FR Frankfurt – FMV First Majestic Files Updated Technical Report for the Santa Elena Silver/Gold Mine in Sonora, Mexico Including a Positive Pre‐Feasibility Study for the Ermitaño Project; Appoints Vice‐President of Exploration

Technical Reports (NI 43-101) Management Changes Economic Studies

New York – AG               November 24, 2021           

Toronto – FR 

Frankfurt – FMV  

First Majestic Files Updated Technical Report for the Santa Elena Silver/Gold Mine in Sonora, 

Mexico Including a Positive Pre‐Feasibility Study for the Ermitaño Project; 

Appoints Vice‐President of Exploration 

Vancouver, BC, Canada ‐ FIRST MAJESTIC SILVER CORP. (AG: NYSE; FR: TSX) (the "Company" or “First Majestic”) 

is pleased  to announce  it has  filed  an updated  technical  report  in accordance  with  National  Instrument  

43‐101   –  Standards   of  Disclosure   for   Mineral   Projects   for   its  Santa   Elena   Silver/Gold   Mine   in  Sonora,  

Mexico.   The   report   also   includes   positive  results  of  a  Pre‐Feasibility  Study  (“PFS”)  completed  for  its  100% 

owned  Ermitaño  Project  which  is  located  only  four  kilometres  east  of  the  Santa  Elena  processing  plant.  The 

Company  has  filed  the  Technical  Report  on  its  website  (www.firstmajestic.com)  under  the  Reserves  and 

Resources section and on SEDAR (www.sedar.com) under First Majestic’s issuer profile. All amounts are in U.S. 

dollars unless stated otherwise. 

UPDATED MINERAL RESERVE & RESOURCE ESTIMATES FOR SANTA ELENA  

(compared to Mineral Reserve and Resource estimates on December 31, 2020)  

 Proven  and  Probable  Mineral  Reserves  (“P&P”)  increased  59%  to  51.0  million  silver  equivalent  ounces 

consisting of 12.6 million ounces of silver and 418.4 thousand ounces of gold. Average P&P grades increased 

30% to 314 AgEq g/t (78 g/t silver and 2.58 g/t gold)  

 Measured and Indicated Mineral Resources (“M&I”) increased 7% to 69.2 million silver equivalent ounces 

consisting of 18.9 million ounces of silver and 557 thousand ounces of gold. Average M&I grades increased 

8% to 355 AgEq g/t (97 g/t silver and 2.85 g/t gold)  

 Inferred Resources decreased 13% to 62.4 million silver equivalent ounces consisting of 16.2 million ounces 

of silver and 490 thousand ounces of gold. Average Inferred grades increased 6% to 310 AgEq g/t (80 g/t 

silver and 2.43 g/t gold)  

PRE‐FEASIBILITY STUDY HIGHLIGHTS 

 Pre‐tax NPV5% of $133.7 million  

 Pre‐tax IRR of 54% 

 After‐tax NPV5% of $64.8 million  

 After‐tax IRR of 34%   

 Life of mine (“LOM”) of seven years, based only on P&P Reserves, extending the life of mine at Santa Elena 

including  the  Ermitaño  Project  until  2027  producing  an  estimated  10.3  million  ounces  of  silver  and  396 

thousand ounces of gold  

 After‐tax payback of 44 months, or 3.7 years, as of June 2021   

2 

 LOM consolidated average cash costs at the Santa Elena mining complex is estimated at $105 per tonne, 

including royalties and selling costs 

“We are very excited to  deliver  this updated  Reserves  and Resource  statement for our Santa  Elena operation 

which  includes  for  the  first  time,  the  addition  of  Mineral  Reserves  at  our  Ermitaño  project  located  only  four 

kilometers away from the Santa Elena processing plant,” stated Keith Neumeyer, President and CEO. “I am also 

very pleased to report that we celebrated Ermitaño’s first doré pour from development stockpiles at the Santa 

Elena mill in early November. Ore production from this important new mine is anticipated to ramp up throughout 

2022 and into 2023. I would like to congratulate our exploration, operation and technical services teams for their 

hard work and dedication over the past six years to prepare Santa Elena for its next phase of production growth.”  

Mr. Neumeyer continued, “I am also pleased to welcome Gonzalo Mercado to the First Majestic team as Vice‐

President of Exploration. Gonzalo’s wealth of exploration knowledge and industry expertise make him a valuable 

addition to our team and I look forward to working with him as we continue to grow the Company.” 

