Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AGI.TO ·

Alamos Gold Reports Best Intersection from Surface Directional Drilling

Drill Results

ALAMOS GOLD INC.

Brookfield Place, 181 Bay Street, Suite 3910, P.O. Box #823

Toronto, Ontario, Canada M5J 2T3

Telephone: (416) 368-9932 or 1 (866) 788-8801

All amounts are in United States dollars, unless otherwise stated.

FOR IMMEDIATE RELEAS E

WEBSITE: www.alamosgold.com TRADING SYMBOL: TSX:AGI NYSE:AGI

Alamos Gold Reports Best Intersection from Surface Directional Drilling

Program Further Extending High-Grade Mineralization at Island Gold Mine

Toronto, Ontario (November 5, 2018) – Alamos Gold Inc. (TSX:AGI; NYSE:AGI) (“Alamos” or

the “Company”) today reported new results from surface and underground exploration drilling

at the Island Gold Mine from the second half of 2018. Ongoing drilling continues to extend high-

grade gold mineral ization along-strike and down -plunge from existing Mineral Reserves and

Resources across all three main areas of focus: the Main Extension, the Eastern Extension,

and the Western Extension. All reported drill widths are true width of the mineralized zones ,

unless otherwise stated.

• Main Extension: best surface directional drilling intersection to date (MH13)

extending high- grade gold mineralization 60 metres (“m”) east of the nearest

intersection. High-grade mineralization now extends nearly 1,000 m ea st of current

mine workings and remains open to the east and down-plunge. New highlights include:

• 118.58 g/t Au (39.99 g/t cut) over 6.66 m;

• 21.50 g/t Au (13.70 g/t cut) over 7.80 m; and

• 31.70 g/t Au (14.51 g/t cut) over 3.81 m.

• Western Extension: high- grade mineralization extended laterally and down -

plunge from existing Inferred Mineral Resources. New highlights include:

• 78.26 g/t Au (67.74 g/t cut) over 2.29 m; and

• 19.69 g/t Au (19.69 g/t cut) over 2.79 m.

• Eastern Extension: high-grade mineralization extended below and east of existing

Inferred and Indicated M ineral Resources and remains open down- plunge. New

highlights include:

• 46.13 g/t Au (44.17 g/t cut) over 2.83 m; and

• 13.72 g/t Au (13.72 g/t cut) over 7.60 m.

Note: Drillhole composite intervals reported as “cut” may include higher grade samples which have been cut to 225

g/t Au, 100 g/t Au, or 80g/t Au depending on the zone. Refer to drill hole composite interval summary tables in this

release for more information.

“Island Gold continues to impress. In less than a year since we acquired the mine, we’ve seen

a 17% increase in Mineral Reserve grades and significant growth in Mineral Reserves and

Resources across all categories. Ongoing exploration success across all th ree extensions of

the ore body, including the best surface directional hole drilled to date, demonstrate strong

potential for this to continue,” said John A. McCluskey, President and Chief Executive Officer.

TRADING SYMBOL: TSX: AGI NYSE:AGI

2 | ALAMOS GOLD INC

2018 Drilling Program – Island Gold Mine

The focus of the 2018 exploration drilling program is to expand the down- plunge and lateral

extensions of the Island Gold deposit with the objective of adding new near mine Mineral

Resources. Drilling continues to be conducted across three main areas of focus along the two-

kilometre long Island Gold Main Zone including; the Main Extension; the Eastern Extension;

and the Western Extension (Figure 1).

Year-to-date drilling has been successful in extending high grade gold mineralization across all

three areas resulting in significant growth in both Mineral Reserves and Resources as detailed

in the mid-year 2018 update (see press release dated September 5, 2018). Since the acquisition

of Island Gold in November 2017, Mineral Reserves have increased 28%, or 207,000 ounces,

net of mining depletion, and Mineral Reserve grades have increase 17% to 10.69 g/t Au.

Measured and Indicated Mineral Resources have also increased 142%, or 130,000 ounces,

and Inferred Mineral Resources have increased 18%, or 184,000 ounces.

