Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AMC.TO ·

Arizona Metals Corp Acquires Additional Private Land for Development Infrastructure

Mergers & Acquisitions

Arizona Metals Corp Acquires Additional Private Land for Development Infrastructure

Toronto, May 6th, 2024 – Arizona Metals Corp. (TSX:AMC, OTCQX:AZMCF) (the “Company”

or “Arizona Metals”) is pleased to announce that it has completed the acquisition of 100% of an

Arizona State Land parcel totaling 40 acres (the “Property”), located 400 metres northeast of its

Kay Mine property. The Property was acquired from the Arizona State Land Department by way

of an auction process . As part of this process, Arizona Metals commissioned independent

biological and archaeological studies w hich both demonstrated zero adverse impacts or

remediation requirements. The Property includes the surface and water rights, among other rights

and benefits. The Company has also staked unpatented lode and placer claims that secure mineral

rights to this land.

Transaction Details

The Company will make total payments of US$366,100 to the State of Arizona as consideration

for a 100% interest in the Property.

Marc Pais, CEO of Arizona Metals comments, “The acquisition of the Property is another

significant de -risking step in moving the Kay Mine Deposit closer to a production decision.

Including the 7 1 acres of patented land that host our Kay Mine Deposit, this acquisition will

increase our total holdings of private and patented land to 264 acres. The Property is contiguous

with and adjacent to the 153 acres of patented land (including water rights and wells) acquired

up to November 2023 . The additional land we are acquiring increases the private land suitable

for future mine infrastructure by 26% and is in -line with our vision of a minimally disruptive

operation while also allowing for an expanded operational footprint.

We believe that our Kay Mine Project has the potential to become one of Arizona’s newest and

highest-grade copper -gold-zinc-silver mines, with the main deposit and potential for all

infrastructure to be located on private land. This would allow for a relatively small footprint while

also providing high -paying jobs to the local community of Black Canyon City. The Kay Mine

Project already has the benefit of being only an hour north of Phoenix, with excellent access to

infrastructure, including rail, roads, wa ter, and power. The acquisition announced today will

provide the potential for an expanded operation, increased flexibility in mine design, and

accelerated permitting timelines.”

Figure 1. Kay Mine claims showing the acquisition Property located 950 metres to the northeast

About Arizona Metals Corp

Arizona Metals Corp owns 100% of the Kay Mine Property in Yavapai County, which is located

on a combination patented and BLM claims totaling 1,665 acres that are not subject to any

royalties, and 193 acres of private land. An historic estimate by Exxon Minerals in 1982 reported a

“proven and probable reserve of 6.4 million short tons at a grade of 2.2% copper, 2.8 g/t gold,

3.03% zinc, and 55 g/t silver.” The historic estimate at the Kay Mine was reported by Exxon

Minerals in 1982. (Fellows, M.L., 1982, Kay Mine massive sulphide deposit: Internal report

prepared for Exxon Minerals Company)

*The Kay Mine historic estimate has not been verified as a current mineral resource. None of the

key assumptions, parameters, and methods used to prepare the historic estimate were reported, and

no resource categories were used. Significant data compilation, re -drilling and data verification

may be required by a Qualified Person before the historic estimate can be verified and upgraded

to be a current mineral resource. A Qualified Person has not done sufficient work to classify it as

a current mineral reso urce, and Arizona Metals is not treating the historic estimate as a current

mineral resource.

The Kay Mine is a steeply dipping VMS deposit that has been defined from a depth of 60 m to at

least 900 m. It is open for expansion on strike and at depth.

The Company also owns 100% of the Sugarloaf Peak Property, in La Paz County, which is located

on 4,400 acres of BLM claims. Sugarloaf is a heap-leach, open-pit target and has a historic estimate

of “100 million tons containing 1.5 million ounces gold” at a grade of 0.5 g/t (Dausinger, N.E.,

1983, Phase 1 Drill Program and Evaluation of Gold -Silver Potential, Sugarloaf Peak Project,

Quartzsite, Arizona: Report for Westworld Inc.)

The historic estimate at the Sugarloaf Peak Property was reported by Westworld Resources in

1983. The historic estimate has not been verified as a current mineral resource. None of the key

assumptions, parameters, and methods used to prepare the historic estimate were reported, and no

resource categories were used. Significant data compilation, re-drilling and data verification may

be required by a Qualified Person before the historic estimate can be verified and upgraded to a

current mineral resource. A Qualified Person has not done sufficient work to classify it as a current

mineral resource, and Arizona Metals is not treating the historic estimate as a current mineral

resource.

The Qualified Person who reviewed and approved the technical disclosure in this release is David

Smith, CPG.

This press release contains statements that constitute “forward-looking information” (collectively,

“forward-looking statements”) within the meaning of the applicable Canadian securities

legislation, All statements, other than statements of historical fact, are forward-looking statements

and are based on expectations, estimates and projections as at the date of this news release. Any

statement that discusses predictions, expectations, beliefs, plans, projections, objectives,

assumptions, future events or performance (often but not always using phrases such as “expects”,

or “does not expect”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”,

“scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and

phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or

“will” be taken to occur or be achieved) are not statements of historical fact and may be forward-

looking statements. Forward-looking statements contained in this press release include, without

limitation, statements regarding the acquisition of the Property, including completion of due

diligence and the satisfaction of the Company’s payment obligations under the Purchase

Agreement, and the completion of the Offering . In making the forward - looking statements

contained in this press release, the Company has made certain assumptions. Although the

Company believes that the expectations reflected in forward-looking statements are reasonable, it

can give no assurance that the expectations of any forward -looking statements will prove to be

correct. Known and unknown risks, uncertainties, and other factors which may cause the actual

results and future events t o differ materially from those expressed or implied by such forward-

looking statements. Such factors include, but are not limited to: availability of financing; delay or

failure to receive required permits or regulatory approvals; and general business, eco nomic,

competitive, political and social uncertainties. Accordingly, readers should not place undue

reliance on the forward-looking statements and information contained in this press release. Except

as required by law, the Company disclaims any intention and assumes no obligation to update or

revise any forward -looking statements to reflect actual results, whether as a result of new

information, future events, changes in assumptions, changes in factors affecting such forward -

looking statements or otherwise.

NEITHER THE TSX VENTURE EXCHANGE (NOR ITS REGULATORY SERVICE PROVIDER)

ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE

Not for distribution to US newswire services or for release, publication, distribution or dissemination

directly, or indirectly, in whole or in part, in or into the United States

For further information, please contact:

Morgan Knowles

Vice President of Investor Relations

(647) 202-3904

[email protected]

or

Marc Pais

President and CEO Arizona Metals Corp.

(416) 565-7689

[email protected]

www.arizonametalscorp.com

https://twitter.com/ArizonaCorp