks associated with mineral exploration and development;

metal and mineral prices; availability of capital; accuracy of the Company’s projections and estimates; realization of

mineral resource estimates, interest and exchange rates; competition; stock pri ce fluctuations; availability of drilling