Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AG.TO ·

FR Frankfurt – FMV First Majestic Produces 6.4 Million Silver Equivalent Ounces in Second Quarter; Provides Conference Call Details

Financials

New York – AG                         July 15, 2019 

Toronto – FR 

Frankfurt – FMV  

First Majestic Produces 6.4 Million Silver Equivalent Ounces in Second Quarter;

Provides Conference Call Details

Vancouver,  BC,  Canada  ‐  First  Majestic  Silver  Corp.  ("First  Maj estic"  or  the  "Company")  announces  total 

production  in  the  second  quarter  of  2019  reached  6.4  million  silver  equivalent  ounces,  representing  a  2% 

increase compared to the prior quarter. Total production consisted of 3.2 million ounces of silver, 33,576 ounces 

of  gold,  2.5  million  pounds  of  lead  and  1.4  million  pounds  of  zinc.  In  the  first  half  of  2019,  total  production 

reached 12.7 million ounces, or approximately 49% of the Compan y’s guidance midpoint of producing 24.7 to 

27.5 million silver equivalent ounces in 2019.   

“Our two primary assets, the San Dimas and Santa Elena mines, saw strong growth during the quarter producing 

approximately  80%  of  our  total  metal  production,”  said  Keith  Ne umeyer,  President  and  CEO.  “San  Dimas 

continues to exceed guidance due to higher than expected grades and mining rates from the Jessica and Victoria 

veins. At Santa Elena, the newly installed HIG mill is in its f inal commissioning stage and is expected to ramp up 

to  reach  design  capacity  of  3,000  tpd  in  the  third  quarter.  The  HIG  mill  is  anticipated  to  improve  overall 

metallurgical recoveries and lower energy costs compared to tra ditional ball milling. These two operations will 

continue to be a major focal point for future production growth  and capital investments.”  

“Last but certainly not least, I’m very proud to announce that in May we received Ermitaño’s DTU permit,” stated 

Neumeyer. “ T h i s  w a s  t h e  f i n a l  p e r m i t  r e q u i r e d  b e f o r e  i n i t i a t i n g  d e v e l o p ment  activities  at  this  high‐grade 

gold/silver deposit near our Santa Elena mill. Underground development activities are now expected to begin in 

the fourth quarter of 2019 with initial production in late 2020 . Ermitaño’s high grade resources are expected to 

significantly increase Santa Elena’s production profile and extend mine life for years to come.”     

PRODUCTION TABLE 

Q2  Q2  Y/Y  Q1  Q/Q 

2019  2018  Change  2019  Change 

Ore processed/tonnes milled  736,896  851,349  ‐13%  812,654  ‐9% 

Total production ‐ ounces of silver eqv.  6,410,483  5,137,318  25%  6,273,677  2% 

Silver ounces produced  3,193,566  2,756,263  16%  3,331,388  ‐4% 

Gold ounces produced  33,576  25,449  32%  32,037  5% 

Pounds of lead produced  2,452,803  3,949,410  ‐38%  2,661,088  ‐8% 

Pounds of zinc produced  1,398,922  1,382,760  1%  1,265,438  11% 

QUARTERLY REVIEW 

Total ore processed during the quarter at the Company's mines amounted to 736,896 tonnes, representing a 9% 

decrease compared to the previous quarter. The decrease in tonn es processed compared to the prior quarter 

was  primarily  due  to  lower  mine  production  from  sub‐level  caving  at  La  Encantada,  a  decrease  in  available 

production stopes at San Martin and La Parrilla, offset by higher production rates at San Dimas, Santa Elena and 

Del Toro.  

Consolidated silver grades in the quarter averaged 159 g/t compared to 153 g/t in the previous quarter. This 4% 

increase was primarily the result of higher grades at San Dimas, La Parrilla, San Martin and Del Toro. Consolidated 

gold grades averaged 1.48 g/t compared to 1.26 g/t in the prior  quarter representing an 18% increase due to 

better grades from the Jessica and Victoria veins at San Dimas.    

