Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AGI.TO ·

Alamos Gold Extends High-Grade Gold Mineralization 300 Metres Down-Plunge from Mineral Resources in Island Gold East

Drill Results

ALAMOS GOLD INC.

Brookfield Place, 181 Bay Street, Suite 3910, P.O. Box #823

Toronto, Ontario, Canada M5J 2T3

Telephone: (416) 368-9932 or 1 (866) 788-8801

All amounts are in United States dollars, unless otherwise stated.

F O R I M M E D I A T E R E L E A S E

W E B S I T E : w w w . a l a m o s g o l d . c o m T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

Alamos Gold Extends High-Grade Gold Mineralization 300 Metres Down-Plunge

from Mineral Resources in Island Gold East

Toronto, Ontario (November 11, 2021) – Alamos Gold Inc. (TSX:AGI; NYSE:AGI) (“Alamos”

or the “Company”) today reported new results from surface and underground exploration drilling

at the Island Gold mine, further extending high-grade gold mineralization in the middle and lower

portions of Island East. All reported drill widths are true width of the mineralized zones , unless

otherwise stated.

• Island East Lower: high-grade gold mineralization significantly extended up to 300

metres (“m”) down-plunge from existing Inferred Mineral Resources in Island East

(MH27-02). This confirms high-grade mineralization extends east of the most easterly

diabase dyke in a previously untested area . This is the deepest hole drilled to date at

Island Gold confirming high -grade gold mineralization extends well beyond Mineral

Resources to a depth of more than 1,700 m. Wide, high-grade gold mineralization was

also extended 50 m beyond the nearest Inferred Mineral Resource block and down -

plunge from previously reported drill hole MH25-08 (71.21 g/t Au (39.24 g/t cut) over

21.33 m), the best hole drilled to date at Island Gold. New highlights include:

• 15.86 g/t Au (10.74 g/t cut) over 16.04 m (MH25-10);

• 15.76 g/t Au (15.76 g/t cut) over 10.82 m (MH25-11); and

• 11.90 g/t Au (11.90 g/t cut) over 4.60 m (MH27-02).

• Island East Middle: underground exploration drilling continues to extend high -

grade gold mineralization within the gap between Mineral Reserves and

Resources in the upper and middle portions of Island East. New highlights include:

• 12.03 g/t Au (12.03 g/t cut) over 8.26 m (840-602-23);

• 9.65 g/t Au (9.65 g/t cut) over 7.16 m (840-608-09);

• 14.24 g/t Au (13.88 g/t cut) over 3.77 m (840-602-29); and

• 11.39 g/t Au (11.39 g/t cut) over 2.50 m (840-618-01A).

Note: Drillhole composite intervals reported as “cut” may include higher grade samples which have been cut to 185

g/t Au for the Island East Area.

“Ongoing exploration success at Island Gold continues to demonstrate the significant potential

for further growth in Mineral Reserves and Resources . This included intersecting high -grade

mineralization 300 metres beyond existing Mineral Resources in the deepest hole drilled to date

at Island Gold. These results are in proximity to the planned shaft and highlight the tremendous

upside potential beyond what w as outlined in the Phase III Expansion study,” said John A.

McCluskey, President and Chief Executive Officer.

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

2 | ALAMOS GOLD INC

New highlight intercepts can be found in Tables 1 and 2, and in Figures 1 to 3 at the end of this

news release.

Island East

Surface Directional Drilling

Surface directional drilling continues to extend high-grade gold mineralization beyond Mineral

Resource blocks in the lower portions of Island East (Figures 1 and 2). New highlights from the

drilling program include (E1E-Zone) (Table 1):

• 15.86 g/t Au (10.74 g/t cut) over 16.04 m (MH25-10);

• 15.76 g/t Au (15.76 g/t cut) over 10.82 m (MH25-11);

• 11.90 g/t Au (11.90 g/t cut) over 4.60 m (MH27-02); and

• 9.07 g/t Au (9.07 g/t cut) over 2.12 m (MH27-01).

