Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ALEX.V ·

ALPHA EXPLORATION announces final 2024 drilling results at Aburna Gold and Anagulu Gold- Copper prospects and updates exploration plans for 2025

Drill Results

1

ALPHA EXPLORATION announces final 2024 drilling results at Aburna Gold and Anagulu Gold-

Copper prospects and updates exploration plans for 2025

March 21st 2025 – Alpha Exploration Ltd. (“Alpha” or the “Company”) (TSXV: ALEX) announces the

final results from drilling during 2024 and also provides an update on current and planned exploration

activities on its wholly owned Kerkasha license in Eritrea.

HIGHLIGHTS:

• AND010 returned 40m @ 0.29% Cu with 0.18 g/t Au including 4m @ 1.42% Cu with 0.83 g/t

Au in typical PCD veining and mineralization,

• AND011 returned 11m @0.15% Cu with 0.08 g/t Au, 21m @ 0.18% Cu with 0.095 g/t Au and

11m @ 0.21% Cu with 0.082 g/t Au in typical PCD veining and mineralization.

The new drilling results are from four areas; the Central, Dasharna and Obokochima prospects at the

Aburna orogenic gold prosect, and separately from Anagulu, a copper-gold porphyry prospect, where

two of four drillholes returned impressive results akin to Alpha’s initial discovery hole AND001 (see

highlights, above).

Alpha is also pleased to announce that the Kerkasha license has been renewed, under the terms of the

Eritrean Mining Law, with a 25% relinquishment. The resultant license covers 514 Km2.

Activities during the first quarter of 2025 (Q1 2025) have focused on continued exploration at Aburna

and Anagulu. Alpha’s main focus for 2025 will continue to be the Aburna orogenic gold system, with a

view to undertake sufficient drilling to outline a maiden mineral resource by early 2026. At Anagulu,

further drilling will take place to define the extents of the porphyry system.

Final drilling results from 2024 drilling program.

Figure 1 shows the location of the drilling reported in this release , and the current Rotary Air Blast

(RAB) drilling at Aburna (see later in this release)

Anagulu Prospect

At Anagulu, Alpha’s porphyry copper-gold prospect, four shallow scout holes were drilled over a 5km

strike length, to test a sheared/deformed cupola concept. The drilling targeted hydrothermal surface

features marked by elevated copper in soil anomalies. Drillholes AND010 and AND011, drilled on the

same section (see Figure 3) returned broad copper mineralization with associated gold values. Copper

is defined by Portable X Ray Fluorescence (pXRF) and followed up with multi -element analysis, gold

defined by fire assay analysis. The geochemistry results also showed elevated molybdenum (up to

500ppm), silver (up to 9ppm),tellurium (up to 5ppm) and tungsten (up to 350ppm) which may indicate

both the high grade copper stockwork core and the outer alteration shells of a typical porphyry system

are present at the southern end of the Anagulu system. The results are summarized in Table 1, a cross

section showing AND010 and AND01 1 is presented below (Figure 2). Structural measurements at

lithologic boundaries are vertical, and this may support the deformed cupola concept.

2

Figure 1: Location of recently received assay results from the Q2 2024 drilling program and new soil

geochemistry results marked by magenta circles. Proposed RAB drilling shown in red.

3

Figure 2: Cross section through AND010 and AND011 at the Anagulu porphyry prospect.

Table 1: Significant intervals from the Q2 2024 drilling at Anagulu.

Aburna - Dasharna Prospect

Seven diamond drillholes drilled during Q2-2024 targeted a strong gold soil anomaly in the Dasharna

prospect of Aburna . These delivered weak results from two narrow high -grade veins (see Table 2

below).

4

Table 2: Significant intervals from seven holes drilled at the Dasharna prospect.

Drillhole

ID

Significant Interval From

(m)

To (m) Notes Prospect

ABD017 2m @ 4.62 g/t Au 0 2 Narrow high-grade veins Dasharna

and 1m @ 6.09 g/t Au 7 8 Narrow high-grade veins Dasharna

and 1m @ 1.24 g/t Au 57 58 Dasharna

ABD018 No significant Intervals - - Dasharna

ABD019 No significant Intervals - - Dasharna

ABD020 No significant Intervals - - Dasharna

ABD021 No significant Intervals - - Dasharna

ABD022 2m @ 2.70 g/t Au 13 15 Narrow high-grade veins Dasharna

and 2m @ 0.77 g/t Au 58 60 Dasharna

ABD023 No significant Intervals - - Dasharna

Significant intervals are determined to be >3m wide zones beginning and ending with 0.2 g/t Au or greater with

internal dilution of no more than 2m. A narrower interval is also determined to be significant if over 1.0 g/t Au.

Aburna - Central Prospect

Results for four diamond-tail hole and three diamond-tail extensions of previously reported Reverse

Circulation (RC) holes at Aburna’s Central prospect were also returned. The significant intervals are

presented in Table 3, below.

