Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AORO.V ·

Aloro Reports Drill Results from High Sulfidation Los Venados Project

Drill Results

1085 - 555 Burrard Street

P.O. Box 201

Vancouver, BC V7X 1M8

Canada

Tel: (604) 689-5722

Fax: (604) 685-9182

Email: [email protected]

June 9, 2019 TSX.V Symbol AORO

FRANKFURT Symbol 4LPP

ALORO REPORTS DRILL RESULTS FROM HIGH SULFIDATION

LOS VENADOS PROJECT

ALORO MINING CORP. – (the “Company”) has completed drilling at the Los Venados (LV) Project

and has received the assay results. The drilling included four drill holes for approximately 1347 meters

of drilling. The four drill holes were targeting to locate and test a “blind” mineralized felsic dome

structure adjacent to the Mulatos active mine’s high grade Escondida gold bearing felsic dome. This

target was projected from data and mapping all acquired from the completion of 12 prior drill holes in

late 2018 and more specifically by drill hole LVRC-012.

The stratigraphy and structural projections indicated a felsic dome zone occurring in the southeastern

part of the Venados concession.

Drilling of these most recent drill holes successfully located a felsic dome with sulfide contents ranging

from 3 to over 10 weight percent pyrite content in pervasive altered volcanic flow units and intrusive

dome rock unit up to 200 meters thick. Geological success was not rewarded while the assays results

showed only very low grade gold in scattered intercepts of gold content throughout the broad zone of

pyritized felsic dome. Other elements present are broad anomalous arsenic with irregularly weakly

anomalous bismuth and lead and zinc. More resolution of geochemical patterns in the concession are

planned, however the southeastern area of the concession is not being targeted for further ground work.

Los Venados June 2019 Drill Map:

https://aloromining.com/site/assets/files/5158/se_corner-_los_venados-_5500_scalew.png

Los Venados Geological Cross Section of Drilling:

https://aloromining.com/site/assets/files/5158/section_a-a_lvrc-012-_014-_013-modelw.png

Best Intervals of Drilling:

Drill hole ID From (m) To (m) Length (m) Au (g/t) Ag (g/t)

LVRC-013 NSV NSV

LVRC-014 284.99 288.04 3.05 0.138 3.2

LVRC-014 298.70 300.23 1.53 0.127 16.5

LVRC-014 315.47 318.52 3.05 0.218 0.5

LVRC-015 NSV NSV

LVRC-016 284.99 292.61 7.62 0.164 4.5

Thomas A. Doyle, President, CEO, stated “Good application of geologic data allowed successful

discovery of the mineralized dome, however we are disappointed by the low gold content intercepted.

We will evaluate the technical aspects of the Los Venados Concession data to determine quality of

remaining gold targets.”

Melvin A. Herdrick, PGeo, a qualified person under NI 43-101, is responsible for the technical content

contained in this press release. Mr. Herdrick has supervised the preparation of and approved the scientific

and technical disclosures in this news release.

About Aloro Mining Corp.

Aloro controls the 3,199 hectare Los Venados Project which is located in the central part of the Mulatos

Gold District and the western border of which property is shared with Agnico Eagle Mines Limited

where it operates the La India open pit mine. The Los Venados Project is directly adjacent to the active

Mulatos open pit of Alamos Gold Inc. to the south. The known mineralization within the Mulatos

District is gold-dominant, with accessory silver and copper.

ALORO MINING CORP.

Per: “Thomas A. Doyle”

Thomas A. Doyle

President & CEO

http://www.aloromining.com/

For further information, please

contact:

Thomas A. Doyle

Logan Anderson

Phone: (604) 689-5722

Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.