A total of 102,500 m of drilling in 556 holes was completed during the first three quarters of

2018, including 37,100 m since the mid-year Mineral Reserve and Resource update. Year-to-

date drilling has included 37,200 m of surface directional exploration drilling, 2,700 m of regional

exploration drilling and 22,800 m of underground exploration drilling . New highlight intercepts

since the mid-year Mineral Reserve and Resource update can be found in Figures 1 to 4 and

Tables 1 to 3 at the end of this release.

A further 42,900 m of drilling has been budgeted for the remainder of 2018 with the primary

objective of extending high grade mineralization and adding near -mine Mineral Resources

across all three areas of focus. A significant portion of the surface expl oration drilling in the

second half of 2018 is either too broadly spaced to define Inferred Mineral Resources or focused

on regional targets.

2018 Drilling Program – Island Gold Mine

Main Extension

As detailed in the mid-year 2018 Mineral Reserve and Resource update, a total of 390,000

ounces of Inferred Mineral Resources were added within the Main Extension area. The bulk of

the increase was down-plunge from existing mine workings where gold mineralization has been

extended nearly 1 kilometre. Exploration drilling continues to target the lateral and down-plunge

continuation of gold mineralization below existing Mineral Reserves and outside of the Inferred

Mineral Resources reported in the mid- year Mineral Reserve and Resource update . Drilling

since the June 30, 2018 update has been successful in further extending gold mineralization

with a drill hole spacing ranging from 75 to 100 m (Figure 2). Highlights from the new drill results

include (Table 1):

• 118.58 g/t Au (39.99 g/t cut) over 6.66 m (MH13);

• 21.50 g/t Au (13.70 g/t cut) over 7.80 m (MH12-2);

• 31.70 g/t Au (14.51 g/t cut) over 3.81 m (MH9-12);

• 9.67 g/t Au (9.67 g/t cut) over 4.60 m (MH10-10); and

• 15.08 g/t Au (15.08 g/t cut) over 2.66 m (MH12-1).

This east-plunging high-grade ore shoot remains open both laterally and down- plunge. Drill

holes MH12-1 and MH12-2 are of particular interest because the intersections confirm that gold

mineralization extends vertically below a currently known Inferred Mineral R esource block

containing 372,600 ounces grading 10.22 g/t Au.

TRADING SYMBOL: TSX: AGI NYSE:AGI

3 | ALAMOS GOLD INC

Hole MH13 is also significant in that it returned the best intersection to date from the surface

directional drilling program at 118.58 g/t Au ( 39.99 g/t cut) over 6.66 m . It also confirms

extension of the high-grade mineralization to the east with the nearest previously drilled

intersection located 60 m to the west.

The ongoing exploration program is focused on further extending high-grade mineralization with

the objective of defining additional Mineral Resources. Four diamond drill rigs are active in the

Main Extension target area.

Western Extension

Surface drilling in the Western Extension area (Figure 3) was successful in adding 30 ,000

ounces of Inferred Mineral Resources as reported in the mid-year Mineral Reserve and

Resource update with only two holes completed during the first half of the year . Drilling

completed since then has continued to extend high- grade mineralization laterally and down-

plunge from existing Inferred Mineral Resources.

Highlights from the new drill results include (Table 1):

• 78.26 g/t Au (67.74 g/t cut) over 2.29 m (MH7-5);

• 19.69 g/t Au (19.69 g/t cut) over 2.79 m (MH5-7); and

• 13.11 g/t Au (13.11 g/t cut) over 2.44 m (MH4-8);

Holes MH5-7 and MH7-5 confirmed that gold mineralization is present between two previously

defined Inferred Mineral R esource blocks. The Company has two drill rig s focused on the

Western Extension area using 75 to 100 m spaced step -out drilling with the ob jective of

expanding the high-grade mineralization where it remains open both laterally and down-plunge.

Eastern Extension

An objective of the 2018 underground exploration drilling program is to expand the high-grade

zone defined from exploration drifts established at the eastern extent of the Island Gold Mine

underground infrastructure (Figure 4). Drilling during the first half of the year was successful in

adding 77,000 ounces of Indicated Mineral Resources. Since then, drilling from the 620

exploration drift has continued to intersect high-grade mineralization at depth and to the east.