Table 3: Significant intervals from earlier reported RC collar holes at Aburna’s Central prospect.

Drillhole ID Significant Interval From

(m) To (m) Notes Prospect

ABRD023 3m @ 0.55 g/t Au 33 36 Central

and 13m @ 0.77 g/t Au 53 66 Central

and 9m @ 1.38 g/t Au 71 80 Central

Diamond

tail 3m @ 0.86 g/t Au 137 140 Central

ABRD136 2m @ 1.03 g/t Au 51 53 Central

and 6m @ 2.29 g/t Au 116 122 Central

and 9m @ 0.33 g/t Au 128 137 Central

and 3m @ 1.59 g/t Au 145 148 Central

Diamond

tail 2m @ 0.48 g/t Au 179 181 Central

Diamond

tail 2m @ 0.48 g/t Au 206 208 Central

ABRD137 6m @ 0.34 g/t Au 19 25 Central

and 4m @ 0.23 g/t Au 33 37 Central

and 3m @ 0.48 g/t Au 96 99 Central

and 4m @ 0.71 g/t Au 128 132 Central

Diamond

tail 1m @ 2.25 g/t Au 171 172 Central

Diamond

tail 3m @ 0.21 g/t Au 185 188 Central

ABRD138 3m @ 0.18 g/t Au 8 11 Central

and 1m @ 1.10 g/t Au 40 41 Central

and 2m @ 0.56 g/t Au 104 106 Central

and 5m @ 1.47 g/t Au 124 129 Central

and 4m @ 0.49 g/t Au 135 139 Central

and 5m @ 0.30 g/t Au 142 147 Central

Diamond

tail 7m @ 0.44 g/t Au 189 196 Central

*The blue intervals were previously reported.

5

Aburna - Obokochima Prospect

Also at Aburna, a new prospect, named Obokochima, was soil sampled for 500m along strike. This

followed up on a single scout RC drillhole completed during in Q2 2024 (ABR159) which returned

intersections of: 14m @ 0.47 g/t Au and 5m @ 0.74 g/t Au (14th November 2024 Press Release). The

results from 294 soil samples were returned with 10 assaying >0.25g/t Au and 15 assaying >0.1g/t

Au. The soil anomalism is open to the northeast and southwest (see Figure 3, below). Malachite

staining is seen at several locations indicating the presence of copper. Alpha will consider follow-up

drilling in 2025.

Figure 3: A satellite image of the Obokochima prospect at Aburna, Gold soil sampling results are plotted along with the

single scout RC hole drilled in the area.

Current Exploration Activities

Aburna Project Area

A Rotary Air Blast (RAB) drilling program was initiated during Q1 2025 on the Aburna project. This

targets an area of recent cover between the Central and Northeast prospects and is being undertaken

on a 40m x 40m grid, with an expected total of 744 holes (Figure 1). Samples will be collected from the

bedrock contact zone and will be sieved to <75um and submitted for fire assay, The results will be used

to develop further targets in the gap zone between Central and Northeast prospects.

Exploration Plans for 2025

Alpha’s main focus for 2025 will continue to be the Aburna orogenic gold system, with a view to

completing sufficient drilling to outline a maiden mineral resource by early 2026. The current RAB

drilling program will be completed in Q2 2025 with results expected from Q2 2025. Follow up RAB

programs will be planned over other areas of thick cover in order to expand the gold geochemistry

coverage across the Aburna project area prior to further RC & DD drilling expected in Q3, 2025.

6

At Anagulu, there will be ongoing fertility analysis of the host units and surrounding porphyry and

intrusive units, which is being undertaken on Alpha’s behalf by a major, diversified mining company.

Drilling in the immediate vicinity of Anagulu will also be undertaken in order to define the extents of

the porphyry system.

Quality Control (QC)

As reported in Alpha’s News Release of November 14 2024, some irregularities were identified relating

to the analysis of coarse blank samples from four RC drillholes. To resolve the issue, Alpha submitted

duplicates of the original blank samples for analysis at ALS, Loughrea, Ireland. These returned results

of <0.01 ppm Au. The results indicate that the sample preparation in Asmara was acceptable and the

issue occurred at the assay laboratory. The affected samples have been flagged in Alpha’s database

and appropriate measures will be applied should the intersections concerned be used for a future

mineral r esource estimation. Alpha believes this is an isolated event which does not impact the

integrity of the Company’s database.

Sampling, Sub-sampling and Analysis

Alpha engaged an independent Consultancy, RSC Mining & Mineral Exploration (RSC) to develop a

Standard Operating Procedure (“SOP”) for both RC and DD drill samples in June 2021 and all samples

in this release use this RSC SOP . The RSC SOP utilizes blank standards and industry standards that are

inserted at the beginning and end of every batch (and every 20 samples within the batch) for all

batches submitted to ALS for assay. Additionally, field replicates are taken at a frequency of

approximately 1 in 5 (20%) through mineralized areas.