PFS OVERVIEW 

The financial analysis of Santa Elena considers only revenue from Proven and Probable Mineral Reserves. The 

analysis considers current and projected costs incurred at the Santa Elena mine, processing plant, plus existing 

contractor quotes for estimating costs for development in the Santa Elena mine and at the Ermitaño project. 

A general financial summary for Santa Elena, which includes the Santa Elena mine, the Ermitaño project, and 

reclaiming of the remaining leach pad material is provided in Table 1 Metal prices assumptions used to calculate 

the economic parameters below were $22.50/oz for silver and $1,700/oz for gold.  

Table 1: Santa Elena Financial Summary 

Item Units Total

Net Revenue $M 884.6

Total Costs (excluding taxes) $M (719.4)

Net Profit Before Tax $M 165.2

Net Profit After Tax (37.5%) $M 85.0

NPV Before Tax (DCFBT @ 5%) $M 133.7

NPV After Tax (DCFAT @ 5%) (37.5%) $M 64.8

IRR Before Tax % 54%

IRR After Tax (37.5%) % 34%

Maximum Cash Outlay $M (60.4)

Payback (discounted, after tax from June 2021) months 44

The  sensitivity  analyses  completed  shows  the  relative  strength  of  the  project  under  changes  to  commodity 

prices, which along with metallurgical recoveries, impact the financial performance of the mine complex more 

so than changes to operating or capital cost estimates. 

Table 2 summarise the sensitivity to the after‐tax net present value due to changes in the applied discount rate. 

3 

Table 2: Project Sensitivity to Silver and Gold Price ‐ NPV @ 5% $M (After Tax) 

NPV ($M)

After Tax Silver Price ($/oz Ag) and Gold Price ($/oz Au)

Discount 1,550 Au 1,600 Au 1,650 Au 1,700 Au 1,750 Au 1,800 Au 1,850 Au

Rate 19.50 Ag 20.50 Ag 21.50 Ag 22.50 Ag 23.50 Ag 24.50 Ag 25.50 Ag

Base Case

3% 22.5 39.2 55.9 72.3 88.8 105.3 121.8

5% 17.4 33.3 49.2 64.8 80.5 96.2 111.8

7% 12.7 28.0 43.1 58.0 72.9 87.8 102.7

10% 6.4 20.8 34.9 48.8 62.7 76.7 90.6

The impact to the after‐tax IRR for each of the revenue scenarios are also summarised in Table 3. The sensitivity 

demonstrates that even at the lower commodity prices scenario, Santa Elena demonstrates positive IRR.  

Table 3: IRR Project Sensitivity (After Tax) 

IRR (%)

After Tax Silver Price ($/oz Ag) and Gold Price ($/oz Au)

1,550 Au 1,600 Au 1,650 Au 1,700 Au 1,750 Au 1,800 Au 1,850 Au

19.50 Ag 20.50 Ag 21.50 Ag 22.50 Ag 23.50 Ag 24.50 Ag 25.50 Ag

IRR 13% 20% 27% 34% 41% 48% 55%

MINERAL RESOURCE & MINERAL RESERVE ESTIMATES 

The Mineral Resources were classified into Measured, Indicated, or Inferred categories based on the confidence 

in the geological interpretation and models, the confidence in the continuity of metal grades, the sample support 

for the estimation and reliability of the sample data, and on the presence of underground mining development 

providing detailed mapping and production channel sample support. 

The Mineral Resource estimates for Santa Elena and Ermitaño are summarized in Table 4 and Table 5 using the 

silver‐equivalent  (Ag‐Eq)  cut‐off  grades  appropriate  for  the  mining  method  assigned  to  each  domain,  and  an 

effective date of June 30, 2021. Measured and Indicated Mineral Resources are reported inclusive of Mineral 

Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.  

Table 4: Santa Elena Silver/Gold Mine Mineral Resource Estimates, Measured and Indicated Category  

(Effective date June 30, 2021) 

4 

Table 5: Santa Elena Silver/Gold Mine Mineral Resource Estimates, Inferred Category (Effective date June 30, 2021) 

(1) Mineral Resource estimates are classified in accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves, 

whose definitions are incorporated by reference into NI 43‐101. 