Highlights from the new results include (Table 2):

• 46.13 g/t Au (44.17 g/t cut) over 2.83 m (620-605-06); and

• 13.72 g/t Au (13.72 g/t cut) over 7.60 m (620-605-04).

Hole 620-605-06 is the eastern most hole drilled at depth from the 620-level. It intersected high-

grade gold values (44.17 g/t Au cut over 2.83 m) between existing Mineral Resource blocks in

the Eastern portion of the Island Gold Mine (between the 340 and 840 levels ) and previously

reported high grade intersections from surface drill holes drilled further to the east , (Figure 4),

which include:

• 17.85 g/t Au (14.25 g/t cut) over 2.18m (GD-620-01);

• 57.43 g/t Au (25.37 g/t cut) over 4.37 m (GD-630-01);

• 18.03 g/t Au (14.16 g/t cut) over 11.53m (GD-640-05);

• 15.20 g/t Au (8.16 g/t cut) over 2.06 m (GD-640-04); and

TRADING SYMBOL: TSX: AGI NYSE:AGI

4 | ALAMOS GOLD INC

• 43.26 g/t Au (11.72 g/t cut) over 2.13m (GD-640-05-5).

Drilling will continue to test this area for the balance of the year from underground drill bays

established on the 620-level exploration drift. In addition, directional drilling from surface is also

planned in the Eastern Extension area between 850 and 1150 m vertical depth to further explore

this area which cannot be drilled from existing underground exploration drifts.

Underground Delineation Drilling

Underground delineation drilling is also being carried out from the 620 and 840 levels with the

focus on converting Inferred Mineral Resources to Indicated Mineral Resources.

New highlight drill intercepts include (Table 3):

• 84.02 g/t Au (28.71 g/t cut) over 2.61 m (620-574-51);

• 23.53 g/t Au (23.53 g/t cut) over 2.79 m (840-542-02);

• 17.20 g/t Au (17.20 g/t cut) over 2.60 m (840-542-09);

• 16.46 g/t Au (16.46 g/t cut) over 2.52 m (840-542-13); and

• 16.05 g/t Au (16.05 g/t cut) over 4.76 m (840-542-22).

The results from the infill definition drilling within existing Inferred Mineral Resource block s

confirm the continuity of the high -grade gold mineralization and are expected to support the

conversion of the Mineral Resources in these areas.

Other Zones

The Island Gold Deposit consists of a number of subparallel mineralized zones, with the majority

of Mineral Reserves and Resources being defined in the C Zone and E1E Zones which

constitutes the main production horizons at the Island Gold mine. Highlights of new

intersections in parallel zones and zones in which the lateral continuity is not yet established

(“Unknown”) include (reported composite intervals are core lengths):

• 127.16 g/t Au (73.66 g/t cut) over 3.10 m (620-598-18);

• 34.25 g/t Au (18.06 g/t cut) over 3.71 m (620-598-10);

• 11.88 g/t Au (10.84 g/t cut) over 3.78 m (620-598-03);

• 16.17 g/t Au (15.36 g/t cut) over 2.69 m (620-604-06); and

• 11.46 g/t Au (11.46 g/t cut) over 3.61 m (620-598-15).

Additional drilling will be required to further evaluate these high -grade intersections and their

potential in both the footwall and hanging wall of the main C and E1E Zones.

Surface Regional Exploration Drilling

A 12,000 m regional exploration drill prog ram commenced in September to drill test targets

along the Goudreau Deformation Zone to the west of the main Island Gold Mine deposit. Drilling

is also planned to test a previous high -grade intercept of 9.71 g/t Au over 5.95 m below the

Kremzar gold deposit.

Qualified Persons

Chris Bostwick, FAusIMM, Alamos Gold’s Vice President, Technical Services, has reviewed

and approved the scientific and technical information contained in this news release. Chris

TRADING SYMBOL: TSX: AGI NYSE:AGI

5 | ALAMOS GOLD INC

Bostwick is a Qualified Person within the meaning of Canadian Secur ities Administrator’s

National Instrument 43-101 (“NI 43-101”).

