Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ANK.V ·

An Gko R Reso Urces Un Dertakes IN Sp Ectio N an D Assessment of Offshore Cambodian Oil Field

Corporate Updates

1

AN GKO R RESO URCES UN DERTAKES IN SP ECTIO N AN D

ASSESSMENT OF OFFSHORE CAMBODIAN OIL FIELD

GRANDE PRAIRIE, AB, ( May 25, 2022): Angkor Resources Corp. (TSXV: ANK and OTC: ANKOF)

(“Angkor” or “the Company”) announces Angkor’s energy subsidiary, EnerCam Resources Corp.,

(EnerCam) advances potential Cambodian energy with inspection of production facilities in the offshore

Khmer Basin.

Executive VP Operations of Angkor, and President of EnerCam, Mike Weeks , at the reque st of

government officials of Ministry of Energy in the Kingdom of Cambodia, has led a technical assessment

and inspection of the offshore production facilities and drilling platform, located 160 kms from

Sihanoukville at the offshore oil field in the Khmer Basin of the Gulf of Thailand.

As President of and on behalf of EnerCam, Weeks, with over 3 0 years’ experience in international

petroleum production, undertook a comprehensive study of producing offshore reservoir and potential

recovery of further oil production over the past five months. As follow up to the report, submitted to

Ministry of Mines and Energy (MME) in March, Weeks recently oversaw a physical inspection of the

offshore facilities. The crew ship taking the team 160 kilometers southwest of Sihanoukville, departed

May 3 and the 8 -man technical team was joined by 15 officials from Cambodia’s MME through

inclement weather and unsettled waters.

In December of 2021, Weeks coordinated a team of veterans and specialists, each with +35 years of

practical expertise, most of whom are Canadian, to study the potential to restart and continue

producing the field. Team members included experienced specialists in fields such as reservoir

integrity, down-hole well optimization, environmental impact, safety, and other production fields.

Figure 1 Offshore drilling platform with production barge nearby.

2

“We’re happy to assist Cambodia in developing its own energy sector both offshore and onshore,” says

Weeks. This inspection of the existing facilities aids in providing industry and government to determine

next steps in future production and expansion of Cambodia’s own production.”

A full inspection report and production restart analysis is being reviewed by all parties currently.

Figure 2 Weeks with MME's technical director on supply vessel backing on to drilling platform.

3

QUALIFIED PERSON

Dennis Ouellette, B.Sc, P.Geo., is a member of The Association of Professional Engineers and

Geoscientists of Alberta (APEGA #104257) and a Qualified Person as defined by National Instrument

51-101 (“NI 51-101”). He is the Company’s VP Exploration on site and has reviewed and approved the

technical disclosure in this document.

ABOUT ANGKOR RESOURCES CORPORATION:

Angkor Resources Corp. is a public company, listed on the TSX -Venture Exchange, and is a leading

resource optimizer in Cambodia with multiple licenses in NE quadrant of the country. In 2020, the

company received approval and initiated negotiations on Production Sharing Contract (PSC) terms for

Block VIII, a 7,300 square kilometre oil and gas license in Cambodia.

CONTACT:

Delayne Weeks, CEO

Telephone: +1 (780) 831-8722 Email: [email protected]

Website: http://www.angkorresources.ca or follow us on Twitter @AngkorResources

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown

risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the

control of the Company, including, but not limited to the potential for gold, other minerals and/or oil and gas/energy-related projects at any

of the Company’s properties, the prospective nature of any claims comprising the Company’s property interests, the impact of general

economic conditions, industry conditions, dependence upon regulatory approvals, uncertainty of sample results, timing and results of future

exploration, and the availability of financing. Readers are cautioned that the assumptions used in the preparation of such i nformation,

although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on

forward-looking statements