Consolidated silver and gold recoveries averaged 85% and 96%, r espectively, during the quarter. The Company 

successfully  completed  the  installation  of  the  high‐intensity  grinding  (“HIG”)  mill  at  Santa  Elena  during  the 

quarter. The new mill has a grinding capacity of 3,000 tpd and  is expected to ramp up to reach design capacity 

during the third quarter. The Company expects improvements in m etallurgical recoveries and lower operating 

costs at Santa Elena in the third quarter following the adoption of fine grinding technology.  

MINE BY MINE PRODUCTION TABLE 

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*The following prices were used in the calculation of silver eq uivalent ounces: Silver: $14.88 per ounce; Gold: $1,309 per oun ce; Lead: $0.85 per pound; 

Zinc: $1.25 per pound.  

At the San Dimas Silver/Gold Mine: 

 During the quarter, San Dimas produced 1,603,016 ounces of silver and 23,082 ounces of gold for a total 

production  of  3,641,139  silver  equivalent  ounces,  reflecting  a  15%  increase  compared  to  the  prior 

quarter.  

 The mill processed a total of 172,368 tonnes with average silver and gold grades of 312 g/t and 4.32 g/t, 

respectively. Silver and gold grades improved 9% and 3%, respec tively, compared to the prior quarter 

due to better than expected grades from the Jessica and Victoria veins.     

 Silver and gold recoveries averaged 93% and 96%, respectively, during the quarter.  

Mine

 Ore 

Processed 

 Tonnes 

per Day 

 Silver Oz 

Produced 

 Gold Oz 

Produced 

 Pounds of 

Lead 

 Pounds of 

Zinc 

 Equivalent 

Silver Ounces 

San Dimas 172,368      1,894         1, 603,016      23,082        ‐              ‐                3,641, 139  

Santa Elena 229,761      2,525         596,872          9,839            ‐                  ‐                1,461, 345    

La Encantada 207,421      2,279         489,194          43                 ‐                  ‐                492, 957       

San Martin 39,213        431            224,056          543               ‐                  ‐                271, 450       

La Parrilla 61,546        676            202,698          42                 1,708,152     1,398,922    420,712        

Del Toro 26,587        292            77,729            28                 744,651        ‐                122, 879       

Total 736,896      8,098         3, 193,566       33,576          2,452,803     1,398,922    6,410,483     

At the Santa Elena Silver/Gold Mine: 

 During the quarter, Santa Elena produced 596,872 ounces of silv er and 9,839 ounces of gold for a total 

production of 1,461,345 silver equivalent ounces, reflecting a 4% increase compared to the prior quarter. 

 The  mill  processed  a  total  of  229,761  tonnes,  consisting  of  142,831  tonnes  of  underground  ore  and 

86,930 tonnes from the above ground heap leach pad.  

 Silver and gold grades from underground ore averaged 123 g/t and 1.89 g/t, respectively. Silver and gold 

grades from the above ground heap leach pad averaged 38 g/t and 0.64 g/t, respectively.  

 Silver and gold recoveries averaged 89% and 94%, respectively, during the quarter.  

 The Company received a positive Unified Technical Document ("DT U") permit for the Ermitaño project 

in May. Project design and conceptual mine planning is currentl y underway. Development activities are 

expected  to  begin  in  the  fourth  quarter  of  2019  with  portal  excavation  for  underground  access.  In 

addition, the Company has increased its 2019 exploration budget  at Ermitaño to approximately 32,700 

metres, representing an 85% increase from the original 2019 bud get of 17,700 metres, with the goal of 

increasing the confidence level and adding new Resources by testing targets at depth.    

 The installation of the new 3,000 tpd HIG mill was successfully  completed in May and has since passed 

all cold and hot commissioning tests. The mill is expected to r each full capacity in the third quarter of 

2019.   

At the La Encantada Silver Mine: 

 During the quarter, La Encantada produced 489,194 ounces of sil ver representing a 32% decrease from 

the previous quarter. The decrea se in silver production was pri marily due to a 23% decrease in tonnes 

milled and a 12% decrease in silver grades.  

 Silver grades and recoveries during the quarter averaged 110 g/t and 66%, respectively.  

