AIS RESOURCES COMPLETES 43M OF DRILLING AT SALINITAS

PROJECT, SALINAS GRANDES, NORTH ARGENTINA

VANCOUVER, BRITISH COLUMBIA, November 28, 2018 / AIS Resources Limited (“AIS”)( (TSX-V

– AIS, OTCQB: AISSF) announces that Hidrotec Drilling has completed 43m of drilling and has

cemented the steel casing in place at AIS’s Salinitas joint venture project with MGX Minerals Inc

(CDN:XMG).

Samples taken from the 43m interval show a porous coarse sand which is conducive to the

transmission of brines. The trenching program confirmed the presence of porous sands. The

resistivity of these sands is expected to be encountered at depth.

Phil Thomas, AIS CEO and Exploration Geologist said he was delighted at the speed the roads

were constructed, the availability of water beside the drill hole location and the gracious attitude

of the surrounding communities at the pre-mobilization meeting on November 16, 2018.

Since 1967

TSX-V: AIS A.I.S. Resources Limited

Page 2 of 5

Fig 1 above shows drilling a 6 inch well for the steel casing that went in on 25 th Nov 2018 before

they diamond drill HQ diameter core. The casing is to prevent a collapse of the well in

unconsolidated sediments as brine pressures at depth are significant.

Location of Drill hole 2

Fig 2 above shows the dark purple area in the TEM survey shows resistivity values that are less

than the value for salt water implying the presence of other elements in the brines.

Fig 3 shows sandy unconsolidated sediments from the 43.7m level in DH1.

Since 1967

TSX-V: AIS A.I.S. Resources Limited

Page 3 of 5

Fig 4 Road into the drill site showing Salinas Grandes salar in the background. Roads used by

Bollare (now Eramet) to drill and still in perfect condition only 11km away.

Phil Thomas, Chief Executive Officer of AIS Resources stated: “It is all systems go now, with Alex

Stewart Laboratories in Jujuy on standby to process brine results using ICP. We have scheduled

12 double packer tests to sample the brines down to 400m. Our Geologist David Carabanti is on

site to log the core and supervise. Geosystems in Tucson are ready to complete the specific yield

and other porosity tests.”

The Salintas Project with MGX (CDN:XMG) is a joint venture where MGX have agreed to fund

CAD$1.2 million in works for an 80% interest over the next two years. Subject to brine composition

and flow rate, it is our intention to put in a production well to be drilled in either drill hole 1 or 2

for a 30-day pump test. The budget for a two-hole program including post hole analysis and

reporting is approximately US$400,000. If the project is a success, another 4 wells will be drilled

to production dimensions. Salinas Grandes has been explored with positive results by Orocobre

in 2011 and is currently being explored by other Cateo holders nearby.

Since 1967

TSX-V: AIS A.I.S. Resources Limited

Page 4 of 5

Qualified Person

Phillip Thomas, BSc. Geol, MBusM, MAIG, MAIMVA, (CMV), a Qualified Person as defined under

NI 43-101 regulations, has reviewed the technical information that forms the basis for this news

release, and has approved the disclosure herein. Mr. Thomas is not independent of the Company

as he is Chief Executive Officer and a shareholder.

About A.I.S. Resources Ltd

A.I.S. Resources Ltd. is a TSX-V listed investment issuer, was established in 1967 and is managed

by experienced, highly qualified professionals who have a long track record of success in lithium

exploration, production and capital markets. Through their extensive business and scientific

networks, they identify and develop early-stage projects worldwide that have strong potential for

growth with the objective of providing significant returns for shareholders.The Company’s current

activities are focused exclusively on the exploration and development of lithium brine projects in

northern Argentina.

On Behalf of the Board of Directors,

A.I.S. Resources Limited

Phillip Thomas

President and CEO

Contact

Phillip Thomas - President and CEO

T: 747-200 9412

E: [email protected]

Website: www.aisresources.com

ADVISORY: This press release contains forward-looking statements. More particularly,

this press release contains statements concerning the anticipated use of the proceeds of

the Private Placement. Although the Corporation believes that the expectations reflected

in these forward-looking statements are reasonable, undue reliance should not be placed

on them because the Corporation can give no assurance that they will prove to be correct.

Since forward-looking statements address future events and conditions, by their very

nature they involve inherent risks and uncertainties. The intended use of the proceeds of

the Private Placement by the Corporation might change if the board of directors of the

Since 1967

TSX-V: AIS A.I.S. Resources Limited

Page 5 of 5

Corporation determines that it would be in the best interests of the Corporation to deploy

the proceeds for some other purpose. The forward-looking statements contained in this

press release are made as of the date hereof and the Corporation undertakes no

obligations to update publicly or revise any forward-looking statements or information,

whether as a result of new information, future events or otherwise, unless so required by

applicable securities laws. Neither TSX Venture Exchange nor its Regulation Services

Provider (as that term is defined in policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.