Highlights:

• Hole AG_GC_003 intersected a broad zone of strong copper-gold-silver

mineralization, including 18.2 m @ 1.8% CuEq (1.2% Cu, 28.2 g/t Ag, 0.7 g/t Au),

including 3.5 m @ 3.9% CuEq (2.4% Cu, 61.1 g/t Ag, 1.8 g/t Au).

• Consistent Cu-Au-Ag mineralization with 57 m above 1.8% CuEq between multiple

intervals, confirming a vertically stacked high-grade skarn system (see Table 1)

• Five skarn horizons identified, including three newly discovered horizons

• Increased Molybdenum values identified in intrusive-related intervals, defining a

metal zonation pattern consistent with a porphyry-skarn system

• System remains open along strike and at depth, with vectors for expansion and

discovery

VANCOUVER, BC – April 2 – Algo Grande Copper Corp. (“Algo Grande ” or the “Company ”)

(TSX-V: ALGR | OTC: ALGRF | FRA: KM00) reports assay results from the remaining three

drill holes of its inaugural Phase I drill program at the Cerro Grande Skarn target within the

Adelita Project, Sonora, Mexico.

The Phase I program consisted of four drill holes totaling 1,998 metres, designed to

confirm high-grade skarn mineralization at depth. A review of historical data suggested the

skarn zone may be thicker than previously understood, and results from this program

confirm that mineralization extends beyond the limits of earlier drilling, which only partially

tested the system, highlighting expansion potential at depth and along the broader

footprint.

These results confirm the presence of an outcropping, vertically extensive copper-silver-

gold skarn system, with increasing evidence supporting a genetically related porphyry

system at depth.

Table 1 - Significant Intersects

Note: Copper equivalent (CuEq) for drill intersections is calculated based on US$ 4.75/lb Cu, US$ 3,000/oz

Au, and US$ 45/oz Ag, with 80% metallurgical recoveries assumed for all metals due to the early-stage nature

of the project and absence of metallurgical data. The formula is: CuEq% = 0.8*(Cu % + (0.92 * Au g/t) +

(0.0138 * Ag g/t)). The CuEq values are provided for comparative purposes only and do not imply that all

metals will be recovered or that the reported grades will be realized in a production scenario. Intervals

reported are downhole lengths; true widths are unknown. Drill hole AG_GC_001, AG_GC_002, AG_GC_003

and AG_GC-004 have been collared at approximate coordinates 739,086E and 2,961,834N (WGS84, Zone 12)

at an elevation of 468 metres above sea level. AG_GC_001 was drilled with an azimuth of 250º and a dip of -

65º. AG_GC_002 was drilled with an azimuth of 250º and a dip of -50º, AG_GC_003 was drilled with an

azimuth of 240º and a dip of -50º, AG_GC_004 was drilled with an azimuth of 260º and a dip of -50º.Drilling

commenced on November 23, 2025 and was completed on February 04, 2026

Drilling was completed using diamond core drilling techniques. Core recovery for all drill holes averaged

greater than 95% and is not believed to have materially affected the accuracy or reliability of the assay

results. Core was logged, photographed, and sampled using standard industry practices. Samples were

prepared and analyzed at a certified analytical laboratory using industry-standard methods. Quality

assurance and quality control procedures included the insertion of blanks, standards, and duplicates at

regular intervals.

Enrico Gay, CEO of Algo Grande Copper, commented: “These results validate our thesis

that the Cerro Grande Skarn has the potential to scale into a large, high-grade skarn

system. The identification of multiple stacked skarn horizons, combined with strong metal

zonation and molybdenum vectoring, reinforces our view that we are operating within a

large-scale porphyry-skarn system. With Phase I complete, we are now advancing toward

Phase II drilling, focused on expanding the Cerro Grande footprint along strike, testing

additional skarn targets across the broader 6-kilometre corridor, and advancing toward the

potential porphyry source at depth.”

Confirmation of a Multi -Horizon Skarn System

Drill holes AG_GC_001 through AG_GC_004 collectively confirm the presence of a copper-

silver-gold skarn system at Cerro Grande (Figure 1). While AG_GC_001 did not intersect

significant mineralization, holes AG_GC_002, AG_GC_003, and AG_GC_004 intersected

multiple intervals of skarn-hosted mineralization, confirming both lateral and vertical

continuity of the system (Figure 2). Notably, hole AG_GC_003 returned the strongest

intercept of the program, despite experiencing drilling deviation and not fully reaching the

planned target zone.

