Arizona Metals Files Technical Report for the Kay Mine Project

Resource Estimates Technical Reports (NI 43-101)

22518664.2

Arizona Metals Files Technical Report for the Kay Mine Project

Toronto, August 14, 2025 – Arizona Metals Corp. (TSX:AMC , OTCQ X:AZMCF) (the

“Company” or “Arizona Metals”) is pleased to announce that, further to its new s release dated

June 30, 2025, the Company has filed the independent technical report supporting the first ever

mineral resource estimate in respect of the Company’s Kay Mine Project.

The technical report , titled “ Technical Report On The Mineral Resource Estimate for the Kay

Deposit Cu-Au-Zn-Pb-Ag Project, Yavapai County Arizona, USA”, has been filed on SEDAR+ in

accordance with National 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

The technical report is dated August 14, 2025, with an effective date of June 17, 2025, and was

authored by Allan Armitage, PhD, P. Geo ., and Ben Eggers, MAIF, P. Geo ., of SGS Geological

Services (“SGS”) and Shaohai (Sam) Yu, P. Met of SGS Bateman (“ SGS”), each of whom is a

independent Qualified Person as defined in NI 43-101.

A copy of the technical report is available under the Company’s profile on SEDAR+ at

www.sedarplus.com.

About Arizona Metals Corp

Arizona Metals Corp owns 100% of the Kay Mine Project in Yavapai County, which is located on

1669 acres of patented and BLM mining claims and 193 acres of private land that are not subject

to any royalties. The Kay Mine Project is a steeply dipping VMS deposit that has been defined

from a depth of 60 m to at least 900 m. It is open for expansion on strike and at depth.

The Company also owns 100% of the Sugarloaf Peak Project, in La Paz County, which is located

on 4,400 acres of BLM claims. The Sugarloaf Peak Project is a heap-leach, open-pit target and has a

historic estimate of “100 million tons containing 1.5 million ounces gold” at a grade of 0.5 g/t

(Dausinger, N.E., 1983, Phase 1 Drill Program and Evaluation of Gold-Silver Potential, Sugarloaf

Peak Project, Quartzsite, Arizona: Report for Westworld Inc.)

The historic estimate at the Sugarloaf Peak Project was reported by Westworld Resources in 1983.

The historic estimate has not been verified as a current mineral resource. None of the key

assumptions, parameters, and methods used to prepare the historic estimate were reported, and no

resource categories were used. Significant data compilation, re-drilling and data verification may

be required by a Qualified Person before the historic estimate can be verified and upgraded to a

current mineral resource. A Qualified Person has not done sufficient work to classify it as a current

mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral

resource.

Disclaimer

This press release contains statements that constitute “forward-looking information” (collectively,

“forward-looking statements”) within the meaning of the applicable Canadian securities

legislation. All statements, other than statements of historical fact, are forward-looking statements

and are based on expectations, estimates and projections as at the date of this news release. Any

statement that discusses predictions, expectations, beliefs, plans, projections, objectives,

assumptions, future events or performance (often but not always using phrases such as “expects”,

22518664.2

or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”,

“scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and

phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or

“will” be taken to occur or be achieved) are not statements of historical fact and may be forward-

looking statements. Forward-looking statements contained in this press release include, without

limitation, statements regarding the expansion potential of the Kay Project, statements regarding

drill results and future dr illing at the main Kay Project, and at additional targets including the

North, North-Central and Western Targets at the Kay Project, and expansion drilling targets on

the Kay Project , , statements regarding drilling and other exploration activity on the Su garloaf

Peak Gold Project, statements regarding completion of a PEA in H2 2025 or at all, statements

regarding execution of the Company’s plans for 2025 and the achievement of targeted milestones.

In making the forward- looking statements contained in this press release, the Company has made

certain assumptions. Although the Company believes that the expectations reflected in forward -

looking statements are reasonable, it can give no assurance that the expectations of any forward-

looking statements will prov e to be correct. Known and unknown risks, uncertainties, and other

factors which may cause the actual results and future events to differ materially from those

expressed or implied by such forward-looking statements. Such factors include, but are not limited

to: availability of the Company to stay well funded; delay or failure to receive required permits or

regulatory approvals; and general business, economic, competitive, political and social

uncertainties. Accordingly, readers should not pla ce undue reliance on the forward -looking

statements and information contained in this press release. Except as required by law, the

Company disclaims any intention and assumes no obligation to update or revise any forward -

looking statements to reflect actual results, whether as a result of new information, future events,

changes in assumptions, changes in factors affecting such forward - looking statements or

otherwise.

THE TORONTO STOCK EXCHANGE HAS NEITHER REVIEWED NOR ACCEPTS RESPONSIBILITY

FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE

Not for distribution to US newswire services or for release, publication, distribution or dissemination

directly, or indirectly, in whole or in part, in or into the United States

For further information, please contact:

Morgan Knowles

Vice President of Investor Relations

(647) 202-3904

[email protected]

or

Duncan Middlemiss

President and CEO

[email protected]

www.arizonametalscorp.com

https://x.com/ArizonaCorp