(2) The Mineral Resource estimates are based on internal estimates prepared as of June 30, 2021. The information provided was reviewed 

and prepared by Phillip Spurgeon, P.Geo., a First Majestic employee. 

(3) Silver‐equivalent grade is estimated considering metal price assumptions, metallurgical recovery, and the metal payable terms. 

Ag‐Eq = Ag Grade + (Au Grade x Au Recovery x Au Payable x Au Price) / (Ag Recovery x Ag Payable x Ag Price). 

(4) Metal prices used in the Mineral Resources estimates were $26.00/oz Ag and $1,850/oz Au. 

(5) Metallurgical recovery was 92.7% for silver and 95.5% for gold for Santa Elena and the heap leach pad. For Ermitaño, the metallurgical 

recovery used was 72.0% for silver and 98.0% for gold. 

(6) Metal payable used was 99.85% for silver and 99.80% gold. 

(7) The cut‐off grade used to constrain the Mineral Resource estimate was 95 g/t Ag‐Eq for all Santa Elena mine domains and 70 g/t Ag‐

Eq for the heap leach pad. The cut‐off grade used for the Ermitaño zone domains was 135 g/t Ag‐Eq. The cut‐offs used were based on 

actual and budgeted operating and sustaining costs.  

(8) Tonnage is expressed in thousands of tonnes; metal content is expressed in thousands of ounces. 

(9) Totals may not add up due to rounding. 

(10)  Measured  and  Indicated  Mineral  Resources  are  reported  inclusive  of  Mineral  Reserves.  Mineral  Resources  that  are  not  Mineral 

Reserves do not have demonstrated economic viability. 

The  Mineral  Reserves  estimation  process  consists  of  converting  Mineral  Resources  into  Mineral  Reserves  by 

identifying material that exceeds the mining cut‐off grades while conforming to specified geometrical constraints 

determined by the applicable mining method and applying modifying factors such as mining dilution and mining 

recovery factors. If the Mineral Resources comply with the previous constraints, Measured Resources could be 

converted to Proven Reserves and Indicated Resources could be converted to Probable Reserves, and, in some 

instances, Measured Resources could be converted to Probable Reserves if any or more of the modifying factors 

reduces the confidence of the estimates. 

The Mineral Reserves for the Santa Elena mining complex are presented in Table 6. 

5 

Table 6: Santa Elena Consolidated Mineral Reserves Statement (Effective Date June 30, 2021) 

(1)  Mineral  Reserves  have  been  classified  in  accordance  with  the  Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum  (“CIM”) 

Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into NI 43‐101. 

(2)  The  Mineral  Reserves  statement  provided  in  the  table  above  is  based  on  internal  estimates  prepared  as  of  June  30,  2021.  The 

information provided was prepared and reviewed under the supervision of Ramon Mendoza Reyes, PEng, and a Qualified Person ("QP") 

for the purposes of NI 43‐101. 

(3) The cut‐offs were estimated considering metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral 

process and the metal payable of the selling contract.  

a) Silver‐equivalent grades were estimated for Santa Elena underground mine and the Leach Pad material. 

b) Cut‐off value was estimated for the Ermitaño project material.  

c) Metal prices considered for Mineral Reserves estimates were $24.00 /oz Ag and $1,700.00 /oz Au. 

d) Other key assumptions and parameters include: Metallurgical recoveries; metal payable for silver and gold; direct mining and haulage 

costs, mill feed, process and treatment costs, sustaining costs and indirect costs including general and administration costs and are 

different for each deposit as described in tables 15‐10, 15‐11 and 15‐12 of the Technical Report.  

(4) A two‐step constraining approach has been implemented to estimate reserves for each mining method in use: A General Cut‐Off Grade 

(GC) was used to delimit new mining areas that will require development of access, infrastructure, and all sustaining costs. A second 

Incremental Cut‐Off Grade (IC) was considered to include adjacent mineralized material which recoverable value pays for all associated 

costs, including but not limited to the variable cost of mining and processing, indirect costs, treatment, administration costs and plant 

sustaining costs but excludes the access development assumed to be covered by the block above the GC grade. 

(5) Modifying factors for conversion of resources to reserves include consideration for planned dilution due to geometric aspects of the 

designed  stopes  and  economic  zones,  and  additional  dilution  consideration  due  to  unplanned  events,  materials  handling  and  other 

operating aspects. Mineable shapes were used as geometric constraints. 

