Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AIR.V ·

Clean Air Metals Reports 21.4 m Grading 7.64 g/t Pt.eq in Latest Drilling Results

Drill Results

1

Clean Air Metals Reports 21.4 m Grading

7.64 g/t Pt.eq in Latest Drilling Results

Thunder Bay, ON, February 27, 2025 – Clean Air Metals Inc. (“Clean Air Metals” or

the “Company”) (TSX.V: AIR; FRA: CKU; OTCQB: CLRMF) is pleased to announce the

first results from its ongoing winter drilling program at its 100%-owned Thunder Bay

North Critical Minerals Project (“TBN”). Results from the first three (3) holes confirmed

that the known areas of near-surface, high-grade mineralization at the Current deposit

are more significant than initially thought. Assay results for the remaining 10 holes are

pending and will be released when received.

Assay highlights:

• 21.4 m of 2.71 g/t Pt, 2.41 g/t Pd, 0.53% Cu and 0.28% Ni (7.64 g/t Pt.eq1;

2.56% Cu.eq2) from 96 m downhole in Hole CL25-002, including

o 3.83 g/t Pt, 3.37 g/t Pd, 0.68% Cu and 0.34% Ni (10.39 g/t Pt.eq1;

3.48% Cu.eq2) over 5.75 m from 100.3 m, and

o 4.20 g/t Pt, 3.76 g/t Pd, 0.89% Cu and 0.34% Ni (11.86 g/t Pt.eq1;

3.97% Cu.eq2) over 6.4 m from 111.0 m

• 49.0 m of 1.57 g/t Pt, 1.46 g/t Pd, 0.32% Cu and 0.21% Ni (4.63 g/t Pt.eq1;

1.55% Cu.eq2) from 74 m downhole in Hole CL25-001, including

o 2.91 g/t Pt, 2.67 g/t Pd, 0.55% Cu and 0.29% Ni (8.15 g/t Pt.eq1;

2.73% Cu.eq2) over 8 m from 96 m, and

o 2.74 g/t Pt, 2.42 g/t Pd, 0.53% Cu and 0.27% Ni (7.66 g/t Pt.eq1;

2.57% Cu.eq2) over 9 m from 110 m

Notes

1. Platinum equivalent are calculated as follows: Pt.eq = (Pt grade/31.1035 x $976 + Pd

grade x 31.1035 x 86.2% x $966 + Cu grade x 2204 x 95.9% x $4.25 + Ni grade x

2204 x 57% x 6.98 + Au grade/31.1035 x 85% x $2,939 + Ag grade/31.1035 x 65.2%

x $32.89) / $976 x 31.1035

2. Copper equivalents are calculated as follows: Cu.eq= (Cu grade x 2204 x $4.25 + Pt

grade x 31.1035 x 80.6% x $976 + Pd grade x 31.0135 x 86.2% x $966 + Ni grade x

2204 x 57% x $6.98 + Au grade/31.1035 x 85% x $2,9392 + Ag grade/31.1035 x

65.2% x $32.89) / $4.25 / 2204

Equivalents are based on the following recoveries Pt 80.6%, Pd 86.2%, Cu 95.9% Ni

57%, Au 85%, Ag 65.2%; and metal prices from February 20, 2025, US Spot; Pt $976,

Pd $966, Cu $4.25, Ni $6.98, Au $2939, Ag $32.89

Mike Garbutt, CEO of Clean Air Metals, remarked, “These latest results have validated

our belief that the Current deposit hosts more near-surface high-grade mineralization

2

than previously estimated. The impressive grade and significant thickness encountered

during the recent drilling programs provide additional support for establishing a more

robust, low-tonnage, high-grade production model. These results have also

highlighted the critical importance of leveraging downhole geophysics to locate the

highest-value mineralization targets at Current and Escape as we continue to advance

the Thunder Bay North Project.”

Table 1. Assays results from reported holes

Hole ID From

(m)

To

(m)

Length

(m)

Pt

(g/t)

Pd

(g/t)

Cu

(%)

Ni

(%)

Pt+Pd

(g/t)

Cu+Ni

(%)

Pteq1

(g/t)

Cueq2

(%)