Exploration programs at the Island Gold Mine are directed by Raynald Vincent, P.Eng., M.G.P.,

Chief Geologist at the Island Gold M ine and a Qualified Person within the meaning of NI 43-

101.

Quality Control

Assays for the delineation and exploration drilling were completed at LabExpert in Rouyn-

Noranda, Quebec. The Corporation inserts at regular intervals quality control (QC) samples

(blanks and reference materials) to monitor laboratory performance. Cross check assays are

done on a regular basis in a second accredited laboratory. The Quality Assurance / Quality

Control procedures are more completely described in the Technical Report filed on Sedar by

Richmont Mines, July 13, 2017.

Upcoming Catalysts and News Flow

• Q4 2018 – La Yaqui Grande EIA Submission

• Q4 2018 – Cerro Pelon EIA Approval

• Q1 2019 – Q4 2018 Production and 2019 Guidance

• Q1 2019 – Q4 2018 Earnings and 2018 Mineral Reserve and Resource Update

• Q1 2019 – Lynn Lake Optimization Study

• H1 2019 – End of 5% NSR Royalty at Mulatos

• Q2 2019 – Island Gold Exploration Update

• Q2 2019 – La Yaqui Grande EIA Approval

About Alamos

Alamos is a Canadian-based intermediate gold producer with diversified production from four

operating mines in North America. This includes the Young-Davidson and Island Gold mines in

northern Ontario, Canada and the Mulatos and El Chanate mines in Sonora State, Mexico.

Additionally, the Company has a significant portfolio of development stage projects in Canada,

Mexico, Turkey, and the United States. Alamos employs more than 1,700 people and is

committed to the highest standards of sustainable development. The Company’s shares are

traded on the TSX and NYSE under the symbol “AGI”.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Scott K. Parsons

Vice President, Investor Relations

(416) 368-9932 x 5439

The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this

release.

Cautionary Note

This News Release includes certain statements that constitute forward-looking information within the meaning of applicable

securities laws "forward-looking statements". All statements in this news release, other than statements of historical fact,

which address events, results, outcomes or developments that Alamos expects to occur are “forward-looking statements”.

Forward-looking statements are generally, but not always, identified by the use of forward- looking terminology such as

TRADING SYMBOL: TSX: AGI NYSE:AGI

6 | ALAMOS GOLD INC

"expects", is expected", "anticipates", "plans" or “is planned”, “trends”, "estimates", "intends" or “potential” or variations of

such words and phrases and similar expressions or statements that certain actions, events or results "may", "could",

"would", "might" or "will" be taken, occur or be achieved or the negative connotation of such terms. Forward- looking

statements in this news release include the statements with respect to planned exploration programs, costs and

expenditures, changes in Mineral Resources and conversion of M ineral Resources to Proven and Probable Mineral

Reserves, and other information that is based on forecasts and projections of future operational, geological or financial

results, estimates of amounts not yet determinable and assumptions of management.

Exploration results that include geophysics, sampling, and drill results on wide spacings may not be indicative of the

occurrence of a mineral deposit. Such results do not provide assurance that further work will establish sufficient grade,

continuity, metallurgical characteristics and economic potential to be classed as a category of Mineral Resource. A Mineral

Resource that is classified as "Inferred" or "Indicated" has a great amount of uncertainty as to its existence and economic

and legal feasibility. It cannot be assumed that any or part of an "Indicated Mineral Resource" or "Inferred Mineral Resource"

will ever be upgraded to a higher category of Mineral Resource. Investors are cautioned not to assume that all or any part

of mineral deposits in these categories will ever be converted into Proven and Probable Mineral Reserves.

