Austral Gold Updates Mineral Resource Estimate at Casposo
Austral Gold Updates Mineral Resource
Estimate at Casposo
Sydney, Australia--(Newsfile Corp. - July 16, 2024) -
Established gold producer Austral Gold
Limited's (ASX: AGD) (TSXV: AGLD) (OTCQB: AGLDF)
(Austral or the Company) is pleased to
announce the positive results of its updated Mineral Resource Estimate prepared by independent
Qualified Person, Marcos Valencia FAusIMM in accordance with CIM Definitions 2014, National
Instrument 43-101 ("NI 43-101") and Joint Ore Reserves Committee Code, 2012 (JORC 2012) for the
Company's 100% owned Casposo-Manantiales Mine Complex in the province of San Juan, Argentina.
The updated Mineral Resource estimates will be supported by a technical report prepared in
accordance with NI 43-101 that will be filed on SEDAR (www.sedarplus.com) within 45 days of this news
release (the "Technical Report").
Summary of Mineral Resources Statement All Deposits - April 30, 2024
Measured + Indicated and Inferred
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Measured
15,600
3.89
92.39
5.04
1,949
46,338
2,528
Indicated
1,052,869
2.69
106.69
4.02
91,067
3,611,544
136,212
M + I
1,068,469
2.71
106.48
4.04
93,016
3,657,882
138,740
Inferred
662,291
5.02
65.74
5.85
106,961
1,399,848
124,459
Notes:
Per Table 14.15 below
Chief Executive Officer of Austral, Stabro Kasaneva commented
, "We are pleased to share the
new mineral resource update at Casposo. The consolidation of Casposo's mineral resource inventory
brings us closer to a decision on restarting mining operations. We plan to continue keeping our
stakeholders informed with further updates as we progress."
The updated estimates are based on Company drilling and exploration activities, which mostly occurred
between 2020 and 2022, as well as metallurgical test work on the Casposo project.
Table 14.15: Casposo Au-Ag deposit Mineral Resource Statement (April 30, 2024).
Summary of Mineral Resources Statement All Deposits - April 30, 2024
Measured + Indicated and Inferred
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
15,600
3.89
92.39
5.04
1,949
46,338
2,528
Indicated
332,174
4.00
65.53
4.82
42,677
699,810
51,425
M + I
347,774
3.99
66.73
4.83
44,626
746,148
53,953
Inferred
119,233
10.80
23.90
11.10
41,419
91,610
42,564
Underground
Measured
-
-
-
-
-
-
-
Indicated
346,692
2.98
181.20
5.25
33,240
2,019,758
58,486
M + I
346,692
2.98
181.20
5.25
33,240
2,019,758
58,486
Inferred
543,059
3.75
74.93
4.69
65,542
1,308,238
81,895
Stockpile
Measured
-
-
-
-
-
-
-
Indicated
374,003
1.26
74.18
2.19
15,151
891,975
26,301
M + I
374,003
1.26
74.18
2.19
15,151
891,975
26,301
Inferred
-
-
-
-
-
-
-
Notes:
Effective date April 30, 2024
Stationary domains were modelled according the lithological and structural continuities.
Mineral Resources were classified and reported in accordance with the NI 43-101.
Indicated Resources was declared under a grid pattern of 25 m in the strike direction and 25 m in the dip direction.
Mineral Resources are defined via optimization for open pit and stockpile.
A cut-off grade of 1.0 g/t AuEq was defined to mine Stockpiles.
A cut-off grade of 1.5 g/t AuEq was defined to Open Pit Mining Method.
A cut-off grade of 2.0 g/t AuEq was defined to Underground Mining Method beneath the open pit shells and optimized using the Vulcan
Stope Optimizer.
Metallurgical recoveries were applied by deposit.
Selective Mining Unit were defined and built according to the underground optimization. Dilution has been incorporated into the SMU.
A bulk density of 2.5 ton/m3 has been ap
plied to all domains in open pit and underground and 1.8 ton/m3 for stockpile.
Numbers may not add due to rounding.
Table 14.16: Casposo Au-Ag deposit Mineral Resource Statement by Deposit (April 30, 2024).