Figure 1 - Plain view of drill holes and best intersects

Figure 2 - Cross-section of drill holes from inaugural drilling campaign and best intersects

Note: Certain drill hole data presented herein is historical in nature and was completed by previous operators,

including Minaurum Gold Inc., Ocean Park Ventures Corp., and Infinitum Copper Corp., between 2010 and

2023. The historical drilling consists of diamon d drill holes, with samples analyzed at ALS laboratories in

Hermosillo, Mexico and Vancouver, Canada, and by ALG Global Geochemistry using ICP -MS and Fire Assay

methods.

A Qualified Person has reviewed and verified the historical data, including drill collar locations, downhole

orientation (dip and azimuth), sampling procedures, and assay methodologies. Collar locations and drill

orientations were validated in the field, and the analytical methods used are consistent with industry-standard

practices. The Qualified Person has also reviewed the available QA/QC information and considers the data to

be of acceptable quality for the purposes of this disclosure.

While the historical data is considered reliable and suitable for geological interpretation and targeting, a

Qualified Person has not completed sufficient work to classify the historical information as current mineral

resources or mineral reserves, and the issuer is not treating the historical data as current mineral resources or

mineral reserves.

Mineralization is hosted within two dominant skarn types: (i) magnetite-rich skarns

characterized by abundant chalcopyrite, and (ii) garnet-dominant skarns hosting

chalcocite and bornite as the principal copper sulphides. This variation in mineral

assemblages reflects evolving conditions within the hydrothermal system and is

consistent with metal zonation typically observed in porphyry-related skarn environments.

When considering all the mineralization intersected, a total of 104.76 meters above 0.8%

CuEq have been intersected between the 4 drill holes. These intervals incorporate both

skarn-hosted mineralization and mineralized wall rocks and include internal dilution. As

such, they are not presented as discrete skarn intercepts but highlight the overall scale

and continuity of the mineralized system.

Importantly, drilling has now defined at least five distinct skarn horizons within the system.

The presence of multiple stacked skarn horizons is significant, as it materially increases

the vertical extent and potential tonnage of the system relative to a single-horizon model.

In analogous porphyry-skarn systems, stacked horizons reflect multiple mineralizing

events and evolving fluid pathways, and can locally coalesce into thicker, higher-grade

mineralized zones.

The Cerro Grande skarn system is exposed at surface, confirming that mineralization is not

deeply buried and allowing direct observation and targeting of the system. The

combination of surface exposure, demonstrated vertical continuity, and multiple stacked

horizons supports the interpretation of a large-scale, long-lived hydrothermal system with

strong potential for tonnage growth through both lateral expansion and depth extension.

Metal Zonation and Porphyry Vectoring

The drilling results highlight a clear metal zonation within the system. The strongest skarn

intercepts are characterized by elevated copper, silver, and gold grades, consistent with

typical skarn deposits proximal to porphyry centers.

Several molybdenum-bearing intervals (AG_GC_002: 288.40 m to 289.44 – 1.04 m @ 1440

Mo; 333.0m to 333.8m - 0.8 @ 2820 Mo; 545.83m – 546.35 0.52m @ 1000 ppm Mo;

AG_GC_004: 274.5 -275.4 0.9m @ 521 ppm Mo) have been identified across the drill holes,

with values reaching up to 2,820 ppm on AG_GC_002 and above 500ppm on AG_GC_004.

These intervals are spatially distinct from the highest-grade copper-silver-gold skarn

mineralization and are commonly associated with intrusive phases, including andesitic

porphyry fingers and potassic alteration halos around quartz-calcite veins (Figure 3).

This decoupling of molybdenum from skarn-hosted copper mineralization is consistent

with established porphyry-skarn systems, where molybdenum enrichment occurs closer

to or within the causative intrusive center. These results provide a strong geochemical

vector toward a potential porphyry source at depth.

Figure 3. 3D schematic illustrating the proximity relationship between the Cerro Grande

Cu-Ag-Au skarn deposit and the modelled resistivity anomaly, interpreted as a porphyry

intrusion at depth.

Exploration Implications

The results from the inaugural drill program confirm that Cerro Grande is an outcropping,

vertically extensive, multi-horizon skarn system with clear evidence of metal zonation and

a potential porphyry driver.

Importantly, the system remains open laterally and at depth, with mineralization now

confirmed well below historical drilling limits and along the extent of the currently defined

strike.

