Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ALEX.V ·

Alpha Exploration Announces Final Assay

Drill Results

Alpha Exploration Announces Final Assay

Results Including 5m @ 11.03 g/t Gold at

Aburna

Calgary, Alberta--(Newsfile Corp. - April 26, 2024) -

Alpha Exploration Ltd.

(TSXV: ALEX) ("

Alpha

" or

the "

Company

") announces final results from the first phase of its 2024 drilling program on its Aburna

Gold Prospect ("

Aburna

") on the Company's 100% owned, 771 km² Kerkasha Project located in

Eritrea. Drilling consists of both reverse-circulation ("RC") drilling and diamond core ("DC") drilling.

Final assays have now been received for the remaining 16 drillholes drilled at Aburna in Q1 2024 and

including 5 holes from Hill 52, 5 drillholes from Central Area with a further 6 drillholes at Northeast Area.

All drillholes except for DD holes ABD014, ABD015 and ABD016 were drilled as diamond tail

extensions to existing RC drillholes completed earlier in March this year, and were designed to test

mineralization down plunge of the current mineralized lenses at all three prospects. Additional drilling

results reported in this first phase program area available here:

https://alpha-exploration.com/wp-

content/uploads/2024/03/News-Release-Alpha_Drilling-Results-01-March-2024.pdf

, and

https://alpha-

exploration.com/alpha-exploration-annouces-more-positive-drilling-results-from-aburna/

.

HIGHLIGHTS:

Drillhole ABRD113: 5m @ 11.03 g/t Au (Northeast Area)

Drillhole ABRD118: 4m @ 5.94 g/t Au (Central Area)

Drillhole ABRD105: 22m @ 1.71 g/t Au (Central Area)

Drillhole ABRD104: 18m @ 1.17 g/t Au (Central Area)

First phase 6,247m drilling program now complete

Alpha has now completed the first phase of a planned 20,000m, 2024 drilling program at Aburna.

Drillhole ABRD113 was designed to test the main Northeast Area mineralized shoot at depth and

successfully intercepted the high-grade lens including 5m @ 11.03 g/t Au. The width and grade of the

intercept are consistent with the rest of the Northeast Area footwall shoot that includes prior drillholes

ABR037 16m @ 14.07 g/t Au and ABR078 (9m @ 5.99 g/t Au). Drillhole ABRD118 was designed to

test down dip potential at Central Area and successfully intercepted 4m @ 5.96 g/t Au, extending known

mineralization down dip.

Aburna is a major, district scale orogenic gold prospect covering an area of at least 7km long and 2km

wide and is one of the three significant discoveries made by Alpha on the Kerkasha licence in the last

three years. Exploration to date by Alpha on the project has defined six primary areas of interest at

Aburna, and has established significant high-grade gold mineralized systems at Central Area, Hill 52

and Northeast Area (see Figure 1, below).

Michael Hopley, Alpha President & CEO said,

"We are pleased to report further positive results

from the first phase of our 2024 drilling program at Aburna. In particular, drillhole ABD113 in

Northeast Area has further confirmed the plunging high grade mineralized orientation at

Aburna, extending the principal shoot down plunge.

Following receipt and interpretation of all assays now from this first phase program, and the

successful conclusion of C$7m financing, where Alpha in aggregate raised C$6.85m

(

https://alpha-exploration.com/alpha-news-release-re-closing-of-unit-pp-april-2024/

), the

Company is now well funded to accelerate exploration on the Aburna Gold Prospect as well at

the other principal projects on our licence. We look forward to updating shareholders on our

next work programs on Aburna in due course."

Completion of First Phase 2024 Drill Program

The Company commenced the first phase drill program in December 2023. To date, 33 drillholes for

6,247 metres have been drilled at Central Area (13 drillholes), Hill 52 (11 drillholes) and Northeast Area

(9 drillholes). Further assay results have been received from 16 of these 33 drillholes. A full table of

significant intercepts from assay results received to date is available in Table 1, below.