CL25-001 74.0 123.0 49.0 1.57 1.46 0.32 0.21 3.03 0.53 4.63 1.55

Incl 96.0 104.0 8.0 2.91 2.67 0.55 0.29 5.58 0.84 8.15 2.73

And 110.0 119.0 9.0 2.74 2.42 0.53 0.27 5.15 0.80 7.66 2.57

CL25-002 96.0 117.4 21.4 2.71 2.41 0.53 0.28 5.12 0.81 7.64 2.56

incl. 100.3 106.0 5.75 3.83 3.37 0.68 0.34 7.20 1.01 10.39 3.48

incl. 111.0 117.4 6.4 4.20 3.76 0.89 0.34 7.96 1.23 11.86 3.97

CL25-003 88.0 116.0 28.0 0.89 0.83 0.22 0.20 1.72 0.42 2.94 0.99

Incl 102.0 113.0 11.0 1.12 1.01 0.27 0.23 2.13 0.50 3.61 1.21

The Winter 2025 drilling program is strategically designed to augment the number,

size, and grade of near-surface high-grade subzones at the Current deposit, building

on the positive results from the Summer 2024 program (see September 10, 2024,

and October 3, 2024 news releases), including:

• 51.79 m of 4.92 g/t Pt, 4.66 g/t Pd, 1.07% Cu and 0.55% Ni (14.82 g/t

Pt.eq; 4.71% Cu.eq) from 86 m downhole in Hole CL24-001;

• 31.40 m of 4.22g/t Pt, 4.04g/t Pd, 0.95% Cu and 0.56% Ni (13.04 g/t Pt.eq;

4.14% Cu.eq) from 118 m downhole in Hole CL24-003.

These new findings, in conjunction with the summer program's results, validate the

extensions of the mineralized subzones beyond the most recent resource model (NI 43-

101 technical report on the Thunder Bay North Project, Ontario, Canada, SLR

Consulting Canada Ltd, June 19, 2023). This further reinforces our strategy of

advancing a high-grade, high-margin moderate tonnage project.

Figure 1. Plan view map showing drill hole locations for the ongoing 13-hole program

at the Current deposit.

3

Downhole Geophysics Program

To enhance the targeting of high-grade mineralized subzones, Clean Air Metals has

engaged Crone Geophysics to conduct downhole Electromagnetic (EM) surveys in the

Lower Current zone. This advanced program is designed to accurately identify and

target the thickest, most enriched portions of the subzones within both the Current and

Escape deposits for future drilling campaigns.

Recent analyses of historical geophysical data have revealed that downhole EM surveys

have been the most effective method for targeting high-grade mineralization at various

depths. For the upcoming downhole EM, the approach will be significantly enhanced

by employing smaller loop sizes and advanced sensor technologies specifically

designed to improve the detection of mineralized subzones, ensuring more precise

identification.

Clean Air Metals’ Vice President of Exploration, Lionnel Djon, commented, “The results

from our recent drilling at the Current deposit have provided us with increased

confidence in successfully targeting the highest-grade subzones. We’re particularly

excited by the lateral extensions of the known high-grade areas, which remain open

along strike. The systematic application of borehole EM surveys to pinpoint the position

4

of these high-grade ‘plums’ will allow us to target them downplunge to significant

depths.”

Table 2. Hole Coordinates

Hole ID Easting-

NAD83_16

(m)

Northing

NAD83_16

(m)

Elevation

(m)

Azimuth

(deg)

Dip

(deg)

Hole

length

(m)

CL25-001 357548 5402688 493 208.2 -73.9 165

CL25-002 357548 5402688 493 210.6 -85.2 150

CL25-003 357587 5402644 494 288.0 -84.1 150

Update on Project Development Activities

After completing the winter drill program and subsequent geophysics work, the

Company will evaluate the potential to update the resource, leading to a Preliminary

Economic Assessment that details our high-grade, high-margin, low-capital

development strategy for the Thunder Bay North project.

In line with our commitment to meaningfully advance the project, Clean Air Metals has

submitted a Notice of Project Change and Project Definition Report to the Ontario

Ministry of Mines in support of an Advanced Exploration Project designation. The status

change is the first step towards obtaining permits for a potential underground ramp

and bulk sample at the Current deposit.

Upcoming Investor Event

Clean Air Metals invites shareholders and interested parties to meet with Management

and the Technical team at the upcoming PDAC convention Core Shack (#3107B) on

March 4 and 5, 2025 at the Metro Toronto Convention Centre, Toronto.

Qualified Person

Dr. Lionnel Djon, Ph.D., P.Geo., a Qualified Person under National Instrument 43-101

and Vice President of Exploration for the Company, has reviewed and approved all

technical information in this press release.

Quality Assurance / Quality Control

Clean Air Metals uses ALS Global (“ALS”), a well-established and recognized mineral

assay and geochemical analytical services company. The Thunder Bay laboratory holds

ISO-9000 accreditation; the Vancouver facility holds ISO-17025 registration.

All NQ-sized drill cores are cut with a diamond-tipped saw blade, and half are submitted

to ALS for sample preparation and analysis. Sample preparation is completed at the

5

ALS sample preparation facility in Thunder Bay, ON, and analysis is completed at the

primary ALS assay laboratory in Vancouver, B.C.