Drill holes MH25-10 (15.86 g/t Au (10.74 g/t cut) over 16.04 m) and MH25-11 (15.76 g/t Au

(15.76 g/t cut) over 10.82 m) intersected wide, high -grade mineralization 50 m and 45 m

beyond the nearest Inferred Mineral Res ource block in Island East. These drill holes conti nue

to extend gold mineralization down-plunge from drillhole MH25-08 (71.21 g/t Au (39.24 g/t cut)

over 21.33 m), the best hole ever drilled at Island Gold, and drillhole MH25-04 (28.97 g/t Au

(27.96 g/t cut) over 21.76 m) (both previously released; see press release dated June 15,

2021).

In addition, drill holes MH27-02 (11.90 g/t Au (11.90 g/t cut) over 4.60 m) and MH27-01 (9.07

g/t Au (9.07 g/t cut) over 2.12 m) intersected high-grade mineralization 300 m and 235 m from

the nearest Inferred Mineral Resource block in Island East. Drillhole MH27-02 is the deepest

hole drilled to date at Island Gold, intersecting high-grade mineralization at a depth of 1,717 m,

well below existing Mineral Resources which extend to a depth of approximately 1,500 m. This

also extended high -grade mineralization to within 200 m of the former Trillium Mining mineral

tenure, reinforcing the strategic merit of acquiring Trillium and this property in December 2020.

Drill holes MH27 -02 and MH27 -01 targeted the main Island Gold zone to the east of a north -

south trending diabase dyke which was emplaced along a pre -existing fault . The current

geological interpretation, based on the initial holes, is that the zone appears to be displaced

across the fault approximately 140 m to the north and closer to the planned shaft bottom.

Additional drilling will be completed to confirm these intersections are within the same structure

with t he results to date highlighting the significant potential for further Mineral Reserve and

Resource growth well below and down -plunge from existing Mineral Resources , and in closer

proximity to planned infrastructure.

Underground Exploration Drilling

Underground drilling from the 840-level exploration drift continues to extend high-grade

mineralization and close the gap between Mineral Reserves and Resources in the upper and

middle portions of Island East (between depths of 800 m and 1,000 m) (Figure 3). New

highlights include (E1E-Zone) (Table 2):

• 12.03 g/t Au (12.03 g/t cut) over 8.26 m (840-602-23);

• 9.65 g/t Au (9.65 g/t cut) over 7.16 m (840-608-09);

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

3 | ALAMOS GOLD INC

• 14.24 g/t Au (13.88 g/t cut) over 3.77 m (840-602-29); and

• 11.39 g/t Au (11.39 g/t cut) over 2.50 m (840-618-01A).

Other Zones

The Island Gold Deposit consists of a number of subparallel mineralized zones, with the majority

of Mineral Reserves and Resources defined in the C Zone and E1E -Zone which constitute the

main production horizons at the Island Gold Mine. Highlights of new intersections from

underground and surface exploration drilling of parallel zones and zones in which the lateral

continuity is not yet established (“Unknown Zone”) include (reported composite intervals are

core lengths) (Tables 1 and 2):

• 39.64 g/t Au (20.27 g/t cut) over 3.00 m (840-602-21); and

• 10.28 g/t Au (10.28 g/t cut) over 7.05 m (840-530-02);

Qualified Persons

Scott R.G. Parsons, P.Geo., FAusIMM, Alamos Gold ’s Vice President, Exploration, has

reviewed and approved the scientific and technical information contained in this news release.

Scott R.G. Parsons is a Qualified Person within the meaning of Canadian Securities

Administrator’s National Instrument 43-101 (“NI 43-101”).

Exploration programs at the Island Gold Mine are directed by Raynald Vincent, P.Eng., M.G.P.,

Exploration Superintendent at the Island Gold Mine and a Qualified Person within the meaning

of NI 43-101.

Quality Control

Alamos Gold maintains an internal QA/QC program at the Island Gold Mine to ensure sampling

and analysis of all exploration work is conducted in accordance with best practices.

Access to the Island Gold Mine is controlled by security personnel. Drill core is logged and

sampled at the core logging facility within the mine site under the supervision of a Qualified

Geologist. A geologist marks the individual samples for analysis, and sample intervals, sample

numbers, standards and blanks are entered into the database. The core is cut in half using an

electric core saw equipped with a diamond tipped blade. One half of the core is placed into a

plastic sample bag and sealed with zip ties in preparation for shipment. The other half of the

core is returned to th e core box and retained for future reference. The samples are placed in

large heavy-duty nylon reinforced Fabrene bags, which are identified and sealed before being

placed on pallets. The core samples are picked up at the mine site and delivered to AGAT

laboratory in Thunder Bay, Ontario.