(6) Tonnage is expressed in thousands of tonnes; metal content is expressed in thousands of ounces. Metal prices and costs expressed in 

USD. 

(7) Numbers have been rounded as required by reporting guidelines. Totals may not sum due to rounding. 

PROCESSING & RECOVERY METHODS 

To  date,  the  Santa  Elena  processing  plant  processes  a  blended  feed  consisting  of  high‐grade  underground 

mineralized material and spent ore from the existing heap leach pad. The processing plant has been successfully 

operating for several years and has continuously improved silver and gold metallurgical recoveries. The process 

is based on cyanide tank leaching and Merrill‐Crowe smelting of fine‐ground ore to produce silver–gold doré 

bars. The nominal plant capacity is for the processing of 3,000 tpd with the possibility for higher throughput rates 

depending on ore hardness, targeted final grind and leaching residence time. Typical metal recoveries for the 

Santa  Elena  mineralized  material  ranged  from  91%  to  94%  for  silver  and  94%  to  97%  for  gold  from  the 

combination of run‐of‐mine production from the underground mine and the leach pad material. 

Tonnage

(kt) Ag Au Ag ‐Eq Ag Au Ag ‐Eq

(g/t) (g/t) (g/t) (k  Oz) (k  Oz) (k  Oz)

Santa Elena Proven Oxides  + Sulphides 640             120             1.23            210             2,460          25.4            4,330         

Ermitaño Proven Sulphides 59                16               3.11            314             30                5.9              600             

Total Proven Oxides  + Sulphides 699             111             1.39            219             2,490          31.3            4,930         

Santa Elena Probable Oxides  + Sulphides 1,289          120             1.24            210             4,960          51.2            8,710         

Ermitaño Probable Sulphides 2,775           54               3.71            412             4,850          330.9          36,750       

Leach Pad Probable Oxides  Spent Ore 283             31               0.56            72               280              5.1              650             

Total Probable Oxides  + Sulphides 4,347          72               2.77            330             10,090        387.2          46,110       

Santa Elena P&P Oxides  + Sulphides 1,929          120             1.24            210             7,420          76.6            13,030       

Ermitaño P&P Sulphides 2,835           54               3.69            410             4,880          336.7          37,340       

Leach Pad P&P Oxides  Spent Ore 283             31               0.56            72               280              5.1              650             

Total Proven & Probable Oxides  + Sulphides 5,047          78               2.58            314             12,580        418.4          51,020       

Category Mineral  Type

Grade Metal  Content

6 

With  the  introduction  of  mineralized  material  from  Ermitaño,  starting  with  industrial  trials  in  Q4  2021  and 

commercial production in 2022, the plant is expected to continue to process Santa Elena blended material in 

campaigns alternating with mineralized material from Ermitaño. There are significant differences between these 

two ores in hardness and metallurgical performance at different grinding sizes. To achieve optimum levels of 

metal recoveries and the corresponding maximum metal production, the Santa Elena ore will be processed at 

higher  throughput  rates  than  the  Ermitaño  ore  during  their  corresponding  production  campaigns.  Average 

operating throughput targets are 3,350 and 2,350 tpd for Santa Elena and Ermitaño, respectively. 

The  process  plant  is  mostly  built  as  a  single  train  with  the  crushing  area  split  from  the  remaining  areas  and 

connected through a belt conveyor to transfer the crushed product to the fine stockpiles. The current leaching 

plant includes a grinding ball mill, one Outotec HIG‐Mill, leaching tanks, three counter‐current decantation or 

washing tanks, a previously processed leach‐pad, a belt‐filter facility and a filtered‐tailings storage facility. The 

processing plant is planned to be modified with the commissioning of a new filter‐press, an additional leaching 

tank and a fourth CCD thickener in the fourth quarter of 2022.  

Due to the high purity of the Santa Elena doré (>98% silver and gold), no penalties are applied by the refineries 

for the presence of heavy metals. This purity is expected to be maintained after processing the Ermitaño ore. 

