Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ALTA.V ·

Altamira drills 4m @ 3.23g/t gold at Crepori project, Brazil

Drill Results

Altamira drills 4m @ 3.23g/t gold at Crepori project,

Brazil

Vancouver, British Columbia--(Newsfile Corp. - February 9, 2018) -

Altamira Gold Corp. (TSXV: ALTA) (FSE: T6UP) (OTC

Pink: EQTRF)

,

("

Altamira

" or the "

Company

") is pleased to provide drill results from the first phase drill program at the

Crepori project located in southern Para state, Brazil. Highlights are as follows:

Hole CPR-1 which was drilled at the Ze Milton target below an area of historic workings and sheeted veining exposed on

surface which has grab values of 6.54 - 39.24g/t gold, cut three zones of mineralization including

1m @ 4.55g/t gold, 4m

@ 3.23g/t gold and 5m @ 1.81g/t gold

Hole CPR-2 which was drilled at the Raimundo target below surface workings, cut a narrow high-grade structure which

returned

0.4m @ 8.52g/t gold

and a second lower grade structure further down the hole which returned 0.6m @ 0.66g/t

gold

Hole CPR-3 which was drilled at the Ze do Bode target below historic surface workings cut two narrow low-grade but

mineralized structures which returned 2m @ 0.55g/t gold and 2m @ 0.56 g/t gold

The 100% owned Crepori project is located in southern Para state in Northern Brazil and has been the focus for significant but

small scale historic placer gold production which is estimated to have been in the order of at least 0.5Moz. The area has never

been previously drilled with a view to identifying the source of this gold. With this objective in mind, Altamira drilled a total of 7

holes for 876m at Crepori during November and December 2017. Holes were located in six separate areas where high grade

veins had been mapped on surface but surface exposures in the area are sparse with +99% of the area being covered by recent

soils.

Hole CPR-1 was drilled below an area of historic workings on a sheeted vein zone at the

Ze Milton

target with surface grab

samples returning ranges of 6.54 - 39.24g/t gold. Hole CPR-1 returned

1m @ 4.55g/t gold

from 79-80m

, 4m @ 3.23g/t gold

from 98-102m

and 5m @ 1.81g/t gold

from 104-109m

.

The grades and widths encountered in this first hole at Ze Milton are

considered very encouraging and require further drilling and follow up.

Hole CPR-2 was drilled below a surface showing at the

Raimundo

target, which previously returned values of 8.61 - 148.24 g/t

gold from surface grab samples. Hole CPR-2 returned

0.4m @ 8.52g/t gold

from 34.8 - 35.2m and a second lower grade

structure further down the hole which returned 0.6m @ 0.66g/t gold

from 84.4 - 85.0m depth

.

Hole CPR-3 was drilled below a surface showing at the

Ze do Bode

target and returned 2m @ 0.55g/t gold from 35 - 37m and

2m @ 0.56g/t gold from 51 - 53m depth.

No significant results were returned from Holes CPR-4 to CPR-7. The bulk of the placer gold previously mined from the area was

mined upstream from the Ze Milton and Ze de Bode targets in an area with virtually no outcrop and will be the focus of further

work aimed at identifying the bulk of the placer gold previously mined from the Crepori area.

Drill Results from Crepori Project, Brazil

To view an enhanced version of this image, please visit:

http://orders.newsfilecorp.com/files/4500/32735_a1518204915023_86.jpg

Commenting on these results, Mike Bennett, President & CEO stated "the results of the first phase drill program at Crepori were

mixed. Whilst we are encouraged by the presence of significant mineralization in the Ze Milton area, the bulk of the alluvial gold

mined from surface at Crepori and estimated to have been in the order of 0.5Moz, remains unexplained. Further drilling will be

required in order to identify the hard rock source of the alluvial gold, but in view of the recent discoveries in the Baldo East area

at Cajueiro, additional drilling at Crepori will be a secondary priority".

The company follows industry standard procedures with a quality assurance/quality control (QA/QC) program. 2 Blank, 2

duplicate and 2 standard samples were inserted in each batch of 40 samples.

Sample preparation and analysis was done at

SGS GEOSOL in Vespasiano, Minas Gerais State, Brazil. Analysis is performed by fire assay with 50g fusion and Atomic

Absorption Spectroscopy.

About Altamira Gold Corp.

The Company is focused on the exploration and development of gold deposits within western central Brazil. The Company holds

12 projects comprising approximately 200,000 hectares, within the prolific Juruena gold belt which historically produced an

estimated 7 to 10Moz of placer gold. The Company's advanced Cajueiro project has an NI 43-101 compliant resources of

8.64Mt @ 0.78 g/t Au (for 214,000oz) in the Indicated Resource category and 9.53Mt @ 0.66 g/t Au (for 204,000oz) in the

Inferred Resource category and an additional 1.37Mt @ 1.61 g/t Au in oxides (for 79,000oz in saprolite) in the Inferred Resource

category.

On Behalf of the Board of Directors,

ALTAMIRA GOLD

CORP.

"Michael Bennett

"

Michael Bennett

President & CEO

Tel: 604.676.5660

[email protected]

Guillermo Hughes

, P. Geo., a consultant to the Company as well as a Qualified Person as defined by National Instrument 43-

101, supervised the preparation of the technical information in this news release.

Neither TSX Venture Exchange nor it Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

Statements in this document which are not purely historical are forward-looking statements, including any statements

regarding beliefs, plans, expectations or intentions regarding the future. It is important to note that actual outcomes and the

Company's actual results could differ materially from those in such forward-looking statements.

Except as required by law, we

do not undertake to update these forward

-

looking statements.