Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AIR.V ·

Clean Air Metals Drilling Confirms Down-Plunge Extension of the Escape Deposit

Drill Results

1

Clean Air Metals Drilling Confirms Down-Plunge

Extension of the Escape Deposit

Thunder Bay, ON, October 20, 2025 – Clean Air Metals Inc. (“Clean Air Metals” or

the “Company”) (TSX.V: AIR; FRA: CKU; OTCQB: CLRMF) is pleased to announce that

its 2025 summer drilling program at the Company’s 100%-owned Thunder Bay North

Critical Minerals Project (“TBN”) has confirmed the continuation of the Escape Deposit

into a previously untested 2.5 km long magnetic anomaly that connects to the known

mineral resources. The single hole completed during this program intersected high-

tenor sulphide mineralization having comparable thickness and metal grades to the

existing Escape Deposit resource. Given its significant size, the Escape down-plunge

target represents the highest potential resource addition opportunity for the TBN

project.

Assay highlights from hole EL25-001:

• 53 m of 0.52 g/t Pt, 0.69 g/t Pd, 0.26% Cu and 0.17% Ni (from 404 m

downhole, including

o 0.84 g/t Pt, 1.12 g/t Pd, 0.41% Cu and 021% Ni over 22 m from 411

m, and

o 1.08 g/t Pt, 1.41 g/t Pd, 0.52% Cu and 0.24% Ni over 11 m from 430

m, and

The results from EL25-001 confirm that drilling successfully entered the mineralized

conduit system that hosts the Escape Deposit and provides a clear pathway for resource

expansion down-plunge.

2

Table 1. Assay results from the reported hole

Hole ID From

(m)

To

(m)

Length

(m)

Pt

(g/t)

Pd

(g/t)

Au

(g/t)

Cu

(%)

Ni (%) Pt+Pd

(g/t)

Cu+Ni

(%)

EL25-001 404 457 53 0.52 0.69 0.06 0.26 0.17 1.20 0.43

Incl. 411 433 22 0.84 1.12 0.10 0.41 0.21 1.96 0.63

And 419 430 11 1.08 1.41 0.14 0.52 0.24 2.49 0.76

Mike Garbutt, CEO of Clean Air Metals, remarked, “This intercept represents a step-

change in our outlook for the Escape conduit system. Hitting PGE-Cu-Ni-rich sulphide

mineralization beyond the known resource envelope validates our geophysical targeting

strategy. I can’t understate the potential impact that the continuation of the Escape-

down-plunge can have on the scale and economics of this project”.

Figure 1. Plan view and longitudinal sections of the Escape Deposit and Down-Plunge

Target illustrating the mineralized intercepts in drill hole EL25-001 relative to the

modelled extension of the known resource. Also shown are the locations of untested

magnetic and conductive anomalies distributed along the 2.5-kilometre highly

prospective mineralized conduit.

3

4

Escape Deposit Down-Plunge Extension Drilling

During the summer of 2025, the Company completed its first hole (EL25-001) within the

projected down-plunge extension of the Escape Deposit. The modelled extension is

largely based on 3D magnetic inversion data, which show that the Escape Deposit and

the extension target are part of a single, sinuous to linear magnetic anomaly sourced

from altered ultramafic rocks that host the Escape Deposit. The extension also features

local conductivity anomalies (Figure 1) that are of immediate interest for drilling.

Drillhole EL25-001 tested one of these coincident magnetic and conductivity anomalies

and, more specifically, a “ballroom”-shaped coincident anomaly analogous to the high-

grade ballroom structures recently intersected at the Current Deposit (see April 15,

2025, News Release).

The hole intersected disseminated PGE-Cu-Ni-rich magmatic sulphides (up to 5% in

abundance) over a 53-metre-thick gabbro-to-peridotite sequence, confirming the

presence of sulphide mineralization beyond the previously modelled resource

envelope (Figure 1). A borehole electromagnetic (BHEM) survey completed after

drilling detected a strong off-hole conductor in the lower part of the hole, providing a

clear vector for subsequent follow-up drilling.

The results from EL25-001 confirm that drilling has successfully re-entered the same

mineralized conduit that hosts the Escape Deposit, as demonstrated by comparable

metal ratios, tenors, and lithological characteristics. This outcome is a major technical

success and provides a clear pathway for resource expansion in the down-plunge

extension target.

For reference, the Escape Deposit is a key contributor to the Thunder Bay North Project,

accounting for approximately 40% of the total metal content within the estimated 14.9

million tonnes of Indicated Resources (see October 9, 2025, News Release). The High-

Grade Zone (HGZ) at Escape, which contains 3.1 Mt grading 3.26 g/t Pd+Pt and 1.0%

Cu+Ni, occupies roughly 400 metres of the 3.5-kilometre-long Escape conduit (Figure

1). The magnetic anomaly defining the Escape down-plunge target extends a further

2.5 kilometres, highlighting the strong potential to delineate additional mineral

resources along the continuation of the Escape conduit.

