Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AORO.V ·

This new per hole LVRC-0 containing th Au. That inte of February 5 mineralizatio the Company Thomas A. D has turned it the property forward to ge portion of the Melvin A. H

Corporate Updates

1085 - 555 Burr

P.O. Box 201

Vancouver, BC

Canada

February 20

ALORO M I

subsidiary, E

permit applic

SEMARNAT

The Informe

kms. of acces

This new per

hole LVRC-0

containing th

Au. That inte

of February 5

The area t o

mineralizatio

the Company

Thomas A. D

has turned it

the property

forward to ge

portion of the

Melvin A. H

contained in

technical disc

About Aloro

central part o

Inc. to the so

open pit. T h

copper.

ALORO MI

Per: “Thoma

Thomas A. D

President &

rard Street

C V7X 1M8

0, 2020

ALO

INING CO R

Exploraciones

cation that wa

T (The Secret

Preventivo (p

ss roads in or

rmit is focuse

012. That ho

he best gold i

ercept is interp

5, 2019 for fu

t h e w e s t w

on intercepted

y’s IP survey.

Doyle, Preside

around quick

has identified

etting the dril

e project.”

Herdrick, P G

this press re l

closures in th

o Mining Co

of the Mulato

outh. The wes

he known mi n

INING CORP

as A. Doyle”

Doyle

CEO

ORO RECEIV

RP. – (“ Aloro

s A l o r o , S . A .

as submitted o

tariat of Envir

permit) was g

der to reach t

ed on the sout

le cut 32m o

intercept of 7

preted to be a

urther details.

will target a

d by LVRC-0

ent, CEO, stat

kly. New ma p

d new minera

ll rig back on

Geo, a quali fi

lease. Mr. H e

is news releas

rp. Aloro con

s Gold Distri

stern border is

neralization w

P.

VES NEW P

o” or the “ Co

de C.V., it h

on January 1

ronment and N

granted for th

the 15 new dr

th area of the

f blind stron g

.6 m @ 1.13

at the margin

higher stra t

12. This area

ted “We are v

pping and sa m

alised structur

the property

fied person u

erdrick has s u

se.

ntrols the 319

ict and is dir e

s shared with

within the M

PERMIT TO

ompany”) is

has been inf o

3, 2020 has b

Natural Resou

he drilling of

rill site locatio

Los Venados

g silicic alte r

1 g/t Au and

of a conceale

tigraphic le v

a will also test

very pleased t

mpling by th e

res in addition

and follow u

under N I 4 3-

upervised the

99 hectare Lo

ectly adjacent

h Agnico Eagl

Mulatos Distri c

O DRILL LO

pleased to a

ormed by its

been accepted

urces) on Feb

15 drill holes

ons. The new

s (LV) Projec

ration with b r

32.3 g/t Ag,

ed felsic dome

vel and/or f e

t the highest

that SEMAR

e Aloro geol o

n to what w a

up on the disc

-101, is res p

e preparation

os Venados Pr

t to the activ e

le Mines Lim

ct is gold-d o

http://ww

For furth

Thomas A

Logan An

Phone: (6

Email: inf

Email

TS

FRANKF

S VENADOS

announce tha t

environment

d and a new p

bruary 15, 202

s and the cons

permit is val

ct, to the west

recciated vug

, including 4.

e. See the Co

eeder of th e

chargeability

RNAT reviewe

ogical team i n

as intercepted

overies we ha

ponsible for

of and appr o

roject (LV) w

e Mulatos ope

mited where it

ominant, wit h

ww.aloromini

er informati

A. Doyle

nderson

604) 689-5722

fo@aloromin

Tel: (604)

Fax: (604)

l: info@alorom

SX.V Symbol

FURT Symb

S

t through its

tal consultan t

permit was gr

20.

struction of u

id for 2 years

t of the discov

ggy silica an d

57 meters o f

ompany’s new

e alteration a

y anomaly rec

ed our applica

n the south p

d in LVRC-01

ave found in

the technica l

oved the scie n

which is locat

en pit of Ala m

t operates the

h accessory s i

ing.com/

on, please co

2

ning.com

) 689-5722

) 685-9182

ining.com

l AORO

bol 4LPP

Mexican

t that the

ranted by

up to 3.38

s.

very drill

d sulfides

f 1.72 gpt

ws release

and gold

corded by

ation and

portion of

12. I look

the south

l content

ntific and

ted in the

mos Gold

La India

ilver and

ontact:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.