Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AGMR.TO ·

Drill results returned silver-polymetallic intercepts in the main Sacasipuedes and Matacaballo vein, and various intervals in the Ayayay and Sorpresa veins, including: 4.20m

Drill Results

SILVER MOUNTAIN INTERSECTS SILVER-

POLYMETALLIC MINERALIZATION IN

MULTIPLE VEINS AT ITS RELIQUIAS MINE

/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR DISSEMINATION IN OR INTO

THE UNITED STATES

/

Highlights

Drill results returned silver-polymetallic intercepts in the main Sacasipuedes and

Matacaballo vein, and various intervals in the Ayayay and Sorpresa veins, including:

4.20m

@ 117.3 g/t Ag, 1.5% Pb, 2.1% Zn, 1.08% Cu, and 0.04 g/t Au in

Ayayay

vein, in drill

hole SMR-36-22-MTC

1.00m

@ 80.7 g/t Ag, 2.2% Pb, 2.9% Zn, 0.43% Cu, and 2.56 g/t Au, in

Sorpresa vein

, in

hole SMR-24-22-SCS, including

0.40m

@ 155.0 g/t Ag, 4.7% Pb, 6.5% Zn, 1.0% Cu, and 5.86 g/t Au

1.85m

@ 49.3 g/t Ag, 3.6% Pb, 2.8% Zn, 0.21% Cu, and 0.09 g/t Au, in

Sacasipuedes vein

,

hole SMR-22-22-SCS, including

0.45m

@ 162.0 g/t Ag, 10.5% Pb, 7.6% Zn, 0.78% Cu, and 0.22 g/t Au;

and

0.65m

@ 132.0 g/t Ag, 8.6% Pb, 9.3% Zn, 0.42% Cu, and 0.19 g/t Au, in

Ayayay vein

, in

same drill hole SMR-22-22-SCS

1.95m

@ 48.1 g/t Ag, 2.1% Pb, 4.5% Zn, 0.37% Cu, and 0.08 g/t Au, in

Sacasipuedes vein

,

in drill hole

SMR-26-22-SCS

TORONTO

,

Nov. 10, 2022

/CNW/ - Silver Mountain Resources Inc. (TSXV: AGMR) (OTCQB:

AGMRF) (BVL: AGMR) ("

Silver Mountain

", "

AGMR

" or the "

Company

") is pleased to provide an

update on its underground drilling at the Company's Reliquias silver mine in Huancavelica, central

Peru

. The drill program to date has surpassed a total of 16100 metres, drilled in 68 bore holes. The

assay results of 6 holes drilled to test the Sacasipuedes and Matacaballo veins are reported in this

release (Table 1). The main objective of the fully funded drill program is to establish a National

Instrument 43-101 –

Standards of Disclosure for Mineral Projects

("

NI 43-101

") compliant mineral

resource in H1 2023 that will form the basis of our production decision in H2 2023. In addition, the

Company aims to better characterize and extend the known silver-rich zones at depth.

1

Alfredo Bazo

, President and CEO, commented:

"The drill holes reported today are located in one of

the significant parts of the mineralized system. Apart from providing important data for the zone

where the Matacaballo and Sacasipuedes veins join, these holes also identified very promising

intercepts in the Ayayay and Sorpresa veins. Especially worth mentioning are the gold values in a

number of intercepts. A split of the Matacaballo vein encountered in hole SMR-36-22-MTC

returned 11.1 g/t Au, 33.2 g/t Ag, 1.3% Pb and 2.1% Zn over

0.65 m

down-hole. In hole SMR-21-

22-SCS, a drill interval of

0.45 m

showed an exceptional grade of 21.2 g/t Au, apparently related to

a separate mineralization phase, based on the lack of base metals in this particular intercept

."

_________________________________

1

For additional information in respect of the Castrovirreyna Project, please refer to the Company's technical report, titled National Instrument 43-101 Technical Report—

Castrovirreyna Project,

Peru

, dated

October 6, 2021

, amended

November 18, 2021

, effective date

August 17, 2021

, available on the Company's profile on

www.sedar.com

.