Gold is analyzed by a 50 gr ams fire assay with an Atomic Absorption (AA) finish. Samples

greater than 6.5 g/t Au are re-analyzed using gravimetric finish methods. AGAT is a certified

laboratory and has internal quality con trol (“QC”) programs that include insertion of reagent

blanks, reference materials, and pulp duplicates.

The Corporation inserts QC samples (blanks and reference materials) at regular intervals to

monitor laboratory performance. Cross check assays are comp leted on a regular basis in a

secondary accredited laboratory. The QA/QC procedures are more completely described in the

Technical Report filed on SEDAR August 31, 2020.

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

4 | ALAMOS GOLD INC

About Alamos

Alamos is a Canadian -based intermediate gold producer with diversified production from three

operating mines in North America. This includes the Young -Davidson and Island Gold mines in

northern Ontario, Canada and the Mulatos mine in Sonora State, Mexico. Additionally, the

Company has a significant portfolio of de velopment stage projects in Canada, Mexico, Turkey,

and the United States. Alamos employs more than 1,700 people and is committed to the highest

standards of sustainable development. The Company’s shares are traded on the TSX and NYSE

under the symbol “AGI”.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Scott K. Parsons

Vice President, Investor Relations

(416) 368-9932 x 5439

The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this

release.

Cautionary Note

This news release includes certain statements that constitute forward-looking information within the meaning of applicable

Canadian and U.S. securities laws ("forward-looking statements"). All statements in this news release, other than statements

of historical fact, which address events, results, outcomes or developments that Alamos expects to occur are forward -

looking statements. Forward -looking statements are generally, but not always, identified by the use of forward -looking

terminology such as “continue”, “focus”, "estimate", or “potential” or variations of such words and phrases and similar

expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur

or be achieved or the negative connotation of such terms. In particular, this news release contains forward -looking

statements including, without limitation, with respect to surface and underground exploration drilling at the Island Gold mine,

the estimation of Mineral Resources, exploration results, potential mineralization, changes in Mineral Resources and Mineral

Reserves, Island Gold’s Phase III expansion and other information that is based on forecasts and projections of future

operational, geological or financial results, estimates of amounts not yet determinable and assumptions of management.

Exploration results that include geophysics, sampling, and drill results on wide spacings may not be indicative of the

occurrence of a mineral deposit. Such results do not provide assurance that further work will establish sufficient grade,

continuity, metallurgical characteristics and economic potential to be classed as a category of Mineral Resource. A Mineral

Resource that is classified as "Inferred" or "Indicated" has a great amount of uncertainty as to its existence and economic

and legal feasibility. It cannot be assumed that any or part of an "Indicated Mineral Resource" or "Inferred Mineral Resource"

will ever be upgraded to a higher category of Mineral Resource. Investors are cautioned not to assume that all or any part

of mineral deposits in these categories will ever be converted into Proven and Probable Mineral Reserves.

Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered

reasonable by management at the time of making such statements, are inherently subject to significant business, economic,

technical, legal, political and competitive uncertainties and contingencies. Known and unknown factors could cause actual

results to differ materially from those projected in the forward-looking statements, and undue reliance should not be placed

on such statements and information.

Such factors and assumptions underlying the forward-looking statements in this news release include: the actual results of

current exploration activities, conclusions of economic and geological evaluations, changes in project parameters as plans

continue to be refined, operations may be exposed to widespread pandemic; the impact of the COVID-19 pandemic on the

broader market; provincial and federal orders or mandates (including with respect to mining operations generally or auxiliary

businesses or services required for o ur operations) in Canada, Mexico, the United States and Turkey; the duration of

regulatory responses to the COVID -19 pandemic; changes in national and local government legislation, controls or

regulations, failure to comply with environmental and health an d safety laws and regulations; labour and contractor

availability (and being able to secure the same on favourable terms); disruptions in the maintenance or provision of required

infrastructure and information technology systems; fluctuations in the price of gold or certain other commodities such as,

diesel fuel, natural gas, and electricity; operating or technical difficulties in connection with mining or development activities,

including geotechnical challenges and changes to production estimates (which assume accuracy of projected ore grade,

mining rates, recovery timing and recovery rate estimates and may be impacted by unscheduled maintenance; changes in

foreign exchange rates (particularly the Canadian dollar, U.S. dollar, Mexican peso and Turkish Lira); the impact of inflation;