The risks and uncertainties that may cause actual results to differ materially from Alamos' expectations include, among

others, risks related to obtaining the permits required to c arry out planned exploration or development work, the actual

results of current exploration activities, conclusions of economic and geological evaluations and changes in project

parameters as plans continue to be refined, changes to the price of gold, as w ell as those factors discussed in the section

entitled "Risk Factors" in Alamos' Annual Information Form and other disclosures by Alamos and its predecessors available

on the SEDAR website at www.sedar.com or on EDGAR at www.sec.gov. Although Alamos has at tempted to identify

important factors that could cause actual results to differ materially, there may be other factors that cause results not to be

as anticipated, estimated or intended. Readers are cautioned not to put undue reliance on forward- looking statements

which are not guarantees of future events, and speak only as of the date made. All of the forward-looking statements made

in this press release are qualified by these cautionary statements.

Cautionary Note to U.S. Investors – Mineral Reserve and Resource Estimates

All Mineral Resource and Reserve estimates included in this news release or documents referenced in this news release

have been prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects

("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") - CIM Definition Standards on

Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the "CIM Standards"). NI 43-101 is a

rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer

makes of scientific and technical information concerning mineral projects. The terms "Mineral Reserve", "Proven Mineral

Reserve" and "Probable Mineral Reserve" are Canadian mining terms as defined in accordance with NI 43-101 and the CIM

Standards. These definitions differ materially from the definitions in SEC Industry Guide 7 ("SEC Industry Guide 7") under

the United States Securities Act of 1933, as amended, and the Exchange Act. Under SEC Industry Guide 7 standards, a

"final" or "bankable" feasibility study is required to report reserves, the three- year historical average price is used in any

reserve or cash flow analysis to designate reserves and the primary environmental analysis or report must be filed with the

appropriate governmental authority.

In addition, the terms "Mineral Resource", "Measured Mineral Resource", "Indicated Mineral Resource" and "Inferred

Mineral Resource" are defined in and required to be disclosed by NI 43-101 and the CIM Standards; however, these terms

are not defined terms under SEC Industry Guide 7 and are normally not permitted to be used in reports and registration

statements filed with the U.S. Securities and Exchange Commission (the "SEC"). Investors are cautioned not to assume

that all or any part of mineral deposits in these categories will ever be converted into Mineral Reserves. "Inferred Mineral

Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal

feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher

category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-

feasibility studies, except in very limited circumstances. Investors are cautioned not to assume that all or any part of an

Inferred Mineral Resource exists or is economically or legally mineable. Disclosure of "contained ounces" in a Mineral

Resource is permitted disclosure under Canadian regulations; however, the SEC normally only permits issuers to report

mineralization that does not constitute "reserves" by SEC standards as in place tonnage and grade without reference to unit

measures.

TRADING SYMBOL: TSX: AGI NYSE:AGI

7 | ALAMOS GOLD INC

Table 1: Island Gold – Previously Unreleased Select Composite Intervals from Surface

Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values per zone: Zone C

@ 225 g/t Au; Zone E1E @ 100 g/t Au; Zone Unknown @ 70 g/t.

Target area: Main Extension (Main Ext), Western Extension (Western Ext).

Hole ID Zone Target Area From

(m) To (m)

Core

Length

(m)

True

Width

(m)

Au

Uncut

(g/t)

Au Cut

(g/t)

