Silver X Provides Q4 and Half Year 2022 Production Results and Declares Commercial Production

Production Results Mine Development & Operations

SILVER X MINING CORP.

Suite 1430 – 800 West Pender Street, Vancouver, B.C. V6C 2V6

SILVER X PROVIDES Q4 AND HALF YEAR 2022 PRODUCTION RESULTS AND

DECLARES COMMERCIAL PRODUCTION

Vancouver, B.C., January 19 2023 - SILVER X MINING CORP. (TSX -V: AGX) (OTC QB:

AGXPF) (F: WPZ) ("Silver X" or the "Company"), is pleased to announce its operating results for the

fourth quarter (“Q4”) of 2022 and for the year ended December 31, 2022 from the Tangana mining unit

(“Tangana”) at the Company’s Nueva Recuperada propert y (the “ Project”) in Peru and declares

commercial production effective January 2023.

H2 2022 Production highlights (compared to 2021)

• Half year silver equivalent(1) (AgEq) head grade of 422 AgEq g/t in the second half of 2022

(“H2”)

• Processed 181% more AgEq ounces in H2 2022 than H2 2021, 874,662 oz AgEq versus 311,249

oz AgEq

• Produced 1 59% more AgEq ounces in the H2 2022 than H2 2021, 673,458 oz AgEq versus

260,153 oz AgEq

Q4 2022 Production highlights (compared to Q4 2021)

• Quarterly AgEq (1) head grade of 367 g/t AgEq in Q4 2021

• Processed 114% more AgEq ounces in the Q4 2022 than Q4 2021, 393,622 oz AgEq versus

184,332 oz AgEq

• Produced 101% more AgEq ounces in Q4 2022 than Q4 2021, 302,386 oz AgEq versus 150,440

oz AgEq

• Continued quarter over quarter improvements in tonnes mined and processed

“We are pleased with our strong finish to 2022 and excited to commence commercial production at the

Project in 2023” said José Garcia CEO of Silver X. “2022 was a transformational year as we delivered

quarter over quarter increase in production and mining. Continued exploration at the Project is poised to

provide consistent production and cash flow in the coming year. We look forward to continuing building

value for all our stakeholders.”

Commercial Production

The declaration of commercial production at the Project comes after a successful commissioning period

over the year 2022 which included the ra mp up of mining and processing activities at the Project to

- 2 -

sustainable metal throughput levels. All key mill upgrades and mine development works completed to

date have demonstrated its ability to sustain ongoing production levels as the Tangana mine continues to

develop and grow its production. The Company will continue to seek opportunities to furth er optimize

the throughput and availabilities to achieve and ultimately exceed the Mine’s current 720 tonne per day

design nameplate capacity.

Continuing project development is providing access to new faces with plant head grade expected to

stabilize in the coming months. However, grade variation will likely continue in the short term given the

geological nature of the Tangana system. The H2 2022 head grade of 422 g/t AgEq is in line with internal

mine planning and updated guidance will be available shortly.

Recent demonstrations in Peru have remained localized in nature however the Recuperada operation has

been impacted by minor logistical disruptions. The Recuperada plant has been operating at a low through

put to start 2023 but is expected to return to full capacity by the third week of January. Nueva Recuperada

and other assets throughout the country, remain safe and secure.

Production Results

Production performance Unit 2022 2021 Var. Var. - %

Ore mined tonnes 33,794 29,042 4,752 16%

Ore processed tonnes 33,392 31,600 1,792 6%

Average head grades

Silver g/t 59.1 39.9 19.2 48%

Gold g/t 1.87 - 1.87 100%

Zinc % 1.86 2.15 (0.30) -14%

Lead % 1.61 1.36 0.25 18%

Average AgEq (1) head grades g/t 367 181 185 102%

Average AgEq (1) head grades oz/t 11.79 5.83 5.95 102%

Average recoveries

Silver % 87% 76% 11% 14%

Gold % 73% 0% 73% 100%

Zinc % 79% 85% -6% -7%

Lead % 88% 83% 5% 6%

Metal processed

Silver oz 63,456 40,554 22,901 56%

Gold oz 2,013 - 2,013 100%

Zinc lbs 1,368,542 1,500,927 (132,386) -9%

Lead lbs 1,184,484 947,103 237,381 25%

AgEq processed (1) oz 393,622 184,332 209,290 114%

AgEq produced (1)

oz 302,386 150,440 151,946 101%

Fourth Quarter

- 3 -

Notes:

Production data is prepared on a Q4 2022 vs Q4 2021 and H2 2022 vs H2 2021 basis as the Company began operations in June 2021.

(1) AgEq ounces produced were calculated based on all metals produced using the average sales prices of each metal for each month during

the period. Revenues from concentrate sales does not consider metallurgical recoveries in the calculations as the metal recoveries are built

into the sales amounts.

