Austral Gold Receives Final Infill Drilling Assays at Amancaya Project (Chile): Intersects 3.1 m Grading 58.93 g/t Gold

Drill Results

Austral Gold Receives Final Infill Drilling Assays at

Amancaya Project (Chile): Intersects 3.1 m Grading

58.93 g/t Gold

VANCOUVER, BRITISH COLUMBIA--(Newsfile – January 25, 2017) Austral Gold Limited (ASX:

AGD) (TSX-V:AGLD) (the "Company" or "Austral") is pleased to announce the final batch of

assay results from the infill drilling program at its 100% owned high grade gold and silver

Amancaya project (“Amancaya”) located in Chile.

 Two new high grade shoots discovered.

 High grade zone of Central Vein extended by approximately 400 metres.

 Infill drilling program project complete – 13,312 metres drilled and all assays received and

reported.

 Results will be used to finalise pre-feasibility study for Amancaya in Q1 2017.

The infill program, which commenced on September 8 th, 2016, targeted the Central and Julia

veins, which host the gold and silver epithermal inferred resource that is the focus of an ongoing

pre-feasibility study expected to be completed by the first quarter of 2017.

Amancaya is located 60 km southwest of the Company’s Guanaco underground gold mine, which

is approximately 220 km from Antofagasta in northern Chile.

Highlights from these reported assays:

 AM-082: 3.1 metres @ 58.93 g/t gold and 94.7 g/t silver from 72.4 metres,

 AM-053: 3 metres @ 45.48 g/t gold and 966.70 g/t silver from 132 metres,

 AM-055: 6.7 metres @ 14.6 g/t gold and 83.2 g/t silver from 20 metres, plus

4.4 metres @ 11.65 g/t gold and 62.8 g/t silver from 45.2 metres,

 AM-067: 1.77 metres @ 49.41 g/t gold and 61.6 g/t silver from 170.2 metres

 AM-052: 3 metres @ 24.69 g/t gold and 363.7 g/t silver from 102 metres

“We are very pleased with the results from the infill program, which has significantly extended the

high grade zones on the Central Vein, with the discovery of two new high grade shoots. The

significant expansion and consistency of the high grade mineralisation exhibited from this drilling

at the Central Vein is extremely encouraging”, stated Stabro Kasaneva, CEO of Austral Gold.

“The high grade and continuity of the mineralisation indicate that Amancaya may have the

potential to be a very significant part of Austral’s future plans to grow production into a medium

sized precious metal producer. We are looking forward to seeing the results of this drilling

incorporated into a new independent mineral resource estimate and pre-feasibility study, which

should be completed prior to the end of the first quarter, 2017.”

The infill program of approximately 13,312 m was completed on November 30 th, 2016. A total of

93 holes were drilled, most of which were initially drilled with reverse circulation collaring and

converted to diamond drilling as they approached the vein target areas. This resulted in

approximately 87% of the drilled metres being comprised of reverse circulation, and 13%

represented as diamond drilling. Assay results for the final 44 of these holes, on the Central and

Julia Vein, have been received and are reported in this news release.

The drill program was designed to test and confirm the presence and consistency of

mineralisation within the inferred resource that was previously reported at Amancaya in the

amended Technical Report (“Amancaya Technical Report”) “Guanaco Gold Project, Antofagasta

Province, Region II, Chile, NI 43-101 Technical Report”, which has an effective date of November

24, 2015 and which was amended June 30, 2016 and filed on July 25, 2016 on the Company’s

profile on www.sedar.com.

Summary of significant results from the drilling with assays from the final 44 holes:

HOLE Id Location From To

Total

Length

True

Width* Au g/t Ag g/t

(m) (m)