Mineral Resources Statement Measured + Indicated and Inferred - Manantiales
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
-
-
-
-
-
-
-
Indicated
21,017
4.85
27.82
5.19
3,275
18,798
3,509
M + I
21,017
4.85
27.82
5.19
3,275
18,798
3,509
Inferred
22,858
9.05
40.13
9.55
6,647
29,492
7,016
Underground
Measured
-
-
-
-
-
-
-
Indicated
8,612
4.37
12.29
4.53
1,211
3,404
1,254
M + I
8,612
4.37
12.29
4.53
1,211
3,404
1,254
Inferred
316,904
4.33
15.51
4.52
44,108
157,984
46,082
Mineral Resources Statement Measured + Indicated and Inferred - Mercado
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
-
-
-
-
-
-
-
Indicated
141,963
1.77
116.68
3.23
8,097
532,557
14,754
M + I
141,963
1.77
116.68
3.23
8,097
532,557
14,754
Inferred
5,978
2.21
17.99
2.43
425
3,457
468
Underground
Measured
-
-
-
-
-
-
-
Indicated
28,518
1.49
157.89
3.46
1,363
144,768
3,173
M + I
28,518
1.49
157.89
3.46
1,363
144,768
3,173
Inferred
17,177
2.28
68.94
3.14
1,257
38,072
1,733
Mineral Resources Statement Measured + Indicated and Inferred - Julieta
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
-
-
-
-
-
-
-
Indicated
169,194
5.76
27.29
6.10
31,305
148,455
33,161
M + I
169,194
5.76
27.29
6.10
31,305
148,455
33,161
I
nferred
90,397
11.82
20.18
12.07
34,347
58,661
35,080
Underground
Measured
-
-
-
-
-
-
-
Indicated
91,557
4.29
22.22
4.57
12,636
65,409
13,454
M + I
91,557
4.29
22.22
4.57
12,636
65,409
13,454
Inferred
23,047
5.11
24.44
5.42
3,788
18,108
4,014
Mineral Resources Statement Measured + Indicated and Inferred - B-Vein
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
15,600
3.89
92.39
5.04
1,949
46,338
2,528
Indicated
-
-
-
-
-
-
-
M + I
15,600
3.89
92.39
5.04
1,949
46,338
2,528
Inferred
-
-
-
-
-
-
-
Underground
Measured
15,600
3.89
92.39
5.04
1,949
46,338
2,528
Indicated
209,773
2.57
260.75
5.83
17,332
1,758,606
39,314
M + I
225,373
2.66
249.10
5.77
19,281
1,804,944
41,843
Inferred
121,885
2.59
221.93
5.36
10,141
869,679
21,012
Mineral Resources Statement Measured + Indicated and Inferred - Remaining Inca (2A + 2B + 2CD)
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
-
-
-
-
-
-
-
Indicated
-
-
-
-
-
-
-
M + I
-
-
-
-
-
-
-
Inferred
-
-
-
-
-
-
-
Underground
Measured
-
-
-
-
-
-
-
Indicated
8,231
2.63
179.76
4.88
697
47,571
1,292
M + I
8,231
2.63
179.76
4.88
697
47,571
1,292
Inferred
64,046
3.03
108.98
4.40
6,249
224,394
9,054
Mineral Resources Statement Measured + Indicated and Inferred - Stockpile
Classification
Tonnes
Grade
Contained Metal
(t)
(g/t Au)
(g/t Ag)
(g/t AuEq)
(oz Au)
(oz Ag)
(oz AuEq)
Open Pit
Measured
-
-
-
-
-
-
-
Indicated
374,003
1.26
74.18
2.19
15,151
891,975
26,301
M + I
374,003
1.26
74.18
2.19
15,151
891,975
26,301
Inferred
-
-
-
-
-
-
-
Underground
Measured
-
-
-
-
-
-
-
Indicated
-
-
-
-
-
-
-
M + I
-
-
-
-
-
-
-
Inferred
-
-
-
-
-
-
-
TECHNICAL CONTENT AND QUALIFIED PERSON
The Technical Report for the Casposo Mine referenced in this news release was prepared by Marcos
Valencia FAusIMM, Registered Member ChMC, an Independent "Qualified Person" as defined by NI 43-
101 (the "QP").
The scientific and technical information contained in this news release is extracted from
the Technical Report.
The Technical Report to support the updated Mineral Resource estimates for the
Casposo Mine, prepared in accordance with NI 43-101, will be filed on SEDAR+ (
www.sedarplus.ca
)
within 45 days of this news release.
