Austral Gold Starts Near-Mine Silver Exploration in Chile
Austral Gold Starts Near-Mine Silver
Exploration in Chile
HIGHLIGHTS
Austral Gold has commenced a phased exploration program at its Silver Juncal Project located
~35 km southeast of the 100%-owned Amancaya Mine, near the Guanaco Plant.
Phase 1 (March-April 2026): Geological mapping and >1,000 m of channel sampling using
diamond-blade rock saw.
Phase 2 (Q2 2026): Ground magnetics and induced polarization (IP) surveys to support drill target
definition.
Phase 3 (Q3 2026): Targeting 10,000 metres of Reverse Circulation (RC) drilling using in-house
equipment to test priority targets.
Sydney, Australia--(Newsfile Corp. - March 11, 2026) -
Austral Gold Limited
("Austral" or the
"Company") (ASX: AGD) (TSXV: AGLD) (OTCQB: AGLDF), an established gold producer, is pleased
to announce that it has commenced a phased exploration program at its 100%-owned Juncal Project
("Juncal" or the "Project") in Chile, as part of its strategy to focus on near-mine targets.
Austral Gold's CEO, Stabro Kasaneva said:
"With funding from the placement completed on 23
February 2026, we are pleased to begin our phased exploration program at the Juncal Project in Chile.
This program is an important step towards advancing our exploration objectives, helping refine drill
targets, assess potential satellite targets for our Guanaco operation, and build momentum across our
regional portfolio. We also expect to announce shortly the commencement of phased exploration
programs at Casposo in Argentina."
Juncal Background
Austral acquired Juncal from TSX and NASDAQ listed SSR Mining in 2016. The Project is part of the
Company's exploration portfolio in the Paleocene Belt of northern Chile and covers approximately 2,100
hectares. It is located about 70 km south of the Guanaco Mine and 35 km east of the 100% owned
Amancaya Mine. The Project is subject to a 1% Net Smelter Return (NSR) held by Nasdaq and TSXV
listed Elemental Royalty Corporation.
Juncal hosts intermediate to low-sulphidation (IS-LS) epithermal veins within a Paleocene–Eocene
andesitic volcanic sequence intruded by a 45 Ma dioritic body and rhyolitic sub-volcanic bodies dated at
43.8 ± 0.4 Ma. Veins generally strike north-northeast (NNE), with adularia dating
40
Ar/
39
Ar ages of 42.4
± 0.28 Ma.
The geological studies indicate low erosion levels, suggesting the vein systems may preserve gold (Au)
and silver (Ag) mineralisation at depth. Limited historical and artisanal mining were recorded on two of
the eleven mapped vein systems. Surface mineralogy also supports the interpretation of shallow
exposure and the potential for preserved mineralised horizons at depth.
Exploration Program
Phase 1
-
March-April 2026
Detailed surface geological mapping
Systematic channel sampling (>1,000 metres) using a diamond-blade rock saw
Maximum sample length: 1.0 metre
Objective: confirm grades identified during reconnaissance and refine structural interpretations
Phase 2 - Q2 2026 (June 30)
Ground magnetics and induced polarization (IP)
Designed to complement Phase 1 work and support drill target generation
Focus on structures hosting Au-Ag geochemical anomalies
Phase 3 - Q3 2026 (September 30)
Targeting 10,000 metres of Reverse Circulation (RC) using in-house equipment
Drilling to test down-dip extensions of mapped structures and evaluate potential blind mineralised
zones identified in earlier phases
Figure 1: Juncal Project location
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/690/288189_0592cf5774a52aa0_002full.jpg
Competent Person
The information in this announcement is based on, and fairly represents, information and supporting
documentation prepared by Marcos Valencia, a Qualified Person as defined by the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012) and NI
43-101.
Mr Valencia is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), No. 323676
and a Registered Member of the Chilean Mining Commission (No. 432). Mr. Valencia is an employee of
Austral Gold Limited and is not independent of the Company. He has sufficient experience relevant to
the style of mineralisation, type of deposit, and activity undertaken to qualify as a Competent
Person/Qualified Person.
Mr Valencia consents to the inclusion in this release in the form and context in which it appears.
About Austral Gold
Austral Gold is a growing gold and silver mining producer building a portfolio of quality assets in the
Americas based on three strategic pillars: production, exploration and equity investments. Austral
continues to lay the foundation for its growth strategy by advancing its attractive portfolio of producing
and exploration assets. Under its equity investments pillar, Austral holds shares in ASX-listed Unico
Silver.
For more information, please visit the Company's website at
www.australgold.com.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Release approved on behalf of the Board by the Chief Executive Officer, Stabro Kasaneva.
For additional information please contact:
David Hwang
Jose Bordogna, CFA
Joint Company Secretary
Chief Financial Officer and Joint Company
Secretary
Austral Gold Limited
Austral Gold Limited
+61 433 292 290
+61 466 892 307
Forward-Looking Statements
Statements in this news release that are not historical facts are forward-looking statements. Forward-
looking statements are statements that are not historical, and consist primarily of projections and
statements regarding future plans, expectations and developments. Words such as "expects", "intends",
"plans", "may", "could", "potential", "should", "anticipates", "likely", "believes" and words of similar
expressions are intended to identify forward-looking statements. The forward-looking statement in this
news release include, but are not limited to statements regarding the Company's planned exploration
activities, expected timing and phases of the exploration program, potential mineralisation, anticipated
outcomes of exploration work, future drilling plans, and the Company's strategic objectives.
All of these forward-looking statements are subject to a variety of known and unknown risks,
uncertainties and other factors that could cause actual events or results to differ from those expressed or
implied, including, without limitation, uncertainty of exploration programs, development plans and cost
estimates, commodity price fluctuations; political or economic instability and regulatory changes;
currency fluctuations, the state of the capital markets, uncertainty in the measurement of mineral
resources and reserves; and other risks and hazards related to the exploitation and development of
mineral properties, as well as the availability of capital. You are cautioned that the foregoing list is not
exhaustive of all factors and assumptions which may have been used. Austral cannot assure you that
actual events, performance or results will be consistent with these forward-looking statements, and
management's assumptions may prove to be incorrect. Austral's forward-looking statements reflect
current expectations regarding future events and operating performance and speak only as of the date
hereof and Austral does not assume any obligation to update forward-looking statements if
circumstances or management's beliefs, expectations or opinions should change other than as required
by applicable law. For the reasons set forth above, you should not place undue reliance on forward-
looking statements.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/288189