Clean Air Metals follows a quality control procedure for its core assay sampling

program: inserting blind blanks and certified Palladium-Platinum and Copper-Nickel

standards into the sample stream. The insertion procedure follows industry standards

with control sample frequency depending on the length of the sampled interval.

Gold, platinum, and palladium are analyzed using fire assay (FA) with an inductively

coupled plasma mass spectrometry (ICP-MS) finish. Samples with grades above the

optimal ICP-MS detection limits are analyzed using optical emission spectroscopy (ICP-

OES).

Also, thirty-three (33) elements of each sample, including copper, nickel, silver,

chromium, cobalt, and sulphur, are analyzed by a multi-element analytical method

using the atomic emission spectroscopy (ICP-AES) technique following four-acid

digestion of the sample. When samples have grades above the optimal detection limits

for this analytical method, they are re-analyzed using a high-grade assay method with

an ICP finish.

About Clean Air Metals

Clean Air Metals is a development and exploration company advancing its flagship,

100% owned Thunder Bay North Critical Minerals (“TBN”) project, 40 km northeast of

Thunder Bay, Ontario. The TBN project, accessible by road and next to established

infrastructure, hosts two (2) deposits - the Current and Escape deposits, only 2.5 km

apart. Together, the deposits host a 13.8 Mt indicated mineral resource containing

2.4M Pt eq. oz (Technical Report on the Thunder Bay North Project, Ontario Canada,

NI43-101, SLR Consulting Canada Ltd, June 19, 2023) with significant potential for

expansion down-plunge.

One of the rare primary platinum resources outside of South Africa, the TBN project is

in a stable and mining-friendly jurisdiction and benefits from longstanding relationships

with local First Nations. With its proven technical team, Clean Air Metals is committed

to growing the resources at the TBN project and creating long-term value for

shareholders.

Social Engagement

Clean Air Metals Inc. acknowledges that the Thunder Bay North Critical Minerals Project

is located within the area encompassed by the Robinson-Superior Treaty of 1850 and

includes the territories of the Fort William First Nation, Red Rock Indian Band,

Biinjitiwabik Zaaging Anishinabek and Kiashke Zaaging Anishinaabek. Clean Air Metals

also acknowledges the contributions of the Métis Nation of Ontario, Region 2 and the

Red Sky Métis Independent Nation to the rich history of our area. 

6

The Company appreciates the opportunity to work in these territories and remains

committed to the recognition and respect of those who have lived, travelled, and

gathered on the lands since time immemorial. Clean Air Metals is committed to

stewarding Indigenous heritage and remains committed to building, fostering and

encouraging a respectful relationship with First Nations, Métis and Inuit peoples based

upon principles of mutual trust, respect, reciprocity and collaboration in the spirit of

reconciliation.

ON BEHALF OF THE BOARD OF DIRECTORS

"Mike Garbutt"

Mike Garbutt, CEO of Clean Air Metals Inc.

Connect with us on X/ Facebook/ Instagram.

Visit www.cleanairmetals.ca for more information or contact:

Mia Boiridy

Director of Communications and Investor Relations

250-575-3305

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Note

The information contained herein contains "forward-looking statements" within the

meaning of applicable securities legislation. Forward-looking statements relate to

information that is based on assumptions of management, forecasts of future results,

and estimates of amounts not yet determinable. Any statements that express

predictions, expectations, beliefs, plans, projections, objectives, assumptions or, future

events or performance are not statements of historical fact and may be "forward-looking

statements." Forward-looking statements are subject to a variety of risks and

uncertainties which could cause actual events or results to differ from those reflected in

the forward-looking statements, including, without limitation: political and regulatory

risks associated with mining and exploration; risks related to the maintenance of stock

exchange listings; risks related to environmental regulation and liability; the potential

for delays in exploration or development activities or the completion of feasibility

studies; the uncertainty of profitability; risks and uncertainties relating to the

interpretation of drill results, the geology, grade and continuity of mineral deposits;

risks related to the inherent uncertainty of production and cost estimates and the

potential for unexpected costs and expenses; results of prefeasibility and feasibility

7

studies, and the possibility that future exploration, development or mining results will

not be consistent with the Company's expectations; risks related to commodity price

fluctuations; and other risks and uncertainties related to the Company's prospects,

properties and business detailed elsewhere in the Company's disclosure record.

Should one or more of these risks and uncertainties materialize, or should underlying

assumptions prove incorrect, actual results may vary materially from those described in

forward-looking statements. Investors are cautioned against attributing undue certainty

to forward-looking statements. These forward-looking statements are made as of the

date hereof, and the Company does not assume any obligation to update or revise

them to reflect new events or circumstances except in accordance with applicable

securities laws. Actual events or results could differ materially from the Company's

expectations or projections.