Figure1: Plan view of underground drilling program at the Reliquias silver mine, showing traces of

drill holes completed to date (in blue) as well as the subsequently programmed bore holes. The six

holes reported in this release are labelled and highlighted in bold blue lines. Additionally, underground

workings, main mineralized veins, and drill platforms are displayed. Inset map shows Reliquias

property block with locations of both silver mines and the processing plant. (CNW Group/Silver

Mountain Resources Inc.)

The following table shows the detailed results of mineralized intercepts encountered in the drill holes

reported in this news release.

Table 1: Weighted assay results of six drill holes testing the Sacasipuedes, Matacaballo, Ayayay,

and Sorpresa veins (CNW Group/Silver Mountain Resources Inc.)

Fig.2: Close-up view of mineralized intervals of drill core; photo A: brecciated quartz vein, locally

jigsaw texture, multiple vein generations, drusy quartz, disseminated sulphides, with minor carbonate

gangue, Sacasipuedes vein, hole SMR-28-22-SCS, 172.05 -172.32 m depth; photo B: sulphide-rich

interval of banded vein with multiple quartz vein generations, showing galena, sphalerite,

chalcopyrite, probable split of Matacaballo vein, hole SMR-36-22-MTC, 187.25 – 187.50 m depth.

(CNW Group/Silver Mountain Resources Inc.)

Fig.2: Close-up view of mineralized intervals of drill core; photo A: brecciated quartz vein, locally

jigsaw texture, multiple vein generations, drusy quartz, disseminated sulphides, with minor carbonate

gangue, Sacasipuedes vein, hole SMR-28-22-SCS, 172.05 -172.32 m depth; photo B: sulphide-rich

interval of banded vein with multiple quartz vein generations, showing galena, sphalerite,

chalcopyrite, probable split of Matacaballo vein, hole SMR-36-22-MTC, 187.25 – 187.50 m depth.

(CNW Group/Silver Mountain Resources Inc.)

Update Regarding Advertising Agreement

The Company previously announced that it had entered into an advertising agreement dated

September 12, 2022

(the "Advertising Agreement") with Gold Standard Media, LLC ("Gold

Standard"), whereby Gold Standard, together with certain of its affiliates, has agreed to provide

certain promotional and advertising services to the Company. The Advertising Agreement is

effective as of

February 2, 2022

and is valid until

February 2, 2024

. Pursuant to the Advertising

Agreement, Gold Standard commenced work on

September 12, 2022

by assisting the Company

with the creation of landing pages, native advertisements, email marketing, influencer endorsement

and publications for increasing awareness about the Company (collectively, the "Services"). The

Services are to be provided by Gold Standard together with its affiliates, Future Money Trends LLC,

Wealth Research Group LLC and Portfolio Wealth Global LLC (collectively, the "Service

Providers"). The Company wishes to clarify that it has pre-paid the Service Providers, for the

Services, in full, by paying

$1,000,000

in the first quarter of 2022 and

US$500,000

in June 2022.

Such fees are based on a monthly payment schedule pursuant to the terms of the Advertising

Agreement.

On Behalf of the Board of Directors of Silver Mountain Resources Inc.

Alfredo Bazo

, Chief Executive Officer and Director

Qualified Person

The scientific and technical information contained in this news release has been reviewed and

approved by

Antonio Cruz

, an independent consultant of the Company and a Qualified Person within

the meaning of NI 43-101.

About Silver Mountain

Silver Mountain Resources Inc. is a silver explorer and mine developer planning to restart production

at the Reliquias underground mine and undertake exploration activities at its prospective silver

camps at the Castrovirreyna Project in Huancavelica,

Peru

.

For additional information in respect of the Castrovirreyna Project, please refer to the Company's

technical report, titled National Instrument 43-101 Technical Report—Castrovirreyna Project,

Peru

,

dated

October 6, 2021

, amended

November 18, 2021

, effective date

August 17, 2021

, available at

https://sedar.com

.