Please see “Cautionary Note regarding Production without Mineral Reserves” at the end of this news

release.

Qualified Person

Mr. A. David Heyl, B.Sc., C.P.G who is a qualified person under NI 43-101, has reviewed and approved

the technical content of this news release for Silver X. Mr. A. David Heyl is a consultant for Silver X.

Cautionary Note regarding Production without Mineral Reserves

The decision to commence production at the Nueva Recuperada Project and the Company's ongoing

mining operations as referenced herein (the " Production Decision and Operations ") are based on

economic models prepared by the Company i n conjunction with management's knowledge of the

property and the existing estimate of inferred mineral resources on the property. The Production Decision

and Operations are not based on a preliminary economic assessment, a pre -feasibility study or a

feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, there

Production performance Unit 2022 2021 Var. Var. - %

Ore mined tonnes 62,252 51,288 10,963 21%

Ore processed tonnes 64,441 57,801 6,641 11%

Average head grades

Silver g/t 63.6 36.1 27.5 76%

Gold g/t 2.5 - 2.48 100%

Zinc % 1.6 2.0 (0.46) -23%

Lead % 1.5 1.3 0.17 13%

Average AgEq (1) head grades g/t 422 167 255 152%

Average AgEq (1) head grades oz/t 13.57 5.4 8.19 152%

Average recoveries

Silver % 87% 77% 10% 13%

Gold % 79% 0% 79% 100%

Zinc % 81% 86% -5% -6%

Lead % 88% 84% 4% 5%

Metal processed

Silver oz 131,767 67,163 64,603 96%

Gold oz 5,141 - 5,141 100%

Zinc lbs 2,250,282 2,605,060 (354,778) -14%

Lead lbs 2,142,005 1,701,571 440,434 26%

AgEq processed (1) oz 874,662 311,249 563,413 181%

AgEq produced (1)

oz 673,458 260,153 413,305 159%

July - December

- 4 -

is increased uncertainty and economic and technical risks of failure associated with the Production

Decision and Operations, in particular: the risk that mineral grades will be lower than expected; the risk

that additional construction or ongoing mining operations are more difficult or more expensive than

expected; and production and economic variables may vary considerably, due to the absence of a detailed

economic and technical analysis in accordance with NI 43-101.

About Silver X

Silver X is a Canadian silver mining company with assets in Peru. The Company’s flagship asset is the

Tangana silver, gold, lead, zinc, and copper project (the "Project") located in Huancavelica, Peru, 10 km

north-northwest of the Nueva Recuperada polymeta llic concentrate plant. Founders and management

have a successful track record of increasing shareholder value. For more information visit our website at

www.silverxmining.com.

ON BEHALF OF THE BOARD

José M. Garcia

CEO and Director

For further information, please contact:

Silver X Mining Corp.

José M. Garcia, CEO

+1 604 831 8070 | [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Statement Regarding “Forward-Looking” Information

This press release contains forward -looking information within the meaning of applicable Canadian securities legislation

(“forward-looking information”). Generally, forward -looking information ca n be identified by the use of forward -looking

terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,

“intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of su ch words and phrases or state that certain

acts, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. All information

contained in this press release, other than statements of current and historical fact, is forward looking information. Forward-

looking information contained in this press release may include, without limitation, exploration plans, results of operations ,

expected performance at the Project, , the Company’s belief that the Tangana system will provid e considerable resource

expansion potential, that the Company will be able to mine the Tangana Mining Unit in an economic manner, and the expected

financial performance of the Company.

The following are some of the assumptions upon which forward-looking information is based: that general business and

economic conditions will not change in a material adverse manner; demand for, and stable or improving price for the

commodities we produce; receipt of regulatory and governmental approvals, pe rmits and renewals in a timely manner; that

the Company will not experience any material accident, labour dispute or failure of plant or equipment or other material

disruption in the Company’s operations at the Project and Nueva Recuperada Plant; the availability of financing for operations

and development; the Company’s ability to procure equipment and operating supplies in sufficient quantities and on a timely

basis; that the estimates of the resources at the Project and the geological, operational and pr ice assumptions on which these

and the Company’s operations are based are within reasonable bounds of accuracy (including with respect to size, grade and

recovery); the Company’s ability to attract and retain skilled personnel and directors; and the ability of management to execute

strategic goals.

- 5 -

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual

results, level of activity, performance or achievements of the Company, as the case may be, to be materially different from

those expressed or implied by such forward -looking information, including but not limited to those risks described in the

Company’s annual and interim MD&As and in its public documents filed on www.sedar.com from time to time. Forward -

looking statements are based on the opinions and estimates of management as of the date such statements are made. Although

the Company has attempted to identify import ant factors that could cause actual results to differ materially from those

contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or

intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-

looking information. The Company does not undertake to update any forward-looking information, except in accordance with

applicable securities laws.