 Production from the San Javier and La Prieta sub‐level caving a reas as well as the 660 area produced 

67,068  tonnes  with  an  average  silver  grade  of  111  g/t,  or  appro ximately  32%  of  total  quarterly 

production.  

 Due  to  ongoing  challenges  with  the  roasters  material  handling  sy s t e m ,  t h e  C o m p a n y  h a s  c o n t r a c t e d  

Hatch,  an  external  consulting  and  project  engineering  firm,  to recommend  design  improvements  to 

resolve the cooling and material handling issues. A final report with recommendations is expected to be 

delivered by Hatch in the third quarter. During this redesign process, production from the roaster will be 

suspended until the necessary modifications have been completed.  

At the San Martin Silver Mine: 

 During the quarter, San Martin produced 224,056 ounces of silve r and 543 ounces of gold for a total 

production of 271,450 silver equivalent ounces, reflecting a 36% decrease compared to the prior quarter. 

The decrease in production was primarily attributed to a 37% de crease in tonnes milled due to limited 

production stopes in May and June. 

 Silver grades and recoveries averaged 197 g/t and 90%, respectively, during the quarter. In addition, gold 

grades and recoveries averaged 0.46 g/t and 93%, respectively.  

 Subsequent to quarter end, the Company temporarily suspended al l mining and processing activities at 

the San Martin operation due to a growing insecurity in the area and safety concerns for our workforce. 

The Company is working with authorities to secure the area in a nticipation of restarting the operation, 

a l t h o u g h  i t  i s  n o t  k n o w n  w h e n  t h a t  m i g h t  o c c u r .  F u r t h e r m o r e ,  t he  Company  does  not  expect  the 

suspension at San Martin to have a material impact on its 2019 annual consolidated guidance.  

At the La Parrilla Silver Mine: 

 During the quarter, the flotation circuit processed 61,546 tonnes with an average silver grade of 147 g/t 

and a 70% recovery for a total production of 420,712 silver equivalent ounces.  

 The lead circuit processed an average lead grade of 2.1% with recoveries of 59% for total lead production 

of 1.7 million pounds, representing a 12% decrease compared to the previous quarter.  

 The zinc circuit processed an average zinc grade of 2.0% with recoveries of 52% for total zinc production 

of 1.4 million pounds, representing an 11% increase compared to the previous quarter.  

 The high recovery microbubble project advanced in the second qu arter with the installation of the four 

microcell  columns,  electrical  power  distribution  system  and  vib ratory  screen.  At  the  end  of  June, 

approximately 75% of the project had been completed.  

 The  Company  is  reviewing  toll  milling  opportunities  from  third party  suppliers  as  well  as  evaluating 

methods  to  produce  a  new  bulk  concentrate  at  Del  Toro  to  be  shipped  to  La  Parrilla  and  further 

processed through the microbubble flotation cells to create separate concentrates of lead and zinc from 

Del Toro.  

At the Del Toro Silver Mine: 

 During  the  quarter,  Del  Toro  produced  a  total  of  122,879  silver  equivalent  ounces  reflecting  a  10% 

increase compared to the prior quarter primarily due to a 6% increase in tonnes milled and a 5% increase 

in silver recoveries.  

 Silver grades and recoveries during the quarter averaged 117 g/t and 78%, respectively.  

 Lead grades and recoveries averaged 1.9% and 68%, respectively, producing a total of 0.7 million pounds 

of lead representing a 4% increase compared to the previous quarter.  

APPOINTMENT OF GENERAL COUNSEL AND VP OF INFORMATION TECHNOLOGY  

The Company is pleased to announce the appointment of Sophie Hs ia as General Counsel. Ms. Hsia was most 

recently General Counsel and Vice President Risk at Imperial Metals Corporation. During her tenure at Imperial, 

she  successfully  managed  the  legal  and  risk  portfolios  responding  to  the  subsurface  failure  of  the  perimeter 

embankment at the Mount Polley mine, including a significant settlement of Imperial’s lawsuit against its tailings 

dam design engineers. Ms. Hsia has a Bachelor of Laws and a Bac helor of Civil Law from McGill University in 

Montreal and a Master of Laws fr om George Washington University  in Washington D.C.  She was called to the 

Bar  in  Ontario  in  2002,  and  in  Alberta  and  British  Columbia  in 2006  and  has  previously  worked  for  leading 

international law firms in Toronto, Calgary and Vancouver. 

