Alpha Exploration Announces New Gold Discovery at Aburna with Drill Intercepts 15 M of 5.85 G/T Gold & 10 M of 5.24 G/T Gold
Alpha Exploration Announces New Gold
Discovery at Aburna with Drill Intercepts 15 M
of 5.85 G/T Gold & 10 M of 5.24 G/T Gold
Calgary, Alberta--(Newsfile Corp. - May 3, 2022) -
Alpha Exploration Ltd. (TSXV: ALEX)
("
Alpha
" or
the "
Company
") is pleased to announce results from 14 of 19
reverse-circulation (RC) drill holes at the
Aburna gold prospect, part of the Company's 100% owned Kerkasha Project, Eritrea.
Highlights
Drill hole ABR-005 in the Hill 52 location intersected 15 meters averaging 5.85 g/t gold.
Drill hole ABR-008 in the Celebration Hill location intersected 10 meters averaging 5.24 g/t gold.
The Aburna gold prospect on the Kerkasha Project has not been previously drilled. This initial
drilling program was conducted in February and March 2022 and consisted of 19 angled RC holes
to depths of 60 to 222 meters (see Drill Collar Table 2 below for more details)
Michael Hopley, Alpha President & CEO said, "We are very encouraged with these initial drill
results from Aburna, particularly because of the very large size potential of the prospect
indicated from earlier trenching over approximately 4 km by 2 kms. The results to date show
impressive widths of strong gold mineralization in two areas of interests at Aburna - Hill 52 and
Celebration Hill. Now that these areas have demonstrated possible economic grade
mineralisation is present, further drilling will focus on determining the strike extent and width
of mineralisation.
Table 1: Summary of Best Intervals from recent drilling at Aburna.
Hole Number
From (m)
To (m)
Interval (m)*
Au (g/t)
Area
ABR-001
2
16
14
0.87
Hill 52
and
37
45
8
1.58
Hill 52
ABR-002
2
7
5
3.65
Hill 52
and
14
18
4
1.38
Hill 52
and
64
65
1
1.08
Hill 52
and
69
72
3
1.90
Hill 52
ABR-003
89
91
2
1.43
Hill 52
ABR-004
14
16
2
3.00
Hill 52
and
21
22
1
1.44
Hill 52
ABR-005
6
21
15
5.85
Hill 52
and
46
47
1
4.48
Hill 52
and
25
26
1
2.43
Hill 52
and
55
57
2
4.65
Hill 52
and
64
65
1
3.31
Hill 52
ABR-006
27
28
1
1.12
Hill 52
and
136
137
1
3.31
Hill 52
ABR-007
23
24
1
1.85
Hill 52
ABR-008
49
59
10
5.24
Celebration Hill
and
85
86
1
1.57
Celebration Hill
ABR-011
59
60
1
1.77
Celebration Hill
ABR-012
58
59
1
1.49
Celebration Hill
*Note that at this early stage of exploration the true width of the mineralization is uncertain, but it is estimated to be 70 to 80% of reported intervals.
Intervals are calculated with a start and end value of not less than 0.92g/t Au using a 0.2 g/t Au cut-off and a maximum internal dilution of 2 m.
Aburna Gold Prospect
Aburna Gold Prospect
The Aburna gold prospect is located on the western side of the Company's large Kerkasha Exploration
License. Gold was mined at Aburna in the 1920s by Italian colonial miners and more recently by local
artisanal miners. Earlier work by Alpha has identified gold mineralization over an area of approximately
4 km by 2 km northeast of the colonial Mine. Gold mineralization at Aburna is orogenic-type associated
with three major NE-SW oriented shear zones. Recent work by Alpha has included continuous 1-m long
sub-surface channel and trench sampling (See press releases on 4
th
November 2021 and 10
th
February
2022). Results have defined six prospective sub-areas namely: Hill 52, Saddle Workings, Channel 12
NE, Celebration Hill, Pad 2 and Aburna Central - (see Map 1 below). In addition, consultant structural
Geologist Dr. Ghislain Tourigny has completed detailed geological mapping of these areas.
Map 1 Aburna Gold Prospect
To view an enhanced version of Map 1, please visit:
https://orders.newsfilecorp.com/files/8361/122570_79d7f1f664bdbb38_001full.jpg
Notes
Sampling, Sub-sampling and Analysis
Geological consultants from RSC were responsible for the design of a strict QA/QC program consistent
with industry best practice. Drilling was by reverse-circulation. Samples were split at the rig using a
Metzke splitter, before being transported to a secure location for logging.
All samples were submitted to Nabro Laboratories Limited (Nabro), Asmara, Eritrea, for sample
preparation. Samples were crushed (to 90% passing 2.8 mm) and pulverised (to 85% passing 75 µm).
Two scoop samples were taken from the pulveriser bowl: approximately 120 g for laboratory analysis
and approximately 100 g for portable X-ray fluorescence (pXRF) analysis. The coarse and pulp rejects
were stored at a warehouse in Asmara. The Company inserted certified reference material from OREAS
(
www.ore.com.au
) into the sample stream, while Nabro inserted barren granodiorite material into the
sample stream as a blank.
Drill samples were shipped to ALS Geochemistry (ALS), Loughrea, Ireland, for analysis. ALS analyzed
all drill samples for gold by method Au-AA26 (50 g charge fire assay, AAS finish). ALS is independent of
the Company and its quality management systems framework is accredited to ISO/IEC 17025:2005 or
certified to ISO 9001:2015 standards.