Key implications include:

• Increased confidence in the continuity and scale of skarn mineralization;

• Expansion of the mineralized footprint both laterally and vertically;

• Discovery of new mineralization at depth beyond historical drilling;

• Identification of robust geochemical vectors toward a potential porphyry system;

and

• Enhanced targeting framework for follow-up drilling

Building on the success of Phase I, the Company is now advancing a systematic, district-

scale exploration strategy across the Adelita Project. Upcoming milestones are expected

to include completion of property-wide LiDAR and drone magnetic surveys, results from a

systematic soil geochemistry program, and the definition of new drill targets along the 6-

kilometre skarn corridor.

The Phase II drill program, scheduled to commence in May 2026, will focus on step-out

drilling to expand known skarn horizons, deeper drilling to test porphyry targets, and initial

testing of newly defined district-scale targets.

QUALITY ASSURANCE / QUALITY CONTROL

All drill core samples were prepared and analyzed at ALS Laboratories, an independent,

internationally accredited laboratory , located in Hermosillo, Mexico and Vancouver,

Canada. Sample preparation was completed using ALS preparation methods CRU-31

(crushing), SPL-31 (splitting), and PUL -31 (pulverizing), resulting in a nominal pulp with at

least 85% passing a 75-micron sieve.

Multi-element analyses were completed using the ME -MS61L method, which involves a

four-acid digestion (hydrochloric, nitric, perchloric, and hydrofluoric acids) followed by

analysis using ICP -MS and ICP -AES techniques. The four -acid digestion is considered a

near-total digest for most base metal sulfides and associated gangue minerals. Gold was

analyzed using the AU-AA24 method, consisting of a 30 -gram fire assay fusion with an

atomic absorption spectroscopy (AAS) finish. Samples returning results above the upper

detection limits of the ME -MS61L method were re-assayed using appropriate over -limit

procedures, including AG-OG62 for silver and ME-OG62, Cu-OG62, Pb-OG62, and Zn-OG62

for base metals, as applicable.

ALS Laboratories employ internal quality control procedures including the routine insertion

of certified reference materials, blanks, and duplicates at regular intervals. Additionally, the

Company implemented an independent quality assurance and quality co ntrol program

through the systematic insertion of blind certified reference materials and blank samples

into the sample stream. Results from QA/QC samples were reviewed on receipt and found

to be within acceptable limits.

Qualified Person

The scientific and technical information disclosed in this news release has been reviewed

and approved by João Rocha, EurGeol, Vice President of Exploration of Algo Grande Copper

Corp., a Qualified Person as defined by National Instrument 43-101.

The Qualified Person has conducted appropriate data verification procedures on both

current and historical drilling data disclosed herein. Verification activities included review

of drill collar locations, downhole survey data, sampling procedures, and analytical results.

Collar locations and drill orientations were validated in the field, and assay data were

reviewed for consistency and compliance with industry -standard analytical methods,

including ICP-MS and fire assay. The Qualified Person also reviewed available QA/QC data

and considers the data to be of acceptable quality for the purposes of this disclosure.

The Qualified Person considers the data verification procedures undertaken to be

appropriate and sufficient to support the scientific and technical information disclosed in

this news release.

OTC Symbol Change

Algo Grande is additionally pleased to announce a symbol change from “KNDYF” to

“ALGRF” on the OTC Markets (“OTC”). Algo Grande’s common shares trade under the new

symbol on OTC effective as of April 1, 2026. Algo Grande’s common shares continue to

trade on the TSX Venture Exchange under the symbol “ALGR”. U.S. investors can find

current financial disclosure and Real-Time Level 2 quotes for the Company on

www.otcmarkets.com.

About Algo Grande Copper Corp.

Algo Grande Copper Corp. is a growth-focused mineral exploration company advancing

the Adelita Project, a district-scale, multi-system copper-silver-gold opportunity

positioned in the prolific Arizona-Sonora copper belt.

The company is dedicated to unlocking the full mineral potential of this under-explored

corridor through disciplined data-driven exploration, technical excellence, and a firm

commitment to value creation for shareholders. The 5,895-hectare Adelita Project is

anchored by the high-grade Cerro Grande Cu-Ag-Au skarn discovery, which exhibits strong

continuity along a defined corridor extending over 6 kilometers. Reprocessing of legacy

geophysical data and field mapping indicate the presence of a potential porphyry system

at depth, suggesting a classic skarn-porphyry mineralization model similar to major

deposits found throughout northwestern Mexico.

ON BEHALF OF ALGO GRANDE COPPER CORP.

Enrico Gay

Chief Executive Officer

For more information, please contact:

E-mail: [email protected]

Website: www.algo-grande.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES

PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE