New York – AG                           July 16, 2018 

Toronto – FR 

Frankfurt – FMV  

First Majestic Produces a Record 5.1M Silver Equivalent Ounces in Second Quarter;

Increases 2018 Production Guidance to 20.5M – 22.6M Silver Equivalent Ounces

Vancouver,  BC,  Canada  ‐  First  Majestic  Silver  Corp.  ("First  Maj estic"  or  the  "Company")  announces  total 

production in the second quarter of 2018 from its seven operati ng silver mines reached a new Company record 

of 5.1 million equivalent ounces of silver. Total production consisted of 2.8 million ounces of silver, 25,449 ounces 

of gold, 3.9 million pounds of lead and 1.4 million pounds of zinc.  

The Company has increased its  2018 annual silver production to  a new range of 12.0 to 13.2 million ounces, or 

20.5 to 22.6 million silver equivalent ounces primarily due to  the addition of the San Dimas Silver/Gold mine 

which was acquired on May 10, 2018. This compares to the previous annual production guidance of 10.6 to 11.8 

million ounces of silver, or 15.7 to 17.5 million silver equivalent ounces.  

“During the quarter, the integration of the newly acquired San  Dimas mine into our Mexican portfolio was our 

primary focus,” said Keith Neumeyer, President & CEO. “The world‐class San Dimas operation, which contributed 

only seven weeks of production in the second quarter, propelled  the Company to a new quarterly production 

record of 5.1 million silver equivalent ounces and has become o ur cornerstone asset and will remain a major 

focus  for  the  next  several  quarters  as  we  optimize  the  operation .  S h o r t  t e r m ,  w e  a r e  f o c u s e d  o n  r e d u c i n g  

underground dilution and implementing mill automation processes , including the installation of high intensity 

grinding technologies in order to increase efficiencies and red uce production costs. In addition, under the new 

streaming agreement, we are going back to mine numerous high‐grade silver veins that were previously deemed 

uneconomic by the previous operator. In 2018, all‐in sustaining costs at San Dimas are projected to be between 

$6.99 to $8.19 per ounce, making it our lowest cost and our largest producing mine.”  

M r .  N e u m e y e r  c o n t i n u e d ,  “ A t  L a  E n c a n t a d a ,  t h e  c o n s t r u c t i o n  o f  th e  n e w  r o a s t e r  i s  i n  i t s  f i n a l  s t a g e s .  

Commissioning and start up procedures are expected to begin in  late August before ramping up to commercial 

production  by  the  end  of  the  year.  These  are  exciting  times  for   the  Company,  our  employees  and  our 

stakeholders.”  

PRODUCTION TABLE 

Q2  Q2  Y/Y  Q1  Q/Q 

2018  2017  Change  2018  Change 

Ore processed/tonnes milled  851,349  691,833  23%  809,775  5% 

Total production ‐ ounces of silver equivalent  5,137,318  3,888,944  32%  3,879,678  32% 

Silver ounces produced  2,756,263  2,287,188  21%  2,167,030  27% 

Gold ounces produced  25,449  15,186  68%  15,887  60% 

Pounds of lead produced  3,949,410  7,625,328  ‐48%  4,448,378  ‐11% 

Pounds of zinc produced  1,382,760  860,939  61%  1,611,699  ‐14% 

2 

QUARTERLY REVIEW 

Total ore processed during the quarter at the Company's seven o perating silver mines: San Dimas, Santa Elena, 

La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 851,349 tonnes, representing a 5% 

increase compared to the previous quarter. The increase in tonnes compared to the prior quarter was primarily 

due to the addition of the San Dimas production, offset by a 14% decrease in throughput at La Encantada.  

Consolidated silver grades in the quarter averaged 127 g/t compared to 111 g/t in the previous quarter. The 14% 

increase in silver grades was primarily the result of the addition of seven weeks of production from San Dimas.    

Consolidated silver recoveries averaged 79%, representing a 6% increase compared to the previous quarter. The 

Company expects further improvements in recoveries with the anticipated installation and commissioning of the 

microbubble flotation columns at La Parrilla in the third quarter of 2018, followed by Del Toro in the first quarter 

of 2019.  In addition, delivery and installation of the High Intensity Grinding (“HIG”) mills at Santa Elena and San 

Dimas  are  planned  for  October  and  November,  respectively,  followed  by  commissioning  over  the  following 

quarter.  The  benefits  of  this  new  technology,  most  notably  higher  recoveries  and  lower  operating  costs,  are 

expected to be realized after completing ramp up to commercial production in the first half of 2019.   

The Company's underground development in the second quarter con sisted of 17,838 metres, reflecting a 20% 

increase compared to 14,914 metres  completed in the previous qu arter. Additional development contractors 

were brought in during the second quarter at La Encantada and D el Toro to focus on increasing development 

rates to support production. Development remains focused on ope ning new production areas, exploring high 

potential zones and new stope preparation.  

During the quarter, up to 29 diamond drill rigs were active acr oss the Company’s properties. A total of 298 drill 

holes were completed for a total of 73,899 metres on the seven producing assets as well as the Plomosas Silver 

Project, representing a 65% increase in drilled metres compared  to the previous quarter. Primary exploration 

activities focused on replacement deposits at the Quebradillas mine and the epithermal vein system at Cerro de 

Santiago at La Parrilla, exploring extensions of the main Santa  Elena vein, vein splays of Santa Elena and at the 

Ermitaño‐West project at Santa Elena, exploring Santa Jessica, Santa Regina and Alexa veins in the Central block 

and Sinaloa Graben at San Dimas and exploring vein mineralizati on at the San Juan mine at the Plomosas Silver 

Project. 

MINE BY MINE PRODUCTION TABLE 

1) San Dimas production was over the period May 10, 2018 to June 30, 2018, or 52 days.  

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*The following prices were used in the calculation of silver eq uivalent ounces: Silver: $16.52 per ounce; Gold: $1,300 per oun ce; Lead: $1.08 per pound; 

Zinc: $1.41 per pound.  

Mine

 Ore 

Processed 

 Tonnes 

per Day 

 Silver Oz 

Produced 

 Gold Oz 

Produced 

 Pounds of 

Lead 

 Pounds of 

Zinc 

 Equivalent 

Silver Ounces 

San Dimas(1) 85,765        1,649         808,923         11,348        ‐              ‐                1,698, 382  

Santa Elena 228,054      2,506         535,015          11,040          ‐                  ‐                1,407, 880    

La Encantada 237,862      2,614         325,603          23                 ‐                  ‐                327, 458       

La Parrilla 123,642      1,359         360,862          235               1,653,868     1,382,760    605,826        

Del Toro 65,879        724            167,591          73                 2,295,542     ‐                323, 714       

San Martin 74,431        818            419,815          1,331            ‐                  ‐                524, 843       

La Guitarra 35,715        392            138,454          1,399            ‐                  ‐                249, 214       

Total 851,349      9,355         2, 756,263       25,449          3,949,410     1,382,760    5,137,318     

3 

At the San Dimas Silver/Gold Mine: 

 For  the  last  seven  weeks  of  the  second  quarter  after  acquiring S a n  D i m a s ,  t h e  o p e r a t i o n  p r o d u c e d  

808,923 ounces of silver and 11,348 ounces of gold for a total production of 1,698,382 silver equivalent 

ounces. 

 The mill processed a total of 85,765 tonnes with average silver  and gold grades of 307 g/t and 4.3 g/t, 

respectively.  

 A total of 2,481 metres of underground development was completed in the second quarter. 

 Six drill rigs completed 22 drill holes for a total of 10,522 metres of exploration drilling during the quarter 

with a primary focus around Santa Jessica, Santa Regina and Alexa veins in the Central block and Sinaloa 

Graben. 

At the Santa Elena Silver/Gold Mine: 

 During the quarter, Santa Elena produced 535,015 ounces of silver and 11,040 ounces of gold for a total 

production  of  1,407,880  silver  equivalent  ounces,  reflecting  a  9%  decrease  compared  to  the  prior 

quarter.  

 The  mill  processed  a  total  of  228,054  tonnes,  consisting  of  128,200  tonnes  of  underground  ore  and 

99,854 tonnes from the above ground heap leach pad.  

 Silver and gold grades from underground ore averaged 120 g/t an d 2.3 g/t, respectively. Silver and gold 

grades from the above ground heap leach pad averaged 36 g/t and 0.7 g/t, respectively.  

 A total of 2,926 metres of underg round development was complete d in the second quarter compared 

to 3,030 metres of development in the previous quarter.  

 Four  drill  rigs  completed  35  drill  holes  for  a  total  of  10,717 metres  of  exploration  drilling  during  the 

quarter compared to 7,097 metres of drilling in the previous quarter. 

At the La Encantada Silver Mine: 

 For  the  quarter,  silver  production  reached  325,603  ounces  representing  a  28%  decrease  from  the 

previous quarter. The decrease in silver production was primarily due to a 14% decrease in tonnes milled 

and a 14% decrease in silver recoveries compared to the prior quarter. 

 Silver grades and recoveries during the quarter averaged 83 g/t  and 51%, respectively. The San Javier 

breccia produced 27,500 tonnes with an average silver grade of  103 g/t. Silver grades began to show 

improvements starting in June as some of the existing ore extraction points passed through a low‐grade 

column of ore blocks and began producing from a high‐grade colu mn. Further grade improvements are 

expected in the second half of 2018 due to higher production ra tes from San Javier and the start‐up of 

production at the La Prieta breccia. 

 The roasting project advanced in the second quarter with the co mpletion of the rotary kiln brick lining, 

grate cooler and thermal insulation of the tertiary air duct. At the end of June, approximately 87% of the 

project  was  completed.  The  coal  pulverizing  facility,  motor  control  center  and  electrical  wiring  are 

scheduled to be completed by the end of July. Initial productio n from the roaster is now estimated to 

begin in late August and ramp up to commercial production by the end of the year.     

 A total of 1,718 metres of underground development were complet ed in the second quarter compared 

to 1,445 metres of development in the previous quarter.  

 Two drill rigs completed 41 drill holes for a total of 7,020 metres of exploration drilling during the quarter 

compared to 4,574 metres of drilling in the previous quarter.  

4 

At the La Parrilla Silver Mine: 

 During the quarter, the flotation circuit processed 70,771 tonn es (778 tpd) with an average silver grade 

of 131 g/t and a 78% recovery while the cyanidation circuit pro cessed 52,871 tonnes (581 tpd) with an 

average  silver  grade  of  105  g/t  and  a  71%  recovery  for  total  production  of  605,826  silver  equivalent 

ounces.  

 The lead circuit processed an average lead grade of 1.4% with recoveries of 77% for total lead production 

of 1.7 million pounds, representing a 3% increase compared to the previous quarter.  

 The zinc circuit processed an average zinc grade of 1.5% with recoveries of 60% for total zinc production 

of 1.4 million pounds, representing a 14% decrease compared to the previous quarter.  

 Underground development complet ed in the quarter totaled 2,761  metres compared to 3,254 metres 

developed in the previous quarter. 

 Five  drill  rigs  completed  41  drill  holes  for  a  total  of  10,444 metres  of  exploration  drilling  during  the 

quarter compared to 8,358 metres of drilling in the previous quarter.  

At the Del Toro Silver Mine: 

 During  the  quarter,  Del  Toro  produced  a  total  of  323,714  silver  equivalent  ounces  reflecting  a  26% 

decrease  compared  to  the  prior  quarter  primarily  due  to  a  17%  decrease  in  throughput,  and  a  12% 

decrease in silver grade.  

 Silver grades and recoveries during the quarter averaged 117 g/t and 68%, respectively.  

 Lead grades and recoveries averaged 2.7% and 58%, respectively, producing a total of 2.3 million pounds 

of lead representing a 19% decrease compared to the previous quarter.  

 Underground development complet ed in the quarter totaled 3,044  metres compared to 2,836 metres 

developed in the previous quarter.  

 Three  drill  rigs  completed  70  drill  holes  for  a  total  of  9,145 metres  of  exploration  drilling  during  the 

quarter compared to 5,824 metres of drilling in the previous quarter.  

At the San Martin Silver Mine: 

 During the quarter, San Martin produced 419,815 ounces of silve r and 1,331 ounces of gold for a total 

production of 524,843 silver equivalent ounces, reflecting a 9% decrease compared to the prior quarter. 

The decrease in production was primarily attributed to a 13% decrease in silver grades. 

 Silver grades and recoveries averaged 203 g/t and 87%, respectively, during the quarter. In addition, gold 

grades and recoveries averaged 0.6 g/t and 87%, respectively.  

 Underground development completed in the quarter totaled 2,957 metres compared with 2,966 metres 

of development in the previous quarter.  

 Three  drill  rigs  completed  36  drill  holes  for  a  total  of  9,781 metres  of  exploration  drilling  during  the 

quarter compared to 4,928 metres of drilling in the previous quarter. 

At the La Guitarra Silver Mine: 

 During the quarter, La Guitarra  produced 138,454 ounces of silv er and 1,399 ounces of gold for a total 

production of 249,214 silver equivalent ounces reflecting a 2% decrease compared to the prior quarter.  

 Silver grades and recoveries averaged 154 g/t and 78%, respectively, during the quarter. In addition, gold 

grades and recoveries averaged 1.5 g/t and 79%, respectively.   

 A  total  of  1,950  metres  of  development  were  completed  in  the  second  quarter  compared  to  1,384 

metres of development in the previous quarter.  

5 

 Three  drill  rigs  completed  21  drill  holes  for  a  total  of  7,613 metres  of  exploration  drilling  during  the 

quarter compared to 5,806 metres of drilling in the previous quarter.  

SAN DIMAS OPTIMIZATION PLANS 

Given its extensive 250‐year produ ction history in Mexico, San  Dimas is one of the country’s most prominent 

silver and gold mines as well as the largest producing undergro und mine in the state of Durango. However, due 

t o  p o o r  e c o n o m i c  c o n d i t i o n s  o v e r  r e c e n t  y e a r s  c a u s e d  b y  w e a k  m etal  prices  and  the  previous  streaming 

agreement, the operation suffered from a lack of investment. Under the new streaming arrangement as of May 

10th, the operation is now generating significant cash flows al lowing First Majestic to deploy capital towards 

exploration and underground development in areas of the mine that were previously deemed uneconomic.   

Since the acquisition announcemen t in January 2018, First Majes tic has been developing a long‐term mine and 

mill automation plan for the future of the operation. The Company has identified numerous projects that will be 

implemented  over  the  next  12  to  18  months  to  improve  production  costs  at  the  mine  and  processing  plant, 

including:   

1) Implementation of High Intensity Grinding technology  

2) Lime automation and pH control 

3) Upgrading the tailings filtration plant 

4) Modernization of the Merrill‐Crowe and smelting operations  

5) Installation of the third counter‐current decantation tank 

6) Estimated 40% reduction in ore drive development dimensions allowing for reduced dilution and 

reductions in costs associated with standard ground support  

7) Pillar recoveries from Tayoltita, Santa Rita and Noche Buena mines          

In the second half of the 2018, production rates at San Dimas are expected to average 1,700 tpd with estimated 

average silver and gold grades of 345 g/t and 3.9 g/t, respectively. It should be noted that many of the anticipated 

benefits from these mine and mill modifications are not yet ref lected in the forecasted operating results below 

and is expected to take several operating quarters to materialize. 

OUTLOOK 

Following  the  transformational  acquisition  of  the  San  Dimas  operation,  the  Company  will  be  implementing 

various cost saving programs and operational modifications in order to improve profitability across the portfolio 

of  assets.  The  Company  has  revised  its  annual  production  guidance  to  incorporate  the following  operational 

adjustments:   

1. The addition of approximately 3.7 to 4.0 million ounces of silv er (or 7.1 to 7.7 million silver equivalent 

ounces)  of  production  in  2018  from  San  Dimas.  On  an  annualized rate,  production  at  San  Dimas  is 

projected to be 5.8 to 6.4 million ounces of silver (or 10.8 to 12.0 million silver equivalent ounces).  

2. Increased silver grades at Santa Elena to 94 g/t compared to the previous estimate of 89 g/t, due to mine 

sequencing into areas of the mine with higher silver grades and lower gold grades.  Blended gold grades 

from the heap leach pad together with fresh underground ore are  expected to average 1.5 g/t for the 

full year compared to 1.7 g/t which was achieved in the first half of the 2018. 

3. Reduction of head grades at La Encantada to 110 g/t, from previous estimates of 150 g/t, due to a delay 

in accessing higher grade materi al from sub‐level caving at the  San Javier and La Prieta breccias. The 

slight production delay was due to difficult ground conditions  affecting drilling and support in the cave 

i n i t i a t i o n  a n d  h a v e  s i n c e  b e e n  r e solved.  Grades  and  tonnage  from  these  two  areas  are  expected  to 

increase in the second half of 2018 and improve silver producti on. In addition, initial production from 

6 

the new roaster is now scheduled to begin at the end of August, previous start‐up guidance was March, 

and  ramping  up  to  commercial  production  by  the  end  of  the  year. T h e  d e l a y s  w i t h  t h e  r o a s t e r  a n d  

accessing  higher  grade  ounces  from  sub‐level  caving  resulted  in  approximately  a  1.0  million  ounce 

deferral in annual silver production at La Encantada compared to the original guidance.  

4. Reduction  in  throughput  at  Del  Toro  in  the  second  half  of  the  year  to  800  tpd  due  to  decreased 

development rates in the San Juan and Dolores mines. In additio n, silver recoveries are now planned at 

67% compared to 78% due to a higher volume of transitional ore  being processed through the flotation 

circuit.  The microbubble flotation cells which are planned to be installed in the first quarter of 2019 are 

expected to improve these recoveries. 

5. Following an extensive review of the La Guitarra operation, the Company has decided to place the mine 

and mill under care and maintenance and review strategic option s including the potential sale of the 

operation.  The  decision  to  place  the  operation  under  care  and  maintenance,  which  is  scheduled  for 

August 1st, has been a difficult decision for management. Unfortunately, the reallocation of capital and 

resources to projects that have better economics and internal rates of return such as the newly acquired 

San Dimas operation are taking p riority.  The Company will cont inue with current permitting activities 

and remediation programs to prepare the operation for a potential reopening in the future, subject to a 

sufficient improvement in the economic situation to justify a restart of the operation. 

As  a  result  of  these  operational  modifications,  our  2018  annual  silver  production  has  been  increased  to  an 

estimated range of 12.0 to 13.2 million ounces, or 20.5 to 22.6  million silver equivalent ounces. This compares 

to the previous annual production guidance of 10.6 to 11.8 million ounces of silver, or 15.7 to 17.5 million silver 

equivalent ounces.  

The Company is also providing guidance for the second half of 2 018 on a mine‐by‐mine basis below. Cash cost 

a n d  A I S C  g u i d a n c e  i s  s h o w n  p e r  p a y a b l e  s i l v e r  o u n c e .  M e t a l  p r i ce  and  foreign  currency  assumptions  for 

calculating silver equivalent ounc es were unchanged compared to  the previous budget; silver: $16.50/oz, gold: 

$1,250/oz, lead: $1.10/lb, zinc: $1.40/lb, MXN:USD 19:1. 

GUIDANCE FOR SECOND HALF OF 2018 

Mine  Silver Oz (M)  Silver Eqv Oz  Cash Costs ($)  AISC ($) 

San Dimas  2.9 – 3.2 5.4 – 6.0 2.71 – 3.74  7.12 – 8.64

Santa Elena  1.2 – 1.3  2.4 –  2.7  5.70 – 6.67  9.52 – 10.63 

La Encantada  1.4 – 1.6  1.4 – 1.6  11.74 – 12.52  15.47 – 16.58 

La Parrilla  0.7 – 0.8  1.2 – 1.3  8.65 – 9.29  14.71 – 15.76 

Del Toro  0.4 – 0.5  0.8 – 0.9  10.74 – 12.08  21.61 – 24.20 

San Martin  0.9 – 1.0  1.0 – 1.2  8.60 – 9.30  11.83 – 12.82 

La Guitarra    0.04  0.07  15.15 – 16.29  29.63 – 31.70  

Consolidated  7.6 – 8.4 12.4 – 13.8 $6.63 ‐ $7.54  $13.28 ‐ $14.84

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*Consolidated AISC includes general and administrative cost estimates and non‐cash costs of $1.99 to $2.22 per payable silver ounce. 

In the second half of 2018, the Company expects silver producti on to range between 7.6 – 8.4 million ounces, 

representing a 55% to 71% increase when compared to 4.9 million  silver ounces produced in the first half of 

2018.  Additionally,  total  production  is  now  expected  to  range  between  12.4  –  13.8  million  silver  equivalent 

ounces  in  the  second  half  of 2018,  representing  a  38%  to  53%  increase  when  compared  to  9.0  million  silver 

equivalent ounces produced in the first half of 2018. 

A mine‐by‐mine breakdown of the revised full year 2018 production guidance is included in the table below and 

assumes the same metal prices and foreign currency assumptions as stated previously. 

7 

GUIDANCE FOR FULL YEAR 2018  

Mine  Silver Oz (M)  Silver Eqv Oz  Cash Costs ($)  AISC ($) 

San Dimas  3.7 – 4.0 7.1 – 7.7 2.88 – 3.66  6.99 – 8.19

Santa Elena  2.1 – 2.3  5.0 –  5.6  2.48 – 3.03  7.28 – 8.18 

La Encantada  2.1 – 2.3  2.1 – 2.4  14.25 – 14.79  18.52 – 19.47 

La Parrilla  1.4 – 1.5  2.3 – 2.5  9.67 – 10.08  15.77 – 16.70 

Del Toro  0.7 – 0.8  1.5 – 1.6  12.16 – 12.91  22.25 – 24.15 

San Martin  1.7 – 1.9  2.0 – 2.2  8.61 – 9.00  11.53 – 12.20 

La Guitarra    0.3  0.5   11.17 – 11.45  20.28 – 21.38 

Consolidated  12.0 – 13.2 20.5  – 22.6 $7.18 ‐ $7.75  $14.53 ‐ $15.83

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*Consolidated AISC includes general and administrative cost estimates and non‐cash costs of $2.42 to $2.69 per payable silver ounce. 

Annual  cash  costs  are  now  expected  to  be  within  the  range  of  $7.18  to  $7.75  per  ounce,  compared  to  the 

previous guidance of $8.30 to $9.09 per ounce, primarily due to the addition of the low‐cost San Dimas operation. 

In addition, annual all‐in sustaining costs are now expected to  be within a range of $14.53 to $15.83 per ounce, 

compared to the previous guidance of $15.21 to $16.56 per ounce. 

REVISED CAPITAL BUDGET 

The Company has updated its 2018 capital budget to include the San Dimas operation as well as the reallocation 

of capital for development and exploration across its operations.  As a result, total capital investments for 2018 

are now estimated at $148.7 million, consisting of $64.8 millio n for sustaining requirements and $83.9 million 

for expansionary projects. This represents a 19% increase compared to the original 2018 capital budget of $125.4 

million primarily due to the inclusion of the San Dimas operation and additional investments related to corporate 

projects.  The  revised  budget  includes  $59.2  million  to  be  spent  on  underground  development,  $35.6  million 

towards  property,  plant  and  equipment,  $27.4  million  in  exploration  and  $26.5  million  towards  corporate 

projects including mill automation and HIG mill technology. On a mine‐by‐mine basis, capital expenditures in the 

second half of 2018 are estimated to be $22.4 million at San Di mas, $11.4 million at Santa Elena, $11.1 million 

at La Encantada, $8.9 million at La Parrilla, $7.9 million at D el Toro, $5.8 million at San Martin and $2.6 million 

at La Guitarra.   

Revised 2018 Capital Budget ($millions)  Sustaining  Expansionary Total 

Underground Development  32.8 26.4 59.2 

Exploration  4.4  23.0  27.4 

Property, Plant and Equipment  23.9  11.7  35.6 

Corporate Projects  3.5  23.0  26.5 

Total  $64.8 $83.9 $148.7 

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

In  the  first  half  of  2018,  the  Company  completed  32,752  metres of  underground  development  and  118,726 

metres of exploration drilling. Under the revised 2018 budget, the Company is now expecting to complete a total 

of 76,700 metres of underground development, representing a 6%  increase  compared the original budget of 

72,477 metres. In addition, the Co mpany is now planning to comp lete a total of 203,500 metres of exploration 

drilling in 2018, representing an 11% increase compared to the original budget of 183,000 metres, primarily due 

the addition of 33,400 metres of exploration drilling planned at San Dimas. 

8 

APPOINTMENT OF VP OF EXPLORATION 

The Company is pleased to announce the appointment of Greg Kull a as Vice President of Exploration who will 

lead all exploration activities at the Company’s growing portfo lio of projects in Mexico. Mr. Kulla has over 30 

years of experience exploring and evaluating mineral deposits a nd resource estimates that support operating 

mines. Prior to joining First Majestic, Greg was with Amec Foster Wheeler (“Amec”), a multinational consultancy, 

engineering  and  project  management  company,  for  13  years  holdin g  the  position  of  Principal  Geologist. 

Additionally, Mr. Kulla also has 18 years of experience as an exploration geologist prior to joining Amec covering 

a diverse set of base, precious metal and industrial mineral deposit types worldwide including vein‐hosted silver, 

epithermal and orogenic gold, porphyry copper‐gold‐silver‐molyb denum, polymetallic skarn, sediment‐hosted 

copper and sulphide nickel projects. He has extensive experienc e in mineral exploration, resource estimation, 

data quality assurance and quality control evaluation, technical audits and due diligence reviews. 

CONFERENCE CALL 

The Company will be holding a conference call and webcast on Tuesday, July 17, 2018 at 8am PDT (11 am EDT).   

To participate in the conference call, please dial the following: 

Toll Free Canada & USA:   1‐800‐319‐4610 

Outside of Canada & USA:  1‐604‐638‐5340 

Toll Free Germany:   0800 180 1954 

Toll Free UK:   0808 101 2791 

Participants should dial in 10 minutes prior to the conference. Click on WEBCAST on the First Majestic homepage 

as a simultaneous audio webcast of the conference call will be posted at www.firstmajestic.com. 

The conference call will be recorded and you can listen to an archive of the conference by calling:  

  Canada & USA Toll Free:  1‐800‐319‐6413 

  Outside Canada & USA:    1‐604‐638‐9010 

  Access Code:       2450 followed by the # sign 

The replay will be available approximately one hour after the c onference and will available for 7 days following 

the conference.  The replay will also be available on the Company’s website for one month. 

Q2 EARNINGS ANNOUNCEMENT 

The Company is planning to releas e its second quarter 2018 unau dited financial results on Monday, August 13, 

2018.  

ABOUT THE COMPANY 

First  Majestic  is  a  mining  compan y  f o c u s e d  o n  s i l v e r  p r o d u c t i o n  in  Mexico  and  is  aggressively  pursuing  the 

development of its existing mineral property assets. The Company presently owns and operates seven producing 

silver mines; the San Dimas Silver/Gold Mine, the Santa Elena S ilver/Gold Mine, the La Encantada Silver Mine, 

the La Parrilla Silver Mine, the San Martin Silver Mine, the De l Toro Silver Mine and the La Guitarra Silver Mine. 

Production from these seven mines is projected to be between 12.0 to 13.2 million ounces of pure silver or 20.5 

to 22.6 million ounces of silver equivalents in 2018.