In addition, the Company has recently hired Jose Figueroa, an information technology professional with over 20 

years of SAP experience, as Vice President of Information Techn ology to manage all IT solutions and enterprise 

applications. Prior to joining First Majestic, Mr. Figueroa worked at Goldcorp as Director of IT and was responsible 

for overseeing a global support team with over 80 application e xperts located in Mexico City and Vancouver. 

Before  joining  Goldcorp  in  2013,  M r.  Figueroa  worked  in  the  tec hnology  services  industry  delivering  SAP 

consulting solutions to various mining, building materials, paper and cement firms.  Mr. Figueroa graduated from 

Tecnológico  de  Monterrey  in  Monterrey,  Mexico  with  a  bachelor’s   degree  in  Industrial  and  Systems 

Engineering.       

CONFERENCE CALL 

The Company will be holding a co nference call and webcast today , July 15, 2019 at 8 am PDT (11 am EDT) to 

discuss the quarterly results.   

To participate in the conference call, please dial the following: 

Toll Free Canada & USA:   1‐800‐319‐4610 

Outside of Canada & USA:  1‐604‐638‐5340 

Toll Free Germany:   0800 180 1954 

Toll Free UK:   0808 101 2791 

Participants should dial in 10 minutes prior to the conference.  

Click on WEBCAST on the First Majestic homepage as a simultaneo us audio webcast of the conference call will 

be posted at www.firstmajestic.com. 

The conference call will be recorded and you can listen to an archive of the conference by calling:  

  Canada & USA Toll Free:    1‐800‐319‐6413 

  Outside Canada & USA:      1‐604‐638‐9010 

  Access Code:         3344 followed by the # sign 

The  replay  will  be  available  approximately  one  hour  after  the  conference  and  will  available  for  seven  days 

following the conference.  The replay will also be available on the Company’s website for one month. 

UPDATED OUTLOOK AND Q2 EARNINGS ANNOUNCEMENT 

The Company is planning to update its 2019 production and capital budget guidance when it releases its second 

quarter 2019 unaudited financial results on Wednesday, August 7, 2019. 

ABOUT THE COMPANY 

First Majestic is a publicly traded mining company focused on s ilver production in Mexico and is aggressively 

pursuing the development of its existing mineral property assets. The Company presently owns and operates the 

San Dimas Silver/Gold Mine, the Santa Elena Silver/Gold Mine, the La Encantada Silver Mine, the La Parrilla Silver 

Mine, the San Martin Silver Mine and the Del Toro Silver Mine. Production from these mines are projected to be 

between 14.2 to 15.8 million silver ounces or 24.7 to 27.5 million silver equivalent ounces in 2019. 

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call 

our toll‐free number 1.866.529.2807. 

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This  press  release  contains  “forward‐looking  information”  and  " forward‐looking  statements”  under  applicable  Canadian  and  U.S.  securities  laws 

(collectively,  “forward‐looking  statements”).  These  statements  r e l a t e  t o  f u t u r e  e v e n t s  o r  t h e  Company's  future  performance,  business  prospects  or 

opportunities that are based on forecasts of future results, es timates of amounts not yet determinable and assumptions of management made in light of 

management's experience and perception of historical trends, current conditions and expected future developments. Forward‐looking statements include, 

but are not limited to, statements with respect to: expectation s that the HIG mill at the Santa Elena mine will ramp up to rea ch design capacity of 3,000 

tpd in the third quarter, and th at overall metallurgical recoveries and lower energy costs will improve in the third quarter o f 2019 following the adoption 

of fine grinding technology; expectations that development activities will commence in the fourth quarter of 2019 with portal excavation for underground 

access  and  that  Ermitaño’s  high  grade  feed  should  significantly  increase  Santa  Elena’s  production  profile  and  extend  mine  life f o r  y e a r s  t o  c o m e ;  