COMPETENT PERSON'S STATEMENT
For the purposes of Listing Rule 5.22, the Company confirms that the updated Mineral Resource
estimate for the Casposo Mine was based on work reviewed or compiled by Marcos Valencia, an
independent "Qualified Person" as defined by NI 43-101 and a "Competent Person" as defined in the
JORC (2012) Code, either as a Member of the Australian Institute of Geoscientists, or members in good
standing of Recognised Professional Organisations in Canada and the United States.
The Competent Person is a consultant of Wampeso Holdings Inc.
The Competent Person consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
The Competent Person has sufficient experience which is relevant to the style of mineralisation and
types of deposits under consideration and to the activities undertaken to qualify as a Competent Person
as defined in the JORC (2012) Code.
Data Verification:
All information contained in this technical report was generated by Austral and was previously verified in
the technical report prepared by RPA in 2016. The scientific and technical information included in the
Technical Report, which forms the basis of this news release disclosure, was reviewed by the QP who
determined that the disclosure is in accordance with the guidelines established by the CIM and falls
under the requirements of NI 43-101 for publication to the market.
The data verification was carried out by taking the original information, comparing it with what was
reported in the 2016 technical report, and also reviewing the procedures that Austral applied during its
drilling and quality assurance activities.
All information captured and processing procedures and protocols have been developed to detect
deviations in the early stages of the process and to apply corrective measures for mitigation and to
minimize the sources of risk of failures in the information generated and declared as public.
A site visit was undertaken by the QP. However, it was not possible to oversee the drilling procedures
and processes for data collection. The QP reviewed the protocols and procedures and determined that
are in line with industry standards.
Analytical laboratories for the project have not been inspected at this stage. A thorough Quality
Assurance and Quality Control ("QA/QC") program adhering to internationally accepted standards was
completed for Austral drilling over the past phases. The QP is satisfied with the QA/QC methods
employed for the internal data validation and for the purpose of the mineral resource estimate.
The QP considers that the sample preparation, security, and analytical procedures adopted for the
resource drilling provide an adequate basis for the current mineral resource estimate and that the
QA/QC program and procedures developed by the Austral geology team and reviewed by the QP are
adequate.
The QP considers that the data contained in the drill hole database were generated and collected
according to the industrial standards and Austral applied proper programs to keep the security of the
data developed by the Austral geology team and reviewed by the QP.
Further information
For the purposes of listing Rule 5.8.1, the Company wishes to provide the following additional
information which is to be read together with the JORC (2012) Code Table 1 for the Mineral Resource
estimate.
Geology and Geological Interpretation
Casposo
The Casposo District is situated within the Cordillera Principal which runs along the border between
Argentina and Argentina for approximately 1,500 km in a volcanic and seismic active zone. Basement is
formed by Permian-Triassic rocks characterized by calk-alkaline affinity intrusive and volcanic rocks of
andesitic to rhyolitic composition regionally known as Choiyoi Group. These and younger Jurassic-
Cretaceous sediments were thickened by compression and trusting since the Late Cretaceous in a thin-
skinned fold trust belt.
In the Mine area, the Cordillera Frontal is underlain by marine metasediments (shales, sandstones, and
conglomerates) of La Puerta Formation (Carboniferous-Lower Permian). It correlates with the Agua
Negra Formation to the north.
The Casposo gold-silver mineralization occurs in both the rhyolite and underlying andesite, where it is
associated with banded quartz-chalcedony veins, typical of Low Sulphidation Epithermal environments.
Adularia in the main veins gives an age date of 280 ± 0.8 Ma (K/Ar), very close to the published age
dates for the andesite unit. Post-mineralization dykes, of rhyolitic, aphanitic-felsic and trachytic
compositions which affects all the deposits Manantiales, Julieta, Mercado and B-Vein often cut the vein
systems. These dykes, sometimes reaching up to 30 m thickness, are usually steeply dipping and north-
south oriented. The mineralization at Casposo is typical of a low sulfidation type and is interpreted to be
of a multi-stage, open space filling epithermal origin resulting in mineralized veins, hydrothermal
breccias, stockworks or veinlets.
About Austral Gold
Austral Gold is a growing gold and silver mining producer building a portfolio of quality assets in the
Americas. Austral continues to lay the foundation for its growth strategy by advancing its attractive
portfolio of producing and exploration assets. For more information, please visit the Company's website
at www.australgold.com.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Release approved by the Chief Executive Officer of Austral Gold, Stabro Kasaneva.