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

5 | ALAMOS GOLD INC

employee and community relations; litigation and administrative proceedings; disruptions affecting operations; availability

of and increased costs associated with mining inputs and labour; delays with the Phase III Expansion Project at the Island

Gold mine; inherent risks and hazards associated with mining and mineral processing including environmental hazards,

industrial accidents, unusual or unexpected formations, pressures and cave-ins; the risk that the Company’s mines may not

perform as planned; uncertainty with the Company's ability to secure additional capital to execute its business plans; the

speculative nature of mineral exploration and development, risks in obtaining and maintaining necessary licenses, permits

and aut horizations, contests over title to properties; expropriation or nationalization of property; political or economic

developments in Canada, Mexico, the United States, Turkey and other jurisdictions in which the Company may carry on

business in the future; increased costs and risks related to the potential impact of climate change; the costs and timing of

construction and development of new deposits; risk of loss due to sabotage, protests and other civil disturbances; the impact

of global liquidity and credi t availability and the values of assets and liabilities based on projected future cash flows; and

business opportunities that may be pursued by the Company.

For a more detailed discussion of such risks and other factors that may affect the Company's abilit y to achieve the

expectations set forth in the forward -looking statements contained in this news release, see the Company’s latest 40 -

F/Annual Information Form and Management’s Discussion and Analysis, each under the heading “Risk Factors” available

on the SEDAR website at www.sedar.com or on EDGAR at www.sec.gov. The foregoing should be reviewed in conjunction

with the information found in this news release.

The Company disclaims any intention or obligation to update or revise any forward -looking statement, whether written or

oral, or whether as a result of new information, future events or otherwise, except as required by applicable law.

Cautionary Note to U.S. Investors – Mineral Reserve and Resource Estimates

All resource and reserve estimates included in this news release have been prepared in accordance with Canadian National

Instrument 43 -101 - Standards of Disclosure for Mineral Projects (“NI 43 -101”) and the Canadian Institute of Mining,

Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by

the CIM Council, as amended (the “CIM Standards”). NI 43 -101 is a rule developed by the Canadian Securities

Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information

concerning mineral projects. The terms “Mineral Reserve”, “Proven Mineral Reserve” and “Probable Mineral Reserve” are

Canadian mining terms as defined in accordance with NI 43 -101 and the CIM Standards. Investors are ca utioned not to

assume that all or any part of mineral deposits in these categories will ever be converted into reserves. “Inferred Mineral

Resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and l egal

feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher

category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre -

feasibility studies, except in very limited circumstances. Investors are cautioned not to assume that all or any part of an

Inferred Mineral Resource exists or is economically or legally mineable. Disclosure of “contained ounces” in a Mineral

Resource is permitted disclosure under Canadian regulations.

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

6 | ALAMOS GOLD INC

Table 1: Island Gold – Previously Unreleased Select Composite Intervals from Surface and

Underground Directional Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values:

Island East @ 185 g/t Au.

Hole ID Zone Target Area From

(m) To (m)

Core

Length

(m)

True

Width

(m)

Au

Uncut

(g/t)

Au Cut

(g/t)

Vertical

Depth (m)

MH25-10 E1E Island East 1622.60 1641.20 18.60 16.04 15.86 10.74 1497

MH25-11 E1E Island East 1642.07 1654.00 11.93 10.82 15.76 15.76 1532

MH27-01 E1E Island East 1764.90 1767.60 2.70 2.12 9.07 9.07 1641

MH27-02 E1E Island East 1824.45 1829.90 5.45 4.60 11.90 11.90 1717

840-530-02 Unknown Main Island 155.75 162.80 7.05 -- 10.28 10.28 990

Table 2: Island Gold – Previously Unreleased Select Composite Intervals from Underground

Exploration Drilling

Composite intervals greater than 3 g/t Au weighted average, capping values:

Island East @ 185 g/t Au.