Table 2 Drill Collar Data
Prospect
Hole
Type
East
(UTM)
North
(UTM)
RL
Azimuth
(°)
DIP
(°)
Started
Ended
Depth
(m)
Aburna
ABR001
RC
340821
1651448
920
315
-50
2/26/2022
2/26/2022
78
Aburna
ABR002
RC
340852
1651421
942
315
-50
2/27/2022
2/27/2022
108
Aburna
ABR003
RC
340875
1651392
937
315
-50
2/28/2022
2/28/2022
150
Aburna
ABR004
RC
340904
1651359
946
315
-50
1/3/2022
1/3/2022
84
Aburna
ABR005
RC
340873
1651265
965
315
-50
3/2/2022
3/4/2022
222
Aburna
ABR006
RC
340878
1651331
931
315
-50
3/4/2022
3/5/2022
180
Aburna
ABR007
RC
340826
1651328
941
315
-50
3/6/2022
3/6/2022
90
Aburna
ABR008
RC
341631
1650633
930
315
-50
3/7/2022
3/8/2022
102
Aburna
ABR009
RC
341546
1650555
948
315
-50
3/8/2022
3/8/2022
72
Aburna
ABR010
RC
341504
1650476
958
315
-50
3/9/2022
3/9/2022
78
Aburna
ABR011
RC
341388
1650261
950
315
-50
3/9/2022
3/10/2022
84
Aburna
ABR012
RC
341221
1650082
944
315
-50
3/10/2022
3/10/2022
78
Aburna
ABR013
RC
340406
1649981
981
315
-50
3/11/2022
3/11/2022
60
Aburna
ABR014
RC
340406
1649981
981
315
-70
3/11/2022
3/12/2022
84
Aburna
ABR015
RC
341571
1651533
936
315
-50
3/14/2022
3/14/2022
114
Aburna
ABR016
RC
340850
1651234
950
315
-50
3/15/2022
3/16/2022
186
Aburna
ABR017
RC
340823
1651264
945
315
-50
3/16/2000
3/17/2022
100
Aburna
ABR018
RC
340906
1651240
965
315
-50
3/18/2022
3/18/2022
70
Aburna
ABR019
RC
341756
1651866
943
315
-50
3/18/2022
3/18/2022
60
Total
2,000
About Alpha
Alpha is an exploration company listed on the TSX-V exchange under the symbol ALEX that has made 3
important discoveries in 2 years at it's Kerkasha Project in Eritrea:
Anagulu porphyry gold-copper
Tolegimja volcanogenic-massive-sulphide (VMS)
Aburna orogenic gold
The company is managed by a group of highly experienced and successful professionals with many
years of experience carrying out exploration and resource development programs in Eritrea and Sudan
and is focused on the discovery of world class economic gold and base metals deposits in the highly
prospective Arabian-Nubian shield, on either side of the Red Sea. Alpha currently holds a 100% interest
in the large (771 km
2
) Kerkasha Exploration License in southwest Eritrea, located 135 km west-
southwest of the capital city of Asmara. Since acquiring the property in January 2018, the company has
spent approximately CAD$12 million on exploration and identified 17 in prospects of which six have
been drilled to date.
For further information go to the Alpha webpage at
www.alpha-exploration.com
or contact:
Michael Hopley
President and Chief Executive Officer
Alpha Exploration Ltd.
Email:
Tel: +44 207129 1148
Qualified Person
All scientific and technical information in this press release, including the results of the Aburna drill
program and how these results relate to the ongoing exploration at the Kerkasha Project has been
reviewed, verified, and approved by Michael Hopley, President, Chief Executive Officer of Alpha and a
"qualified person" for the purposes of national Instrument 43-101 -
Standards of Disclosure for Mineral
Projects.
Cautionary Notes
This press release is intended for distribution in Canada only and is not intended for
distribution to United States newswire services or dissemination in the United States.
Forward-Looking Statements
Certain statements and information herein, including all statements that are not historical facts,
contain forward-looking statements and forward-looking information within the meaning of applicable
securities laws. Such forward-looking statements or information include but are not limited to
statements or information with respect to: future dataset interpretations, sampling, plans for its projects
(including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling
program. Often, but not always, forward-looking statements or information can be identified by the use
of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may"
or "should" and the negative of these words or such variations thereon or comparable terminology are
intended to identify forward-looking statements and information. With respect to forward-looking
statements and information contained herein, Alpha has made numerous assumptions including
among other things, assumptions about general business and economic conditions and the price of
gold and other minerals. The foregoing list of assumptions is not exhaustive.
Although management of Alpha believes that the assumptions made and the expectations
represented by such statements or information are reasonable, there can be no assurance that
forward-looking statements or information herein will prove to be accurate. Forward-looking statements
and information by their nature are based on assumptions and involve known and unknown risks,
uncertainties and other factors which may cause actual results, performance or achievements, or
industry results, to be materially different from any future results, performance or achievements
expressed or implied by such forward-looking statements or information. These factors include, but
are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha
given its limited operating history; business and economic conditions in the mining industry generally;
the supply and demand for labour and other project inputs; changes in commodity prices; changes in
interest and currency exchange rates; risks relating to inaccurate geological and engineering
assumptions (including with respect to the tonnage, grade and recoverability of reserves and
resources); risks relating to unanticipated operational difficulties (including failure of equipment or
processes to operate in accordance with specifications or expectations, cost escalation, unavailability
of materials and equipment, government action or delays in the receipt of government approvals,
industrial disturbances or other job action, and unanticipated events related to health, safety and
environmental matters); risks relating to adverse weather conditions; political risk and social unrest;
changes in general economic conditions or conditions in the financial markets; changes in laws
(including regulations respecting mining concessions); risks related to the direct and indirect impact
of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to
obtain financing as required, and causing potential delays to exploration activities; those factors
discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed
from time to time. Alpha does not undertake to update any forward-looking information, except in
accordance with applicable securities laws.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/122570