Table 1: Significant drilling intercepts from assays received

Hole ID

Sub Prospect

Intersection Depth

Interval

from (m)

to (m)

ABD014

Hill 52

49

52

3m @ 4.33 g/t Au

ABD015

Hill 52

83

89

6m @ 0.37 g/t Au

and

118

125

7m @ 0.62 g/t Au

and

137

141

4m @ 2.31 g/t Au

including

140

141

1m @ 7.99 g/t Au

and

167

171

4m @ 0.79 g/t Au

ABD016

Hill 52

89

92

3m @ 0.38 g/t Au

and

145

146

1m @1.05 g/t Au

and

149

152

3m @ 1.09 g/t Au

and

196

199

3m @ 0.48 g/t Au

and

235

236

1m @ 2.6 g/t Au

ABRD104

Central

133

136

3m @ 1.14 g/t Au

and

139

143

4m @ 0.58 g/t Au

and

146

164

18m @ 1.17 g/t Au

ABRD105

Central

139

161

22m @ 1.71 g/t Au

ABRD107

Central

175

176

1m @ 1.59 g/t Au

ABRD110

Northeast

166

167

1m @ 1.96 g/t Au

and

176

183

7m @ 2.06 g/t Au

ABRD111

Northeast

151

156

5m @ 0.57 g/t Au

and

159

162

3m @ 0.67 g/t Au

and

182

185

3m @ 0.91 g/t Au

and

189

190

1m @ 1.31 g/t Au

and

239

241

2m @ 2.69 g/t Au

and

258

262

4m @ 0.54 g/t Au

ABRD112

Northeast

156

157

1m @ 1.36 g/t Au

and

169

170

1m @ 1.19 g/t Au

and

231

236

5m @ 1.34 g/t Au

and

243

244

1m @ 1.78 g/t Au

ABRD113

Northeast

150

151

1m @ 1.05 g/t Au

and

157

158

!m @ 2.57 g/t Au

and

174

179

5m @11.03 g/t Au

ABRD116

Northeast

138

151

13m @ 0.67 g/t Au

including

138

139

1m @ 4.55 g/t Au

and

180

181

1m @ 1.19 g/t Au

and

253

259

6m @ 0.46 g/t Au

and

264

268

4m @ 0.97 g/t Au

ABRD118

Northeast

157

161

4m @ 5.94 g/t Au

including

159

160

1m @ 22.6 g/t Au

and

166

167

1m @ 1.10 g/t Au

ABRD120

Central

No significant return

ABRD121

Central

No significant return

ABRD122

Hill 52

174

190

16m @ 0.70 g/t Au

including

174

177

3m @ 2.69 g/t Au

and

231

237

6m @ 0.27 g/t Au

and

245

246

1m @ 1.2 g/t Au

ABRD123

Hill 52

175

176

1m @ 5.99 g/t Au

and

217

219

2m @ 6.65 g/t Au

and

224

225

1m @ 1.53 g/t Au

A significant interval is defined by consecutive one-meter intervals starting and ending at 0.20 g/t Au or better. A significant interval must be at

least 3m long. Internal dilution is limited to 2 consecutive intervals of <0.20 g/t Au. Multiple internal dilutions are allowed. Single one-meter

intervals of 1.00 g/t Au or greater are also considered significant. At this early stage of exploration, the true widths of intersections is not known

but is estimated to be at least 80% of the reported intervals.

Figure 1: Location of drilling at Aburna and principal targets defined to date

(drillholes from the 2024 first phase program are shown in yellow)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8361/206951_b147e8c9642a0ad6_001full.jpg

Sampling, Sub-sampling and Analysis

Alpha engaged an independent Consultancy, RSC Mining & Mineral Exploration (RSC) to develop a

Standard Operating Procedure ("SOP") for both RC and DD drill samples in June 2021 and all samples

in this release use this RSC SOP. The RSC SOP utilizes blank standards and industry standards that

are inserted at the beginning and end of every batch (and every 20 samples within the batch) for all

batches submitted to ALS Geochemistry, Loughrea, Ireland, ("ALS"), for assay. Additionally, field

replicates are taken at a frequency of about 1 in 5 (20%) through mineralized areas.

One-meter samples from both RC and DD drilling were crushed (to >90% passing 2.0 mm) and

pulverised (to >85% passing 75 µm). Two scoop samples were taken from the pulveriser bowl:

approximately 130g for laboratory analysis and approximately 150g for portable X-ray fluorescence

(pXRF) analysis. The coarse and pulp rejects were stored at Alpha's warehouse in Asmara. The

Company inserted certified reference material from OREAS (

www.ore.com.au

) into the sample stream,

while NABRO Laboratories Limited in Asmara inserted barren granodiorite material into the sample

stream as a blank. Samples were shipped to ALS for analysis. ALS analysed all drill samples for gold by

method Au-AA26 (50 g charge fire assay, AAS finish). ALS is independent of the Company and its

quality management systems framework is accredited to ISO/IEC 17025:2005 or certified to ISO

9001:2015 standards.