Vertical

Depth

MH9-12 E1E Main Ext 1497.70 1503.30 5.60 3.81 31.70 14.51 1416

MH10-6 E1E Main Ext 1536.80 1541.50 4.70 3.93 6.59 6.59 1420

MH10-10 E1E Main Ext 1518.00 1523.10 5.10 4.60 9.67 9.67 1397

MH12-1 E1E Main Ext 1521.50 1524.50 3.00 2.66 15.08 15.08 1395

MH12-2 E1E Main Ext 1523.00 1532.10 9.10 7.80 21.50 13.70 1391

MH13 E1E Main Ext 1537.60 1544.70 7.10 6.66 118.58 39.99 1346

MH4-8 C Western Ext 1281.60 1284.60 3.00 2.44 13.11 13.11 1054

MH5-7 C Western Ext 1315.90 1319.45 3.55 2.79 19.69 19.69 1087

MH5-9 C Western Ext 1378.00 1380.70 2.70 2.06 12.17 12.17 1171

MH5-11 C Western Ext 1415.00 1419.10 4.10 2.28 5.94 5.94 1232

MH7-3 C Western Ext 1454.70 1459.60 4.90 4.19 5.15 5.15 1139

MH7-4 C Western Ext 1438.00 1441.00 3.00 2.61 4.18 4.18 1130

MH7-5 C Western Ext 1451.40 1454.00 2.60 2.29 78.26 67.74 1126

MH5-6 G1 Western Ext 1237.70 1248.10 10.40 9.18 3.83 3.83 1003

MH5-7 G1 Western Ext 1278.00 1280.00 2.00 1.66 10.23 10.23 1059

MH10-10 Unknown Main Ext 1566.80 1569.50 2.70 3.19 3.19 1437

MH14 Unknown Main Ext 1463.70 1466.00 2.30 9.98 9.98 1319

MH5-8 Unknown Western Ext 1394.80 1397.65 2.85 5.85 5.85 1156

Note: Unknown zone corresponds to gold intercepts outside known ore zones and for which continuity is

not yet established and therefore true width has not been calculated.

TRADING SYMBOL: TSX: AGI NYSE:AGI

8 | ALAMOS GOLD INC

Table 2: Island Gold – Previously Unreleased Select Composite Intervals from Underground

Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values per zone: Zone C

@ 225 g/t Au; Zone E1E @ 100 g/t Au; Zone Unknown @ 70 g/t.

Target area: Main Extension (Main Ext), Eastern Extension (Eastern Ext), Western Extension

(Western Ext).

Hole ID Zone Target Area From

(m) To (m)

Core

Length

(m)

True

Width

(m)

Au

Uncut

(g/t)

Au Cut

(g/t)

Vertical

Depth

730-464-20 C Western Ext 133.00 136.00 3.00 2.08 17.58 17.58 597

620-598-06 E1E Eastern Ext 101.00 105.10 4.10 3.32 4.42 4.42 598

620-598-11 E1E Eastern Ext 228.50 237.40 8.90 3.73 6.32 6.32 725

620-598-18 E1E Eastern Ext 299.90 306.50 6.60 2.61 9.05 9.05 795

620-604-01 E1E Eastern Ext 206.00 213.50 7.50 3.77 6.29 6.29 691

620-604-06 E1E Eastern Ext 215.70 221.50 5.80 2.78 4.61 4.61 710

620-604-11 E1E Eastern Ext 235.10 240.00 4.90 2.50 3.05 3.05 721

620-605-01 E1E Eastern Ext 206.00 215.10 9.10 4.95 3.65 3.65 679

620-605-04 E1E Eastern Ext 103.00 112.00 9.00 7.60 13.72 13.72 546

620-605-05 E1E Eastern Ext 258.00 269.40 11.40 3.39 6.50 6.50 738

620-605-06 E1E Eastern Ext 302.90 309.60 6.70 2.83 46.13 44.17 778

840-542-01 E1E Main Ext 267.90 271.60 3.70 2.18 3.75 3.75 1029

840-542-05 E1E Main Ext 227.70 231.00 3.30 2.43 8.63 8.63 983

620-598-09 Unknown Eastern Ext 53.93 60.20 6.27 5.97 5.97 613

620-598-10 Unknown Eastern Ext 60.98 65.20 4.22 34.25 18.06 555

620-598-15 Unknown Eastern Ext 70.80 76.50 5.70 11.46 11.46 529

620-598-18 Unknown Eastern Ext 131.00 136.00 5.00 127.16 73.66 683

620-598-20 Unknown Eastern Ext 63.10 70.40 7.30 3.34 3.34 609

620-604-05 Unknown Eastern Ext 92.33 98.00 5.67 18.27 17.31 665

620-604-06 Unknown Eastern Ext 27.00 30.70 3.70 16.17 15.36 610

620-604-06 Unknown Eastern Ext 96.65 101.10 4.45 9.11 8.34 647

620-605-06 Unknown Eastern Ext 109.15 113.20 4.05 7.52 7.52 663

Note: Unknown zone corresponds to gold intercepts outside known ore zones and for which continuity is

not yet established and therefore true width has not been calculated.