One-meter samples from both RC and DD drilling were crushed (to >90% passing 2.0 mm) and

pulverized (to >85% passing 75 μm). Two scoop samples were taken from the pulveri ser bowl:

approximately 130g for laboratory analysis and approximately 150g for portable X -ray fluorescence

(pXRF) analysis. The coarse and pulp rejects were stored at Alpha’s warehouse in Asmara. The

Company inserted certified reference material from OREAS (www.ore.com.au) into the sample stream,

while the Nabro sample preparation facility inserted barren granodiorite material into the sample

stream as a blank. Samples were shipped to ALS Geochemistry (ALS), Loughrea, Ireland, for analysis.

ALS analyzed all drill samples for gold by method Au -AA26 (50 g charge fire assay, AAS finish). ALS is

independent of the Company and its quality management systems framework is accredited to ISO/IEC

17025:2005 or certified to ISO 9001:2015 standards.

About Alpha

Alpha (TSX-V: ALEX) is an exploration company that is rapidly advancing a number of important gold

and base metal discoveries across its 100% owned, 513 km2 Kerkasha Project in Eritrea.

The Aburna Gold Prospect is an exciting new gold discovery where recent drilling has confirmed a high-

grade mineralized system, with grades including 18m @ 15.33 g/t Au, 16 m @ 14.07 g/t Au, 9 m @ 10

g/t Au and 23 m @ 6.74 g/t Au.

The Anagulu Gold-Copper Prospect includes recent drilling intersections of 108 m @ 1.24 g/t Au and

0.60% Cu and 49 m @ 2.42 g/t Au and 1.10% Cu within a porphyry unit mapped over at a >2 km strike

length.

The Company is managed by a group of highly experienced and successful mining and exploration

professionals with long track records of establishing, building and successfully exiting a number of

world class gold and base metal discoveries in Eritrea and across the wider Arabian Nubian Shield.

7

For further information go to the Alpha webpage at www.alpha-exploration.com or contact:

Tim Livesey

Interim Chief Executive Officer

Alpha Exploration Ltd.

Email: [email protected]

Tel: +44 207129 1148

Qualified Person

All scientific and technical information in this press release, including the results of the Aburna drill

program and how these results relate to the ongoing exploration at the Kerkasha Project has been

reviewed, verified, and approved by Chris Bargmann CGeol FGS, consultant for Alpha and a “qualified

person” for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

Cautionary Notes

This press release is intended for distribution in Canada only and is not intended for distribution to

United States newswire services or dissemination in the United States.

Forward Looking Statements

Certain statements and information herein, including all statements that are not historical facts,

contain forward-looking statements and forward-looking information within the meaning of applicable

securities laws. Such forward -looking statements or infor mation include but are not limited to

statements or information with respect to future dataset interpretations, sampling, plans for its

projects (including the Anagulu prospect), surveys related to Alpha’s assets, and the Company’s drilling

program. Often, but not always, forward -looking statements or information can be identified by the

use of words such as “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”,

“may” or “should” and the negative of these words or such variati ons thereon or comparable

terminology are intended to identify forward -looking statements and information. With respect to

forward-looking statements and information contained herein, Alpha has made numerous

assumptions including among other things, assump tions about general business and economic

conditions and the price of gold and other minerals. The foregoing list of assumptions is not exhaustive.

Although management of Alpha believes that the assumptions made and the expectations represented

by such statements or information are reasonable, there can be no assurance that forward -looking

statements or information herein will prove to be accurate. Fo rward-looking statements and

information by their nature are based on assumptions and involve known and unknown risks,

uncertainties and other factors which may cause actual results, performance or achievements, or

industry results, to be materially differ ent from any future results, performance or achievements

expressed or implied by such forward-looking statements or information. These factors include, but are

not limited to: risks relating to Alpha’s financing efforts; risks associated with the business of Alpha

given its limited operating history; business and economic conditions in the mining industry generally;

the supply and demand for labour and other project inputs; changes in commodity prices; changes in

interest and currency exchange rates; risks relating to inaccurate geological and engineering

assumptions (including with respect to the tonnage, grade and recoverability of reserves and

resources); risks relating to unanticipated operational difficulties (including failure of equipment or

processes to operate in accordance with specifications or expectations, cost escalation, unavailability

8

of materials and equipment, government action or delays in the receipt of government approvals,

industrial disturbances or other job action, and unanticipated events related to health, safety and

environmental matters); risks relating to adverse weather co nditions; political risk and social unrest;

changes in general economic conditions or conditions in the financial markets; changes in laws

(including regulations respecting mining concessions); risks related to the direct and indirect impact of

COVID-19 including, but not limited to, its impact on general economic conditions, the ability to obtain

financing as required, and causing potential delays to exploration activities; those factors discussed

under the heading “Risk Factors” in the Final Prospectus; a nd other risk factors as detailed from time

to time. Alpha does not undertake to update any forward -looking information, except in accordance

with applicable securities laws.