Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AORO.V ·

Frankfurt Symbol 4LPP Aloro to Acquire the Historic Quitovac MINE Project

Mergers & Acquisitions Property Options & Staking

January 31, 2023 TSX.V Symbol AORO

FRANKFURT Symbol 4LPP

ALORO TO ACQUIRE THE HISTORIC QUITOVAC MINE PROJECT

ALORO MINING CORP. – (the “Company” or “Aloro”) is pleased to announce that it has signed an

Option Agreement to acquire 100% of the Quitovac Gold Mine Project (Quitovac) in Sonora, Mexico.

Quitovac is located in the prolific Mojave-Sonora Megashear, where a large part of Mexico’s recent gold

production is derived. Aloro has entered into the agreement with Cuesta Del Cobre, S. De R.L. De C.V. 

of Hermosillo, Sonora, Mexico.

The Quitovac Gold Mine Project consists of 14 mineral concessions that cover 2,643.82 hectares of highly

prospective geological units for gold mineralization. The Quitovac area is located approximately 220

km northwest of Hermosillo, Sonora, the state capital, and 45 km sout h of the US International border

at Sonoyta, Sonora, Mexico.

The Quitovac mineralized area is classified with th e other orogenic shear zone gold deposits of the

region including the gold mines of Mesquite, La Choya (8kms south), La He rradura (35 kms south,

produced over 425,288 oz Au in 2020), San Francisco, and El Chanate. All these gold deposits are similar

in character and are stated to be part of the Mojave-Sonora Megashear.

Please see the Quitovac location map:

https://aloromining.com/site/assets/files/5230/quitovac_location_map_mojave-

sonora_megashear_gold_depo.pdf

Both “hardrock” gold mining and gold placer activity were described as being active south of Quitovac

village around 1833-1840 with more extensive work being initiated around 1880 through 1910. Total

production of the “Quitovac mines” from these historic times was estimated at 150,000 oz. gold.

Please see the Quitovac historic photo:

https://aloromining.com/site/assets/files/5230/historical-quitovac.jpg

Four modern drilling campaigns at Quitovac have been completed and total 110 drill holes with 12,450

meters drilled.

The following table specifies the various drill campaigns and company involved with each drill

campaign.

Company Year No. of drill holes Meters drilled

Penmont (Penoles-Newmont) 1987-1990 63 RC plus 2 core 6700

Santa Cruz 1996 20 RC 2885.5

Copper Ridge Exploration 2004-2005 13 Diamond drill core 1134.4

Minera Mystery 2011-2012 12 RC 1730

Terms of option are as follows:

This transaction is subject to the approval of the TSX Venture Exchange.

Thomas A. Doyle, President, CEO , stated “The acquisition of Quitovac gives Aloro a strong

exploration presence in the Mojave-Sonora Megashear. I look forward to the news flow from this area

as well as updates coming from Los Venados as Alam os Gold continues their exploration as part of

their US$5,000,000 Option Agreement.”

About Aloro Mining Corp.

Aloro controls the 3,199 hectare Los Venados Project, which is located in the central part of the Mulatos

Gold District. The western property boundary is shared with Agnico Eagl e Mines Limited where it

operates the La India open pit mine, and it is directly adjacent to the active Mulatos open pit of Alamos

Gold Inc. to the south. The known mineralization within the Mulatos District is gold-dominant, mainly

high sulfidation epithermal type of mineralization, with accessory silver and copper.

ALORO MINING CORP.

Per: “Thomas A. Doyle”

Thomas A. Doyle

President & CEO

http://www.aloromining.com/

For further information, please

contact:

Thomas A. Doyle

Phone: (604) 689-5722

Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

Payment Date 

Cash Payment

Amount  Share Issuance

Within 30 days of the Approval Date  $35,000+VAT  200,000 

On or before the date that is one (1) year after

the Approval Date  $45,000+VAT  200,000 

On or before the date that is two (2) years

after the Approval Date  $55,000+VAT  200,000 

On or before the date that is three (3) years

after the Approval Date  $65,000+VAT  200,000 

On or before the date that is four (4) years

after the Approval Date  $75,000+VAT  300,000 

On or before the date that is five (5) years

after the Approval Date  $100,000+VAT  400,000 

On or before the date that is six (6) years  

after the Approval Date 

$200,000+VAT  500,000 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.