expectations  that  the  Company  will  receive  a  formal  recommendation  report  from  Hatch  in  the  third  quarter  of  2019  regarding  potential  design 

improvements to resolve the cooling and material handling issue s encountered with the La Encantada roasters material handling  system; expectations 

that the temporary suspension of  the San Martin mine will not h ave a material impact on its 201 9 annual consolidated guidance;  ongoing evaluation of 

methods to produce a new bulk concentrate at Del Toro to be shipped to La Parrilla and further processed through the microbubble flotation cells to create 

separate concentrates of lead and zinc from Del Toro; the Compa ny’s business strategy; future planning processes; commercial m ining operations; cash 

flow; budgets; the timing and amount of estimated future production; recovery rates; mine plans and mine life; the future price of silver and other metals; 

costs  of  production;  costs  and  timing  of  the  development  of  new   deposits;  capital  projects  and  exploration  activities  and  the  possible  results 

thereof. Assumptions  may  prove  to  be  incorrect  and  actual  result s  m a y  d i f f e r  m a t e r i a l l y  f r o m  t hose  anticipated.  Consequently, guidance  cannot  be 

guaranteed. As such, investors are cautioned not to place undue  reliance upon guidance and forwar d‐looking statements as there  can be no assurance 

that the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐

looking  statements.  Statements  concerning  proven  and  probable  min era l r e s er v e s a n d  m in e r a l re s o ur c e e s tim a te s  m a y a ls o  be  d ee med to  constitute 

forward‐looking statements to the extent that they involve esti mates of the mineralization that  will be encountered as and if  the property is developed, 

and in the case of measured and indicated mineral resources or  proven and probable mineral reserves, such statements reflect t he conclusion based on 

certain assumptions that the mineral deposit can be economically exploited. Any statements that express or involve discussions with respect to predictions, 

expectations,  beliefs,  plans,  projections,  objectives  or  future e v e n t s  o r  p e r f o r m a n c e  ( o f t e n ,  b u t  n o t  a l w a y s ,  u s i n g  w o r d s  o r  phrases  such  as  “seek”, 

“anticipate”,  “plan”,  “continue”, “ e s t i m a t e ” ,  “ e x p e c t ” ,  “ m a y ” ,  “will”,  “project”,  “predict”,  “forecast”,  “potential”,  “target”,  “intend”,  “could”,  “might”, 

“should”, “believe” and similar expressions) are not statements of historical fact and may be “forward‐looking statements”. 

Actual results may vary from for ward‐looking statements. Forward‐looking statements are subject to known and unknown risks, un certainties and other 

factors that may cause actual results to materially differ from  those expressed or implied by suc h forward‐looking statements,  including but not limited 

to:  risks  related  to  the  integration  of  acquisitions;  actual  results  of  exploration  activities;  conclusions  of  economic  evaluations;  changes  in  project 

parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment 

or  processes  relative  to  specifications  and  expectations;  accidents;  labour  relations;  relations  w i t h  l o c a l  c o m m u n i t i e s ;  c h a n ges  in  national  or  local 

governments; changes in applicable legislation or application t hereof; delays in obtaining approvals or financing or in the co mpletion of development or 

construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; 

outcomes of pending litigation; limitations on insurance covera ge as well as those factors discussed in the section entitled " Description of the Business ‐ 

Risk Factors" in the Company's most recent Annual Information Form, available on www.sedar.com, and Form 40‐F on file with the United States Securities 

and Exchange Commission in Washington, D.C.  Although First Majestic has attempted to identify important factors that could cause actual results to differ 

materially  from  those  contained i n  f o r w a r d ‐ l o o k i n g  s t a t e m e n t s ,  there  may  be  other  factors  that  cause  results  not  to  be  as  anticipated,  estimated  or 

intended. 

The  Company  believes  that  the  expectations  reflected  in  these  forward‐looking  statements  are  reasonable,  but  no  assurance  can be  given  that  these 

expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only 

as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward‐looking statements, except as required 

by applicable laws.