About Alpha

Alpha (TSXV: ALEX) is an exploration company that is rapidly advancing a number of important gold

and base metal discoveries across its 100% owned, large (771 km2) Kerkasha Project in Eritrea.

The Aburna Gold Prospect is an exciting new gold discovery where recent drilling has established a

high-grade discovery with grades including 18m @ 15.33 g/t Au, 16 m @ 14.07 g/t Au, 9 m @ 10 g/t Au

and 23 m @ 6.74 g/t Au. The Anagulu Gold-Copper Prospect includes recent drilling intersections of 108

m @ 1.24 g/t Au and 0.60% Cu and 49 m @ 2.42 g/t Au and 1.10% Cu within a porphyry unit mapped

over at a >2 km strike length.

The Company is also advancing exploration of the Tolegimja volcanogenic

massive sulphide copper-zinc-gold prospect and over 17 other gold and base metal prospects since

listing in 2021.

The Company is managed by a group of highly experienced and successful professionals with long track

records of establishing, building and successfully exiting a number of world class gold and base metals

discoveries in Eritrea and across the wider Arabian Nubian Shield.

For further information go to the Alpha webpage at

www.alpha-exploration.com

or contact:

Michael Hopley

President and Chief Executive Officer

Alpha Exploration Ltd.

Email:

[email protected]

Tel: +44 207129 1148

Qualified Person

All scientific and technical information in this press release, including the results of the Aburna drill

program and how these results relate to the ongoing exploration at the Kerkasha Project has been

reviewed, verified, and approved by Michael Hopley, President, Chief Executive Officer of Alpha and a

"qualified person" for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral

Projects.

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to

United States newswire services or dissemination in the United States.

Forward Looking Statements

Certain statements and information herein, including all statements that are not historical facts,

contain forward-looking statements and forward-looking information within the meaning of applicable

securities laws. Such forward-looking statements or information include but are not limited to

statements or information with respect to future dataset interpretations, sampling, plans for its projects

(including the Anagulu prospect), surveys related to Alpha's assets, and the Company's drilling

program. Often, but not always, forward-looking statements or information can be identified by the use

of words such as "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may"

or "should" and the negative of these words or such variations thereon or comparable terminology are

intended to identify forward-looking statements and information. With respect to forward-looking

statements and information contained herein, Alpha has made numerous assumptions including

among other things, assumptions about general business and economic conditions and the price of

gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations

represented by such statements or information are reasonable, there can be no assurance that

forward-looking statements or information herein will prove to be accurate. Forward-looking statements

and information by their nature are based on assumptions and involve known and unknown risks,

uncertainties and other factors which may cause actual results, performance or achievements, or

industry results, to be materially different from any future results, performance or achievements

expressed or implied by such forward-looking statements or information. These factors include, but

are not limited to: risks relating to Alpha's financing efforts; risks associated with the business of Alpha

given its limited operating history; business and economic conditions in the mining industry generally;

the supply and demand for labour and other project inputs; changes in commodity prices; changes in

interest and currency exchange rates; risks relating to inaccurate geological and engineering

assumptions (including with respect to the tonnage, grade and recoverability of reserves and

resources); risks relating to unanticipated operational difficulties (including failure of equipment or

processes to operate in accordance with specifications or expectations, cost escalation, unavailability

of materials and equipment, government action or delays in the receipt of government approvals,

industrial disturbances or other job action, and unanticipated events related to health, safety and

environmental matters); risks relating to adverse weather conditions; political risk and social unrest;

changes in general economic conditions or conditions in the financial markets; changes in laws

(including regulations respecting mining concessions); risks related to the direct and indirect impact

of COVID-19 including, but not limited to, its impact on general economic conditions, the ability to

obtain financing as required, and causing potential delays to exploration activities; those factors

discussed under the heading "Risk Factors" in the Final Prospectus; and other risk factors as detailed

from time to time. Alpha does not undertake to update any forward-looking information, except in

accordance with applicable securities laws.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/206951