AM-050 Central vein 139.94 142.32 2.38 1.55 13.63 182.8

AM-051 Central vein 89.00 94.00 5.00 3.50 9.04 89.2

AM-052 Central vein 102.00 105.00 3.00 2.10 24.69 363.7

AM-053 Central vein 132.00 135.00 3.00 2.16 45.48 966.7

AM-054 Central vein 44.47 50.42 5.95 3.87 10.35 65.9

AM-055 Central vein

20.00 26.70 6.70 4.69 14.60 83.2

29.90 31.28 1.38 0.97 2.24 4.1

45.24 49.70 4.46 3.12 11.65 62.8

52.05 52.74 0.69 0.48 19.51 47.3

AM-056 Central vein 151.97 163.85 11.88 7.72 3.24 9.5

AM-058 Central vein 209.23 211.00 1.77 1.24 6.24 11.4

AM-060 Central vein 77.60 80.39 2.79 1.81 13.54 96.2

AM-061 Central vein 20.00 24.00 4.00 2.60 7.14 64.4

AM-062 Central vein 45.00 46.13 1.13 0.73 3.03 22.6

AM-065 Central vein 86.00 88.00 2.00 1.30 4.05 10.9

114.00 116.00 2.00 1.30 2.52 10.6

AM-066 Central Vein 163.00 165.00 2.00 1.30 9.20 17.6

AM-067 Central vein 170.23 172.00 1.77 1.15 49.41 61.6

AM-068 Julia vein 155.09 156.09 1.00 0.65 16.89 12.9

AM-069 Julia vein 126.00 127.00 1.00 0.65 1.87 3.6

AM-070 Julia vein 85.60 86.50 0.90 0.59 1.75 6.6

AM-071 Julia vein 126.15 127.50 1.35 0.94 1.85 1.2

AM-072 Julia vein 161.00 162.00 1.00 0.70 4.60 3.9

AM-073 Julia vein 155.81 157.00 1.19 0.83 1.88 0.6

AM-075 Julia vein 87.00 90.00 3.00 2.10 8.40 5.7

AM-076 Julia vein 70.00 71.00 1.00 0.70 1.21 1.1

AM-077 Julia vein 159.00 160.00 1.00 0.70 1.91 2.8

AM-078 Julia vein 147.06 147.72 0.66 0.46 6.29 6.8

AM-079 Julia vein 87.20 87.60 0.40 0.28 1.42 3.0

AM-080 Central vein 37.23 37.85 0.62 0.43 2.48 48.4

AM-081 Julia vein 136.00 139.00 3.00 2.10 4.08 7.9

AM-082 Central vein 72.42 75.50 3.08 2.16 58.93 94.7

77.31 78.60 1.29 0.90 2.10 3.4

AM-083 Central vein 121.22 123.31 2.09 1.46 3.01 4.7

AM-084 Julia vein 155.00 159.00 4.00 2.80 3.31 2.3

AM-085 Julia vein 66.00 68.00 2.00 1.40 1.35 3.9

AM-086 Julia vein 174.00 180.55 6.55 4.59 5.04 4.2

AM-087 Julia vein 104.05 105.75 1.70 1.19 1.80 5.4

AM-088 Central vein 63.00 64.59 1.59 1.11 6.92 44.2

118.06 125.51 7.45 5.22 6.16 41.6

incl. 121.97 125.51 3.54 2.48 11.07 66.2

AM-089 Julia vein 159.00 160.00 1.00 0.70 1.55 5.2

AM-091 Julia vein 114.15 114.80 0.65 0.45 3.12 5.9

AM-092 Julia vein 66.70 71.00 4.30 3.01 7.05 26.2

AM-093 Julia vein 98.00 100.00 2.00 1.40 4.36 6.8

*True width refers to horizontal width and is inferred as being 70% of the down-hole intercept, although

ranges from 65-89% subject to intersection with sub-vertical veins and drilling dip.

Holes not listed above had no significant results.

The Central Vein

The Central Vein is the principal vein at the project, hosting the majority of the resource

discovered to date. The drilling program was focused on narrowing drill spacing within the known

mineralisation (Figure 2) in order to maximize the chances of upgrading inferred resources to

indicated resources for the ongoing pre-feasibility study. It was very successful identifying two

new high grade shoots and broadening an existing high grade shoot. The most significant of

these new shoots is located in the northern half of the vein. This shoot plunges gently to the north

and is essentially horizontal, with a strike length of approximately 500 metres (see Figure 4). Hole

AM067 (1.77 metres at 49.41 g/t gold and 61.6 g/t silver ) intercepted a new high grade zone,

that appears open at depth following the southerly plunge. The drilling also broadened the

existing higher grade zone that plunges more steeply south in the southern half of the vein

(compare Figure 3 and 4).

The Julia Vein

A modest exploration resource existed at Julia and this was not included in the Amancaya

Technical Report (see Figure 6). Figure 4 shows the location of infill drilling undertaken in this

program, which has identified higher grade mineralisation within a broad, gently north plunging

mineralized zone (see Figure 7). Mineralisation remains open at depth to the north down plunge.

Development Update

The Company has been advancing site activities at Amancaya in preparation for pre-stripping

and potential open pit mining by mid-2017. As previ ously stated, the company is envisioning

trucking mineralized material 73 kilometres on existing public roads to the new agitation leach

plant at Guanaco, which is expected to commence commissioning tests by the end of the first

quarter of 2017. The Amancaya project is fully per mitted and currently the estimated capital costs

for construction are envisioned to be funded from ca sh flow from operations from the Company’s

treasury. A pre-feasibility study, currently bei ng undertaken by Roscoe Postle & Associates, is

expected to be completed by the end of first quarter of 2017, covering the potential combined

operation of Amancaya and Guanaco mines with all material being treated in the new agitation

leach plant at Guanaco.

Figure 1: Amancaya Project Location

Figure 2: Central Vein Drilling Plan and Reported Results

Figure 3: Long section of Central Vein Prior to Infill Drill Program: Gold (g/t) x true width Contours

Figure 4: Long section of Central Vein Including Infill Drill Program: Gold (g/t) x true width Contours 

Figure 5: Julia Vein Drilling Plan and Reported Results

Figure 6: Long section of Julia Vein Prior to Infill Drill Program: Gold (g/t) x width Contours 

Figure 7: Long section of Julia Vein Including Infill Drill Program: Gold (g/t) x width Contours