For additional information please contact:
Stabro Kasaneva
Chief Executive Officer
Austral Gold Limited
+56 9 9822 3563
Jose Bordogna
Chief Financial Officer
Austral Gold Limited
+61 466 892 307
Forward-Looking Statements
Statements in this news release that are not historical facts are forward-looking statements. Forward-
looking statements are statements that are not historical and consist primarily of projections - statements
regarding future plans, expectations and developments. Words such as "expects", "intends", "plans",
"may", "could", “potential”, "should", "anticipates", "likely", "believes" and words of similar import tend to
identify forward-looking statements. Forward-looking statements in this news release include in this
news release include the intention to file the Technical Report within 45 days of the news release, we
plan to continue keeping our stakeholders informed with further updates as we progress and, Austral
continues to lay the foundation for its growth strategy by advancing its attractive portfolio of producing
and exploration assets, the prospects for exploration and development of the Casposo Mine, and
mineralization prospects.
All of these forward-looking statements are subject to a variety of known and unknown risks,
uncertainties and other factors that could cause actual events or results to differ from those expressed or
implied, including, without limitation, uncertainty of exploration programs, development plans and cost
estimates, results of further exploration; commodity price fluctuations; political or economic instability
and regulatory changes; currency fluctuations, the state of the capital markets especially in light of the
effects of the novel coronavirus, uncertainty in the measurement of mineral resources and reserves and
other risks and hazards related to the exploration of a mineral property, and the availability of capital.
You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have
been used. Austral cannot assure you that actual events, performance or results will be consistent with
these forward-looking statements, and management’s assumptions may prove to be incorrect. Austral’s
forward-looking statements reflect current expectations regarding future events and operating
performance and speak only as of the date hereof and Austral does not assume any obligation to update
forward-looking statements if circumstances or management’s beliefs, expectations or opinions should
change other than as required by applicable law. For the reasons set forth above, you should not place
undue reliance on forward-looking statements.
JORC CODE (2012) TABLE 1
Section 3 Estimation and Reporting of Mineral Resources
Criteria
JORC Code explanation
Commentary
Database integrity
Measures taken to ensure that data has not
been corrupted by, for example, transcription or
keying errors, between its initial collection and
its use for Mineral Resource estimation
purposes.
Data validation procedures used.
Initial data collection was completed in MS
Excel, visual review and inspections using
formulas for errors were completed before import
into Vulcan. For drill hole validation to check for
issues such as overlapping intervals, missing
intervals and intervals beyond hole depth. The
validated data was protected and passed to a
server workspace to preserve the integrity of the
information in charge of the IT department and
controlled by the corporate database
administrator.
All lab assay data was imported into the
database and paired with sample data by
sample ID.
The final database was again validated in
Vulcan for overlapping intervals, intervals
beyond hole depth, non-consecutive intervals,
missing intervals etc. A visual inspection of drill
hole locations was completed.
Site visits
Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
If no site visits have been undertaken indicate
why this is the case.
A site visit was undertaken by the Competent
Person of this Technical Report between March
12
th
to 14
th
, 2024. The Competent Person has
been on site, and can review drill holes from
each deposit, and can develop a field visit to the
location of each deposit, which ones were
subject and matter of study in this report also.
Geological interpretation
Confidence in (or conversely, the uncertainty of)
the geological interpretation of the mineral
deposit.
Nature of the data used and of any assumptions
made.
The effect, if any, of alternative interpretations
on Mineral Resource estimation.
The use of geology in guiding and controlling
Mineral Resource estimation.
The factors affecting continuity both of grade
and geology.
Reasonable and well developed understanding
of geology and morphology of the
mineralization was stablished and it was done
using geological constrain to identify the
geological ore bodies using textures and metal
contents, further works were developed to a
better understanding of the mineralization based
on the hangingwall and footwall geological
features that commonly presents brecciation and
low grade mineralization in the Casposo Dacite
unit also, felsic and andesitic dikes cut the
mineralisation which is possible to follow at
different levels and sections. Outcrop of the
main veins and subordinated structures are well
exposed in surface and in oldest open pits and
in the underground. Faulting is well identified
and well understood of its actions in the main
ore bodies at this time. Some faults may
constrain the bounds of the mineralization and
offset it vertically and horizontally in places.
Dimensions
The extent and variability of the Mineral
Resource expressed as length (along strike or
otherwise), plan width, and depth below surface
to the upper and lower limits of the Mineral
Resource.
