Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ALDE.V ·

Aldebaran Intercepts 919.55 m of 0.66% CuEq, within 1,517.00 m of 0.55% CuEq

Drill Results

NEWS RELEASE

Aldebaran Intercepts 919.55 m of 0.66% CuEq, within 1,517.00 m of 0.55% CuEq

VANCOUVER, CANADA (June 17, 2024) – Aldebaran Resources Inc. (“Aldebaran” or the “Company”) (TSX-

V: ALDE, OTCQX: ADBRF) is pleased to report results for three drill holes from the 2023/2024 field campaign at

the Altar copper-gold project in San Juan, Argentina. All three holes intercepted significant mineralization and

expanded the mineralized footprint, with ALD -24-243 intercepting one of the longest contiguous runs of

mineralization encountered on the property to date. All three holes will provide valuable information for the upcoming

mineral resource estimate, scheduled for H2 2024.

Highlights

ALD-24-243

• 1,517.00 m of 0.55% CuEq from 325.00 m depth

o Including 919.55 m of 0.66% CuEq from 527.00 m depth

§ Including 227.00 m of 0.79% CuEq from 930.00 m depth

• Extends the mineralized Altar United porphyry to the North, well beyond previous interpretations

• Hole ended in mineralization

ALD-24-129EXT

• 1,047.00 m of 0.38% CuEq from 164.00 m depth

o Including 116.30 m of 0.56% CuEq from 713.00 m depth

• Fills in a gap in the drilling for the upcoming mineral resource update

• Hole ended in mineralization

• Extension of historic hole that was originally terminated at 513.00 m depth

ALD-24-165EXT

• 986.00 m of 0.29% CuEq

o Including 333.50 m of 0.41% CuEq from 633.00 m depth

§ Including 109.10 m of 0.60% CuEq from 851.00 m depth

• Fills in a gap in the drilling for the upcoming mineral resource update

• Hole ended in mineralization

• Extension of historic hole that was originally terminated at 484.50 m depth

John Black, Chief Executive Officer of Aldebaran, commented: “Intercepting more than 1.5 km of continuous

attractive grade mineralization in ALD-243 is a testament to the size and scale of the Altar project. This project is

already very large, but with each additional drill hole, we grow the mineralized footprint. Since our last resource

estimate in 2021, we’ve completed more than 60,000 m of drilling on the project and we’re very excited to see how

much the overall mineral resource estimate will grow when we complete a resource update in H2 of this year.”

Dr. Kevin B. Heather, Chief Geological Officer of Aldebaran, commented: “The 2023-2024 drill campaign

continues to deliver exceptional results in terms of long runs of higher-grade mineralization and extending the known

mineralized footprint. Although hole ALD-243 deviated significantly from one of its intended objectives, the hole was

continued based on good visuals of the mineralization in the core and the need to push our geological understanding

further to the north, which the hole successfully did. Interestingly, ALD-243 extended our projection of the Altar

United porphyry to the North well beyond our previous interpretation, which is important as the porphyry unit tends

to host higher-grade mineralization. All three holes released today add significant extensions to the known

mineralization and will support the upcoming mineral resource estimate.”

Table 1 below shows detailed assays for all holes. Figure 1 displays a plan map of the completed and ongoing drill

hole locations. Figure 2 is a close-up plan view map showing the deviation of hole ALD-24-243 relative to previously

drilled holes, while Figures 3, 4, and 5 display cross-sections of the holes reported herein.

Table 1 - Drill Hole Results – Altar Project

From

(m)

To

(m)

Interval

(m)

Cu

(%)

Au

(g/t)

Ag

(g/t)

Mo

(ppm)

As

(ppm)

CuEq

(%)

ALD-24-243 - (Total depth 1,842.00 m)

Interval 325.00 1,842.00 1,517.00 0.49 0.03 2.07 174 181 0.55

Incl. 527.00 1,446.55 919.55 0.59 0.04 2.40 196 222 0.66

Incl. 930.00 1,157.00 227.00 0.73 0.03 4.18 165 295 0.79

And 1,649.00 1,698.58 49.58 0.56 0.03 2.71 226 79 0.63

ALD-24-129EXT - (Total depth 1,211.00 m)

