Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ALEX.V ·

Alpha Exploration Announces Start of Drilling at Aburna Gold Prospect

Exploration Programs

Alpha Exploration Announces Start of Drilling

at Aburna Gold Prospect

Calgary, Alberta--(Newsfile Corp. - December 18, 2023) -

Alpha Exploration Ltd.

(TSXV:

ALEX) (

"Alpha"

or the

"Company"

) announces the start of drilling at the large Aburna Gold Prospect

(

"Aburna"

) on the Company's 100% owned, 771km² Kerkasha Project located in Eritrea.

Up to 10,000 metres of drilling, split into two separate 5,000m programs, is planned at Aburna. Drilling

will include both diamond ("DD") and reverse circulation ("RC") drilling. Additional exploration work is

also on-going at Aburna including trenching of high-priority surface geochemical targets and

metallurgical testwork.

HIGHLIGHTS:

Drilling to define primary mineralized lenses across Aburna prior to resource drilling

Program focused on Hill 52, Northeast and Central Areas covering >2km of mineralized

strike potential

Priority drill targets from recent geophysical programs also to be drill tested

Alpha is fully funded to complete drilling at Aburna and additional exploration across the

licence

Drilling recently recommenced at Aburna and is targeting the extension of primary gold zones

discovered at the Hill 52, Central and Northeast Area prospects where the Company has established

multiple areas of significant gold mineralization including intercepts of 23m @ 6.34 g/t Au and 19m @

5.19 g/t Au in Hill 52,

16m @ 14.07 g/t Au and 9m @ 10 g/t Au in Northeast Area and in 18 m @ 2.27 g/t

Au and 34 m @ 1.50 g/t Au in Central Area.

The objective of this focused phase of drilling at Aburna will

be to define priority targets for resource definition drilling, planned to commence later in 2024 and

subject to financing.

At Hill 52, drilling will target both along strike and the potential for high grade mineralization to plunge to

the north east, based on recent 3-D modelling by the Company. The Company will also prioritize follow

up to DD hole ABD008 from the most recent drilling at Hill 52, that intersected 3m @ 53.39 g/t Au

(including 1m@ 158 g/t Au) and reported on November 14

th

(

https://alpha-exploration.com/alpha-

reports-drill-results-from-aburna-gold-prospect-includes-9m-10-g-t-gold/

).

The potential for high-grade mineralization to plunge to the northeast has also been interpreted at

Northeast and Central Areas and will be tested and prioritized accordingly. At Northeast Area, this

includes testing the strike and depth extension of a significant "shoot" of gold mineralization currently

over 200m in length and as defined previously in drillholes ABR037 (16m @ 14.07 g/t Au) ABR043 (11m

@ 3.99 g.t Au) and ABR044 (13m @ 4.24 g/t Au). In Central Area, drilling will target both the extension of

existing high-grade mineralization along strike, and the potential for additional parallel mineralized

structures. Deeper drilling will test a major magnetic anomaly identified from the recent ground magnetic

survey interpreted to be at least 400m in diameter and located directly below mineralization identified

from prior drilling, including 18 m @ 2.27 g/t Au. The drill program will also include testing of a number of

priority ground geophysical targets defined from the recent GAIP (Gradient Array Induced Polarization)

and ground magnetics surveys (see news release from October 2

nd

:

https://alpha-exploration.com/alpha-

ground-geophysics-update-02-october-2023/

).

In parallel with drilling at Aburna, the Alpha exploration team will accelerate drill target definition at the

Anagulu Copper-Gold Prospect as well as trenching and further sampling at the Tolegimja Zinc-Copper-

Gold Prospect where the Company has discovered a significant VMS system within a 3km x 1km

anomalous zinc-copper footprint.

Following the successful closing of the first tranche of our private placement raising C$4.18m this month,

Alpha is fully funded to undertake the 10,000m program at Aburna as well as advancing the other key

prospects on the licence.

About Alpha

Alpha (TSXV: ALEX) is an exploration company that is rapidly advancing a number of important gold

and base metal discoveries across its 100% owned, large (771 km

2

) Kerkasha Project in Eritrea.

The Aburna Gold Prospect is an exciting new gold discovery where recent drilling has established a

high-grade discovery with grades including 16m @ 14.07g/t Au, 9m @10 g/t Au and 23m @ 6.74 g/t Au.

The Anagulu Gold-Copper Prospect includes recent drilling intersections of 108m @ 1.24 g/t Au &

0.60% Cu & and 49m @ 2.42 g/t Au & 1.10% Cu within a major porphyry unit mapped over at least 2km.

The Company has also advanced the Tolegimja VMS Copper-Zinc-Gold Prospect and over 17 other

gold prospects since listing in 2021.

The Company is managed by a group of highly experienced and successful professionals with long track

records of establishing, building and successfully exiting a number of world class gold and base metals

discoveries in Eritrea and across the wider Arabian Nubian Shield.

For further information go to the Alpha webpage at

www.alpha-exploration.com

or contact:

Michael Hopley

President and Chief Executive Officer

Alpha Exploration Ltd.

Email:

[email protected]

Tel: +44 207129 1148

Qualified Person

All scientific and technical information in this press release, including the results of the Aburna drill

program and how these results relate to the ongoing exploration at the Kerkasha Project has been

reviewed, verified, and approved by Michael Hopley, President, Chief Executive Officer of Alpha and a

"qualified person" for the purposes of National Instrument 43-101

- Standards of Disclosure for Mineral

Projects.

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to

United States newswire services or dissemination in the United States.

Forward-Looking Statements

Certain statements and information herein, including all statements that are not historical facts,

contain forward-looking statements and forward-looking information within the meaning of applicable

securities laws. Such forward-looking statements or information include but are not limited to

statements or information with respect to future dataset interpretations, sampling, plans for its projects

(including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling

program. Often, but not always, forward-looking statements or information can be identified by the use

of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may"

or "should" and the negative of these words or such variations thereon or comparable terminology are

intended to identify forward-looking statements and information. With respect to forward-looking

statements and information contained herein, Alpha has made numerous assumptions including

among other things, assumptions about general business and economic conditions and the price of

gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations

represented by such statements or information are reasonable, there can be no assurance that

forward-looking statements or information herein will prove to be accurate. Forward-looking statements

and information by their nature are based on assumptions and involve known and unknown risks,

uncertainties and other factors which may cause actual results, performance or achievements, or

industry results, to be materially different from any future results, performance or achievements

expressed or implied by such forward-looking statements or information. These factors include, but

are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha

given its limited operating history; business and economic conditions in the mining industry generally;

the supply and demand for labour and other project inputs; changes in commodity prices; changes in

interest and currency exchange rates; risks relating to inaccurate geological and engineering

assumptions (including with respect to the tonnage, grade and recoverability of reserves and

resources); risks relating to unanticipated operational difficulties (including failure of equipment or

processes to operate in accordance with specifications or expectations, cost escalation, unavailability

of materials and equipment, government action or delays in the receipt of government approvals,

industrial disturbances or other job action, and unanticipated events related to health, safety and

environmental matters); risks relating to adverse weather conditions; political risk and social unrest;

changes in general economic conditions or conditions in the financial markets; changes in laws

(including regulations respecting mining concessions); risks related to the direct and indirect impact

of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to

obtain financing as required, and causing potential delays to exploration activities; those factors

discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed

from time to time. Alpha does not undertake to update any forward-looking information, except in

accordance with applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/191406