Hole ID Zone Target Area From

(m) To (m)

Core

Length

(m)

True

Width

(m)

Au

Uncut

(g/t)

Au Cut

(g/t)

Vertical

Depth

(m)

340-580-15 E1E Island East 185.70 190.30 4.60 2.34 5.20 5.20 432

840-584-04 E1E Island East 151.40 156.10 4.70 3.37 5.77 5.77 883

840-584-05 E1E Island East 208.20 214.50 6.30 3.82 4.62 4.62 961

840-590-03 E1E Island East 227.90 232.60 4.70 2.31 7.52 7.52 989

840-590-07 E1E Island East 174.55 177.70 3.15 2.20 12.01 12.01 929

840-602-21 E1E Island East 169.15 176.00 6.85 4.04 6.04 6.04 942

840-602-23 E1E Island East 146.10 157.80 11.70 8.26 12.03 12.03 911

840-602-24 E1E Island East 208.00 213.10 5.10 2.11 3.44 3.44 983

840-602-28 E1E Island East 184.30 189.00 4.70 3.48 4.67 4.67 959

840-602-29 E1E Island East 153.00 161.80 8.80 3.77 14.24 13.88 920

840-608-09 E1E Island East 148.32 156.34 8.02 7.16 9.65 9.65 903

840-618-01A E1E Island East 150.10 152.60 2.50 2.50 11.39 11.39 801

840-602-21 Unknown Island East 183.00 186.00 3.00 -- 39.64 20.27 949

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

7 | ALAMOS GOLD INC

Table 3: Surface and underground directional drill holes; azimuth, dip, drilled length, and collar

location at surface (UTM NAD83)

Hole ID Azimuth

(°) Dip (°)

Drilled

Length

(m)

UTM

Easting

(m)

UTM

Northing

(m)

UTM

Elevation

(m)

Comments

MH25-09 335 -80 712 692314 5351074 398 Cut from MH25-08 at 1037 m

MH25-10 335 -80 866 692314 5351074 398 Cut from MH25-09 at 1077 m

MH25-11 335 -80 1127 692314 5351074 398 Cut from MH25-06 at 699 m

MH26-04 339 -79 813 692210 5351208 394 Cut from MH26-03 at 933 m

MH26-05 339 -79 1142 692210 5351208 394 Cut from MH26-04 at 642 m

MH27-01 338 -76 2075 692344 5354146 392

MH27-02 338 -76 949 692344 5351146 392 Cut from MH27-01 at 1051 m

MH28-01B 253 -84 1651 692681 5351670 397 Cut from MH28-01A at 350 m

620-623-08 124 -55 558 691707 5352177 -209

620-623-09 124 -45 508 691707 5352177 -209

740-471-43A 110 -66 428 690297 5351608 -369 Cut from 740-471-43 at 408 m

840-530-01 178 -67 587 690848 5351794 -469

840-530-02 148 -63 630 690851 5351796 -466

Note: UTM mine surface elevation 382 m

T R A D I N G S Y M B O L : T S X : A G I N Y S E : A G I

8 | ALAMOS GOLD INC

Table 4: UG Exploration drill holes; azimuth, dip, drilled length, and collar location at surface

(UTM NAD83).

Hole ID Azimuth

(°) Dip (°)

Drilled

Length

(m)

UTM

Easting

(m)

UTM

Northing

(m)

UTM Elevation (m)

340-580-15 169 -43 228 691267 5352110 72

340-580-16 148 40 117 691267 5352109 76

340-580-17 179 37 120 691266 5352109 75

620-623-13 152 -14 210 691707 5352177 -207

840-584-04 161 -17 246 691378 5351957 -457

840-584-05 154 -34 282 691378 5351957 -457

840-584-06 149 -21 238 691378 5351957 -457

840-590-02 152 -6 207 691441 5351957 -455

840-590-03 144 -41 270 691442 5351957 -456

840-590-07 151 -32 249 691441 5351957 -455

840-602-19 166 -18 192 691562 5351985 -453

840-602-21 151 -38 246 691560 5351985 -454

840-602-23 151 -30 213 691561 5351985 -453

840-602-24 166 -44 267 691560 5351985 -454

840-602-28 171 -42 246 691562 5351985 -452

840-602-29 173 -32 213 691560 5351985 -453

840-608-09 164 -27 198 691619 5352009 -452

840-618-01A 159 11 256 691696 5352056 -449

840-618-06 145 -31 282 691697 5352056 -451

Note: UTM mine surface elevation 382 m