Clean Air Metals’ Vice President of Exploration, Lionnel Djon, commented, “The first

hole drilled into the extension target at Escape was a tremendous success and unlocks

a huge area for future, potential resource gains for the TBN project. We can now

confidently move forward with plans to fully test the 2.5 km strike length of this highly

prospective target, including systematic diamond drilling guided by new surface and

borehole EM surveys. “

5

Potential Enhancement to Recent PEA Economics

The PEA outlined an 11-year mine life, producing 8.7M tonnes of mill feed at 2,500

tonnes per day from a near-surface, ramp-access underground operation, with

production shipped off-site for toll-milling. As outlined in the October 9, 2025 News

Release, the project boasts a C$219.4M pre-tax NPV8 and IRR of 39%, which expands

to C$316M NPV8 and IRR of 52%, at October 8th, spot prices The Escape portion of the

mine plan contains roughly half of the mill feed contained in the study over 1km of

strike distance. The prospect of extending the Escape conduit down plunge over a

similar distance would significantly increase the operational life or lead to potential

throughput increases.

Next step

Building on the success of hole EL25-001, the Company plans to complete an infill

Magnetotelluric (MT) survey to better define the size and position of conductive zones

potentially associated with local accumulations of PGE-rich sulphide mineralization

within the Ballroom structures. The results of this survey will guide a series of follow-up

drill holes and borehole EM surveys within the 2.5-kilometre-long extension target.

Upcoming Webinar

Clean Air Metals invites shareholders and other interested parties to participate in a

webinar on Thursday, October 23, 2025, at 4:00 pm EST. Mike Garbutt, President

and CEO, will provide an overview of the Company’s latest developments, including

the recently announced PEA and answer questions.

Click on the link below to register:

https://us02web.zoom.us/webinar/register/WN_fYYGm9V8QfmGFAaD1f-ZOw.

After registering, you will receive a confirmation email with details on how to join the

webinar.

Qualified Person

Dr. Lionnel Djon, Ph.D., P.Geo., a Qualified Person under National Instrument 43-101

and Vice President of Exploration for the Company, has reviewed and approved all

technical information in this press release.

6

About Clean Air Metals

Clean Air Metals is a development and exploration company advancing its flagship,

100% owned Thunder Bay North Critical Minerals (“TBN”) project, 40 km northeast of

Thunder Bay, Ontario. The TBN project, accessible by road and adjacent to established

infrastructure, hosts two (2) deposits—the Current and Escape deposits, which are only

2.5 km apart. Together, the deposits host a 13.8 Mt indicated mineral

resource containing 2.4M Pt eq. oz (Technical Report on the Thunder Bay North Project,

Ontario, Canada, NI43-101, SLR Consulting Canada Ltd, June 19, 2023) with significant

potential for expansion down-plunge.

Social Engagement

Clean Air Metals Inc. acknowledges that the Thunder Bay North Critical Minerals Project

is located within the area encompassed by the Robinson-Superior Treaty of 1850 and

includes the territories of the Fort William First Nation, Red Rock Indian Band,

Biinjitiwabik Zaaging Anishinabek and Kiashke Zaaging Anishinaabek. Clean Air Metals

also acknowledges the contributions of the Métis Nation of Ontario, Region 2 and the

Red Sky Métis Independent Nation to the rich history of our area. 

The Company appreciates the opportunity to work in these territories and remains

committed to the recognition and respect of those who have lived, travelled, and

gathered on the lands since time immemorial. Clean Air Metals is committed to

stewarding Indigenous heritage and remains committed to building, fostering and

encouraging a respectful relationship with First Nations, Métis and Inuit peoples based

upon principles of mutual trust, respect, reciprocity and collaboration in the spirit of

reconciliation.

ON BEHALF OF THE BOARD OF DIRECTORS

"Mike Garbutt"

Mike Garbutt, CEO of Clean Air Metals Inc.

Connect with us on X/ Facebook/ Instagram.

Visit www.cleanairmetals.ca for more information or contact:

Mia Boiridy

Director of Communications and Investor Relations

250-575-3305

[email protected]

7

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

Cautionary Note

The information contained herein contains "forward-looking statements" within the

meaning of applicable securities legislation. Forward-looking statements relate to

information that is based on assumptions of management, forecasts of future results,

and estimates of amounts not yet determinable. Any statements that express

predictions, expectations, beliefs, plans, projections, objectives, assumptions or, future

events or performance are not statements of historical fact and may be "forward-looking

statements." Forward-looking statements are subject to a variety of risks and

uncertainties which could cause actual events or results to differ from those reflected in

the forward-looking statements, including, without limitation: political and regulatory

risks associated with mining and exploration; risks related to the maintenance of stock

exchange listings; risks related to environmental regulation and liability; the potential

for delays in exploration or development activities or the completion of feasibility

studies; the uncertainty of profitability; risks and uncertainties relating to the

interpretation of drill results, the geology, grade and continuity of mineral deposits;

risks related to the inherent uncertainty of production and cost estimates and the

potential for unexpected costs and expenses; results of prefeasibility and feasibility

studies, and the possibility that future exploration, development or mining results will

not be consistent with the Company's expectations; risks related to commodity price

fluctuations; and other risks and uncertainties related to the Company's prospects,

properties and business detailed elsewhere in the Company's disclosure record.

Should one or more of these risks and uncertainties materialize, or should underlying

assumptions prove incorrect, actual results may vary materially from those described in

forward-looking statements. Investors are cautioned against attributing undue certainty

to forward-looking statements. These forward-looking statements are made as of the

date hereof, and the Company does not assume any obligation to update or revise

them to reflect new events or circumstances except in accordance with applicable

securities laws. Actual events or results could differ materially from the Company's

expectations or projections.