Interval* 164.00 1,211.00 1,047.00 0.35 0.03 1.39 30 233 0.38

Incl.* 298.00 342.00 44.00 0.49 0.05 1.45 24 177 0.52

And 713.00 829.30 116.30 0.52 0.05 1.88 39 217 0.56

ALD-24-165EXT - (Total depth 1,208.00 m)

Interval* 222.00 1,208.00 986.00 0.26 0.04 0.91 28 246 0.29

Incl.* 633.00 966.50 333.50 0.38 0.05 0.56 22 124 0.41

Incl. 851.00 960.10 109.10 0.58 0.05 0.82 27 238 0.60

The grades are uncut. CuEq values were calculated using copper, gold, silver, and molybdenum. Metal prices utilized for the calculations are Cu =

US$3.00/lb, Au = US$1,400/oz, Ag = US$18/oz, and Mo = US$10/lb. Recoveries used for the supporting metals found in the CuEq equation are

as follows: Au = 50%, Ag = 51%, (based on historical metallurgical test work) and Mo = 70% (benchmarking from similar deposits). The formula

utilized to calculate equivalent values is CuEq % = Cu % + (Au g/t * 0.34025) + (Ag g/t * 0.00446) + (Mo ppm * 0.00023).

* Indicates a portion or all the interval comes from historic drill results

Discussion of Results

ALD-24-243

ALD-24-243 (Figure 2) was collared in the Altar United trend and was drilled to the North at a dip of -75 degrees.

The purpose of this drill hole was to fill a gap in drilling and to test for the northern contact of the well-mineralized

Altar United porphyry unit. The hole deviated significantly to the east and missed its intended infill target (Figure 3);

however, it was determined to continue the hole based on encouraging visuals of the mineralization. Although

deviated, the hole resulted in intercepting mineralized porphyry well beyond where the Company had previously

projected and ultimately expanded the Altar United Porphyry unit to the North and at depth.

Lithology: From surface until 250.00 m depth, drillhole ALD-24-235 intersected a strongly fragmental volcaniclastic

unit before entering wall rock rhyolite, which is crosscut by several intrusion dikes from a favorable diorite porphyry.

At 360 m depth, the hole intersected diorite porphyry continuously until 1,592 m depth where the drillhole enters

andesitic volcanic wall rocks. The hole stayed in this andesite until the end of the hole.

Alteration & Mineralization: Weathering is very strong from surface down to a depth of 309 m in drillhole ALD-24-

243. The upper portion of the hole is strongly oxidized and characterized by a strong, well-developed quartz vein

stockwork associated with pervasive “white sericite-pyrite-tourmaline” alteration. A weakly developed supergene

copper enrichment zone occurs from the base of oxidation until 420 m depth and is characterized by the occurrence

of secondary chalcocite coatings on both pyrite and chalcopyrite. Copper-sulphide mineralization in the hypogene

zone consists of chalcopyrite and traces of chalcocite associated with strong, early “K feldspar-biotite-(magnetite)-

chalcopyrite-pyrite” potassic alteration assemblages, overprinted by moderate to strong “green sericite-(chlorite)-

chalcopyrite-chalcocite-(pyrite)” alteration occurring as centimeter-wide “halo-type veins”. Molybdenum

mineralization is associated with the occurrence of “molybdenite-quartz-pyrite-chalcopyrite” veining that crosscut the

“green sericite-chlorite” halo veins. These late molybdenite-bearing veins may represent the outer halo of a younger,

deeper porphyry system that has yet to be drill tested.

ALD-24-129EXT

ALD-24-129EXT (Figure 4) was collared at the southern edge of Altar Central and was an extension of a vertical hole

previously drilled to 513 m depth. The purpose of the hole was to extend mineralization deeper and fill a gap in drilling

for the upcoming mineral resource update.

Lithology: Drillhole ALD-24-128EXT intersected rhyolite volcanic rocks intercalated with narrow intervals of

andesite volcanic rocks from surface to 635 m depth, before entering into massive andesite rocks until the end of the

hole.