Resource block model ranges from surface to
approximately 600 m below surface over a strike
length ranging of approximately 700 m to 1000
m and from width length from 400 to 550 m.
Thickness of the structures are typically between
0.5 and 5 m.
Block Size: Parent: 2.5mx2.5mx2.5m and sub-
block 0.5mx0.5mx0.5m
Following tables indicate the Origin, Rotation and offset:
Deposit
Origin
X coord
Y coord
Z
coord
Manantiales
2,431,900
6,552,300
2,900
Julieta
2,434,050
6,551,300
3,050
Mercado
2,431,825
6,548.275
2,150
B-Vein
2,439,430
6,547,440
1,900
Deposit
Rotation
Bearing
Plunge
Dip
Manantiales
90
0
0
Julieta
45
0
0
Mercado
50
0
0
B-Vein
50
0
0
Deposit
Offset
X length
Y length
Z
length
Manantiales
400
700
700
Julieta
400
850
450
Mercado
500
900
450
B-Vein
550
1,000
600
Estimation and modelling
techniques
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of extreme
grade values, domaining, interpolation
parameters and maximum distance of
extrapolation from data points. If a computer
assisted estimation method was chosen include
a description of computer software and
parameters used.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate
takes appropriate account of such data.
The assumptions made regarding recovery of by-
products.
Estimation of deleterious elements or other non-
grade variables of economic significance (eg
sulphur for acid mine drainage characterisation).
In the case of block model interpolation, the
block size in relation to the average sample
spacing and the search employed.
Any assumptions behind modelling of selective
mining units.
Any assumptions about correlation between
variables.
Description of how geological interpretation
was used to control the resource estimates.
Discussion of basis for using or not using grade
cutting or capping.
The process of validation, the checking process
used, the comparison of model data to drill hole
data, and use of reconciliation data if available.
A detailed explanation of the estimation and
modelling techniques is given in Section 14 of
the technical report relating to this resource
estimate. It is not practical to describe all aspects
of the estimation in JORC Table 1.
Estimation was completed using block modelling
and ordinary kriging, these methods are
considered appropriate. Top cutting and high-
grade restrictions were applied by domains, hard
boundary to constrain the main geology feature
was applied to prevent smearing the high grades
into the low-grade area.
Vulcan software was used for 3D estimation and
geological modelling.
A Block model with the parent cell size
2.5 m x 2.5 m x 2.5 m and sub-cell size 0.5 m x
0.5 m x 0.5 m was generated over the deposit
area and restricted to wireframe models. Cell
size based on the approximate 25 to 30 m drill
spacing of mineralization. Sub blocking was
applied to better fit wireframe models.
A variable search geometry was used to follow
the strike and dip variations of the deposit where
it follows the geometry of the vein structures. A
semi-parametric variography model was applied
to the deposits.
A univariate estimate was completed.
Geology was used to separate the different
geological and stationary domains named as:
MQV: Massive Quartz Vein
BX: Hydrothermal breccia
VLT: Veinlet
Additional Kriging Parameters are as follows
defining 5 passes.
Interpolation was conducted at the
parent and sub-block scale
Discretization 4x4x4
Negative weights were not set to zero
Maximum of 1 composite and minimum
of 2 or 1 composites per drill hole to
estimate
Maximum of 6, 4, 2 or 1 composite per
search.
Search Radius:
Pass 1: 16 x 0.5 x 16 m
Pass 2: 32 x 0.5 x 32 m
Pass 3: 64 x 1.0 x 64 m
Pass 4: 80 x 1.0 x 80 m
Pass 5: 120 x 2.0 x 120 m.
The model was validated by visual inspection of
input and output data as well as statistical
validation using boundary analysis and
declustered mean comparison.
Moisture
Whether the tonnages are estimated on a dry
basis or with natural moisture, and the method
of determination of the moisture content.
Bulk density Is based on dry values
Cut-off parameters
The basis of the adopted cut-off grade(s) or
quality parameters applied.
Austral will process the material exploited in
their own plant facility and all the mineral
deposits are in the vicinity of the plant, with a
maximum distance of 5 km.
A cutoff grade is based on both metals and the
definition of income is based on gold equivalent
(AuEq). Prices used were USD $2,000 per oz
gold and USD $20 per oz silver. Recoveries were
applied according to the deposits (see chapter
13).
Open pit cut-off was defined as 1.5 gpt AuEq
and Underground cut-off was defined as 2.0 gpt
AuEq (for further details, see section 14.12).