For further information about our drill program, including cross sections of the main veins with drill

hole locations, please refer to our corporate presentation, available on our website at

www.agmr.ca

Silver Mountain's subsidiary Sociedad Minera Reliquias S.A.C. owns 100% of its concessions and

holds more than 27,000 hectares in the district of Castrovirreyna, Huancavelica,

Peru

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Sampling, QA/QC, and Analytical Procedures

Silver Mountain follows systematic and rigorous sampling and analytical protocols which meet

industry standards. These protocols are summarized below.

All drill holes are diamond core holes with HQ or NQ core diameters. Drill core is collected at the

underground drill site where recovery measurements are taken before the core is transported by

truck to the core logging facility at the Caudalosa Grande mine camp, where it is photographed and

geologically logged. The core is then cut in half with a diamond saw blade with half the sample

retained in the core box for future reference and the other half placed into a pre-labelled plastic bag,

sealed with a plastic zip tie, and identified with a unique sample number. The core is typically

sampled over a 1-2 metre sample interval unless the geologist determines the presence of an

important geological contact. The bagged samples are then stored in a secure area pending

shipment to a certified laboratory sample preparation facility. Samples are sent by batch to the ALS

laboratory in

Lima

for assay. Silver Mountain independently inserts certified control standards, fine

and coarse blanks, and duplicates into the sample stream to monitor data quality. These standards

are inserted "blindly" to the laboratory in the sample sequence prior to departure from the core

storage facilities. At the laboratory, samples are dried, crushed, and pulverized and then analyzed

using a fire assay-AA finish analysis for gold and a full multi-acid digestion with ICP-AES analysis for

other elements. Samples with results that exceed maximum detection values for the main elements

of interest (Ag, Zn, Pb, Cu) are re-analyzed using precise ore-grade ICP analytical techniques, while

high gold values are re-analyzed by fire assay with a gravimetric finish.

Forward Looking Statements

This news release contains forward-looking statements and forward-looking information within the

meaning of Canadian securities legislation (collectively, "

forward-looking statements

") that relate

to Silver Mountain's current expectations and views of future events. Any statements that express, or

involve discussions as to, expectations, beliefs, plans, objectives, assumptions or future events or

performance (often, but not always, through the use of words or phrases such as "will likely result",

"are expected to", "expects", "will continue", "is anticipated", "anticipates", "believes", "estimated",

"intends", "plans", "forecast", "projection", "strategy", "objective" and "outlook") are not historical

facts and may be forward-looking statements and may involve estimates, assumptions and

uncertainties which could cause actual results or outcomes to differ materially from those expressed

in such forward-looking statements. No assurance can be given that these expectations will prove to

be correct and such forward-looking statements included in this news release should not be unduly

relied upon. These statements speak only as of the date of this news release. Forward-looking

statements in this news release include, but are not limited to, statements in respect of the

Company's proposed exploration program and the timing and potential results thereof.

Forward-looking statements are based on a number of assumptions and are subject to a number of

risks and uncertainties, many of which are beyond Silver Mountain's control, which could cause

actual results and events to differ materially from those that are disclosed in or implied by such

forward-looking statements. Such risks and uncertainties include, but are not limited to, the factors

set forth under "

Forward-Looking Statements"

and "

Risk Factors

" in the Company's final prospectus

dated

January 26, 2022

, and other disclosure documents available on the Company's profile at

www.sedar.com

. Silver Mountain undertakes no obligation to update or revise any forward-looking

statements, whether as a result of new information, future events or otherwise, except as may be

required by law. New factors emerge from time to time, and it is not possible for Silver Mountain to

predict all of them or assess the impact of each such factor or the extent to which any factor, or

combination of factors, may cause results to differ materially from those contained in any forward-

looking statement. Any forward-looking statements contained in this news release are expressly

qualified in their entirety by this cautionary statement.

SOURCE

Silver Mountain Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/November2022/10/c7969.html

%SEDAR: 00052252E

For further information:

Alfredo Bazo, President, CEO & Director, [email protected]; Jean Pierre

Fort, Chief Financial Officer, [email protected]; Silver Mountain Resources Inc, 82 Richmond Street

East, Toronto, ON M5C 1P1, 647-262-4017, [email protected], www.agmr.ca

CO: Silver Mountain Resources Inc.

CNW 07:00e 10-NOV-22