Alteration & Mineralization: ALD-24-129EXT encountered strongly oxidized and leached rocks from surface to 168

m depth. Secondary copper enrichment is weakly developed underneath the leached cap and is characterized by the

occurrence of supergene chalcocite coating pyrite and chalcopyrite, up to 410 m depth. Hypogene copper

mineralization in ALD-24-129EXT is consistent along the hole and is associated with chalcopyrite, pyrite, and bornite,

which are associated predominantly with a potassic alteration assemblage consisting of k-feldspar, biotite, and

magnetite. This early potassic alteration is overprinted by weak to moderate “green sericite-chlorite-chalcopyrite-

pyrite” assemblages and by minor “white sericite-pyrite” alteration and scattered, narrow “pyrite-enargite” structures.

ALD-24-165EXT

ALD-24-165EXT (Figure 5) was collared in the Altar East area and was an extension of a vertical hole previously

drilled to 484.50 m depth. The purpose of the hole was to extend mineralization deeper and fill a gap in drilling for

the upcoming mineral resource update.

Lithology: Drillhole ALD-24-165EXT cut through dacitic fragmental volcaniclastic rocks from surface to 253 m

depth, before entering a quartz diorite porphyry unit until 1,147 m depth, after which the hole intercepted a rhyolite

until the end of the hole.

Alteration & Mineralization: ALD-24-165EXT encountered strongly oxidized and leached rocks from surface to 88

m depth. Secondary copper enrichment is weakly-developed underneath the leached cap. Hypogene copper

mineralization in ALD-24-165EXT consists of chalcopyrite and lesser amounts of bornite and hypogene chalcocite,

which are intimately related with the occurrence of moderate to strong green sericite-(chlorite)-chalcopyrite alteration

that is overprinting earlier, biotite-k-feldspar-magnetite-chalcopyrite-(bornite) alteration. Moderate quartz veining is

associated with the occurrence of copper mineralization. Weaker mineralization in ALD-24-165EXT is a consequence

of the overprinting of moderate to strong intensity “white sericite-pyrite” alteration increasing remarkably to the

bottom of the hole. Discrete structures with high-sulphidation and intermediate-sulphidation assemblages are also

frequent along the drillhole.

Project Update

The Company has completed its 2023/2024 field campaign and the Altar camp is now closed for winter. The Company

drilled 20,024.40 m in 20 diamond drill holes. Four holes remain to be reported. Holes ALD-24-244, ALD-24-245,

ALD-24-062EXT and ALD-24-150EXT were drilled to 1,061 m, 979 m, 1,161 m and 1,239.50 m depth, respectively.

Holes ALD-24-062EXT and ALD-24-150EXT are extensions of historic holes previously terminated at 470 m and

548 m depth, respectively.

Webinar

For more context, please join the Company in a live event on Wednesday, June 19, at 10:00 am EDT / 7:00 am PDT.

Q&A will follow the presentation. Click here to register: https://events.6ix.com/preview/aldebaran-resources-

presents-exploration-update-1.

Qualified Person

The scientific and technical data contained in this news release has been reviewed and approved by Dr. Kevin B.

Heather, B.Sc. (Hons), M.Sc, Ph.D, FAusIMM, FGS, Chief Geological Officer and director of Aldebaran, who serves

as the qualified person (QP) under the definitions of National Instrument 43-101.

ON BEHALF OF THE ALDEBARAN BOARD

(signed) “John Black”

John Black

Chief Executive Officer and Director

Tel: +1 (604) 685-6800

Email: [email protected]

Please click here and subscribe to receive future news releases:

https://aldebaranresources.com/contact/subscribe/

For further information, please consult our website at www.aldebaranresources.com or contact:

Ben Cherrington

Manager, Investor Relations

Phone: +1 347 394-2728 or +44 7538 244 208

Email: [email protected]

About Aldebaran Resources Inc.

Aldebaran is a mineral exploration company that was spun out of Regulus Resources Inc. in 2018 and has the same

core management team. Aldebaran holds a 60% interest in the Altar copper -gold project in San Juan Province,

Argentina and can earn an additional 20% interest in the project by completing a further $25 million in expenditures

at Altar over the next three years. The Altar project hosts multiple porphyry copper-gold deposits with potential for

additional discoveries. Altar forms part of a cluster of world-class porphyry copper deposits which includes Los

Pelambres (Antofagasta Minerals), El Pachón (Glencore), and Los Azules (McEwen Copper). In March 2021 the

Company announced an updated mineral resource estimate for Altar, prepared by Independent Mining Consultants

Inc. and based on the drilling completed up to and including 2020 (independent technical report prepared by

Independent Mining Consultants Inc., Tucson, Arizona, titled "Technical Report, Estimated Mineral Resources, Altar

Project, San Juan Province, Argentina", dated March 22, 2021 - see news release dated March 22, 2021).

Sampling and Analytical Procedures

Altar follows systematic and rigorous sampling and analytical protocols which meet and exceed industry standards.

These protocols are summarized below and are available on the Aldebaran website at www.aldebaranresources.com.

All drill holes are diamond core holes with PQ, HQ or NQ core diameters. Drill core is collected at the drill site where

recovery and RQD (Rock Quality Designation) measurements are taken before the core is boxed and transported to

the Altar camp facilities, a short distance away, where the whole core is photographed under more optimum lighting

conditions and geological quick log is produced. The whole-core is then marked and sampled into geological defined,

systematic 1- to 2-metre sample intervals, unless the geologist determines the presence of an important geological

contact, which should not be crossed. The whole-core is then cut-in-half with a diamond saw blade, with half the

sample retained in the core box for future reference and the other half placed into a pre-labelled plastic bag, sealed

with a two plastic security zip ties, and labeled with a unique sample number. The bagged samples are then placed

into larger plastic sacks and those sacks are sealed with another plastic security zip tie and labelled for shipment. The

sacks are then placed onto wooden pallets and wrapped in plastic shrink-wrap and stored in a secure area pending

shipment to a certified ALS laboratory sample preparation facility located in Mendoza, Argentina, where the samples

are dried, crushed, and pulverized. The resulting sample pulps are sent by batch to the ALS laboratory in Lima for

geochemical assay analysis, including a 30g fire assay with an atomic absorption (AA) finish analysis for gold and a

full multi-acid digestion (4-acid) with ICP-AES analysis for other elements. Samples with results that exceed

maximum detection values for gold are re-analyzed by fire assay with a gravimetric finish and other elements of

interest are re-analyzed using precise ore-grade ICP analytical techniques. Aldebaran independently inserts certified

control standards (Super Certified Reference Materials (SCRM’s), coarse field blanks, and duplicates into the sample

stream to monitor data quality. These control samples represent 10-12% of the total samples submitted and are inserted

“blindly” to the laboratory in the sample sequence prior to departure from the Aldebaran facilities.

Forward-Looking Statements

Certain statements regarding Aldebaran, including management's assessment of future-plans and operations, may constitute

forward-looking statements under applicable securities laws and necessarily involve known and unknown risks and uncertainties,

most of which are beyond Aldebaran's control. Often, but not always, forward-looking statements or information can be identified

by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts",

"intends", "anticipates" or "does not anticipate" or "believes" or variations of such words and phrases or statements that certain

actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Specifically, and without limitation, all statements included in this press release that address activities, events or developments

that Aldebaran expects or anticipates will or may occur in the future, including the proposed exploration and development of the

Altar project described herein, and management's assessment of future plans and operations and statements with respect to the

completion of the anticipated exploration and development programs, may constitute forward-looking statements under applicable

securities laws and necessarily involve known and unknown risks and uncertainties, most of which are beyond Aldebaran's control.

These risks may cause actual financial and operating results, performance, levels of activity and achievements to differ materially

from those expressed in, or implied by, such forward-looking statements. Although Aldebaran believes that the expectations

represented in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be

correct. The forward-looking statements contained in this press release are made as of the date hereof and Aldebaran does not

undertake any obligation to publicly update or revise any forward-looking statements or information, whether as a result of new

information, future events or otherwise, unless so required by applicable securities law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Figure 1 – Plan map showing drill holes from the 2023-2024 drill program.

Figure 2 – Close-up plan view map showing the deviation of hole ALD-24-243 (with CuEq (%)) relative to previous

drill holes.

Figure 3 – Cross-section displaying CuEq (%) values in ALD-24-243.