CAPITAL & OPERATING COSTS 

The  Santa  Elena  mine  has  been  under  First  Majestic  operation  since  October  2015.  The  sustaining  capital 

expenditures  are  budgeted  on  an  as‐required  basis,  established  on  actual  conditions  at  the  mine  and  the 

processing  plant  infrastructure.  The  LOM  plan  includes  estimates  for  sustaining  capital  expenditures  for  the 

mining and processing activities required. Sustaining capital expenditures will mostly be allocated for on‐going 

development,  infill  drilling,  mine  equipment  rebuilding,  major  equipment  overhauls  or  replacements,  plant 

maintenance and on‐going refurbishing, and for tailings management facilities expansion as needed. 

The amount of exploration conducted to find new targets, with the objective of replacing and/or expanding the 

Mineral Resources will be dependent on the success of exploration and diamond drilling programs. Sustaining 

capital is focused on maintaining current operational capacities, plant and equipment, while expansionary capital 

is focussed on expanding new sources of mineralization.  

The  Ermitaño  project  continues  development  towards  the  western  limit  of  the  mineralized  zone,  which  is 

planned to be mined at the beginning of 2022. The mining activities are being completed by an experienced 

contractor that also operates at the Santa Elena mine. Estimated expenses for development are based on existing 

contracts as it is proposed that contractors continue carrying out all mine waste development.  

Included in the capital expense is an allocation for infill exploration drilling to support the LOM plan presented 

in the Technical Report. Table 7 presents the consolidated summary of the capital expenditures for Santa Elena 

and Ermitaño.  

7 

Table 7: Santa Elena Consolidated Capital Costs Summary 

Type Units Total 2021 2022 2023 2024 2025 2026 2027

Shared Capital

(Surface) $ M $23.7 $1.1 $22.4 $0.2 - - - -

Mining

Development $ M $70.0 $18.0 $28.4 $19.8 $3.4 $0.4 - -

Property, Plant &

Equipment $ M $100.8 $20.6 $27.6 $21.4 $8. 5 $10.3 $11.1 $1.3

Total Capital

Costs $ M $194.5 $39.7 $78.3 $41.5 $12.0 $10.7 $11.1 $1.3

The consolidated average cash costs are estimated at $105/tonne, including royalties and selling costs. Operating 

costs exclude the streaming impacts on the Santa Elena revenue, where approximately 6.3% of the revenue from 

the Santa Elena mine, including the leach pad, is paid to a third party.  Revenue from the Ermitaño mine is subject 

to a 4% NSR royalty. Estimated royalty payments are included in the operating cost summary as presented in 

Table 8 and Table 9. 

Table 8: Complex Average Unit Operating Costs 

Type  $/tonne 

Mining Cost  $57.6 

Processing Cost  $39.0 

Indirect Costs  $2.8 

Total Production Cost  $99.3 

Refining, Selling Costs  $0.8 

Royalties  $4.9 

Total Cash Cost  $105.1 

Table 9: Santa Elena Consolidated Annual Operating Costs 

Type  Units  Total  2021  2022  2023  2024  2025  2026  2027 

Mining Cost  $ M  $287.6  $29.5  $67.5  $55.4  $44.5  $36.6  $35.0  $19.2 

Processing Costs  $ M  $194.7  $15.9  $33.2  $33.1  $33.9  $31.2  $29.3  $18.0 

Indirect Costs  $ M  $14.1  $1.1  $2.3  $2.3  $2.3  $2.3  $2.3  $1.5 

Total Production 

Cost  $ M  $496.3  $46.6  $102.9  $90.8  $80.6  $70.1  $66.6  $38.7 

Refining, Selling 

Costs  $ M  $4.0  $0.3  $0.8  $0.7  $0.8  $0.7  $0.5  $0.2 

Royalties  $ M  $24.5  $0.6  $3.7  $6.9  $5.9  $3.4  $2.5  $1.5 

Total Cash Cost  $ M  $524.9  $47.6  $107.5  $98.3  $87.3  $74.2  $69.6  $40.4 

QUALIFIED PERSONS NI 43‐101 TECHNICAL REPORT 

This  news  release  has  been  reviewed  and  approved  by  Ramón  Mendoza  Reyes,  P.Eng.,  Vice  President  of 

Technical Services and a Qualified Person as defined by National Instrument 43‐101 – Standards of Disclosure 

for  Mineral  Projects  (“NI  43‐101”).  In  addition,  the  technical  information  in  this  news  release  has  also  been 

reviewed and approved by the following Qualified Persons: Phillip J. Spurgeon, P. Geo., Maria Elena Vazquez 

Jaimes, P. Geo. and Persio Pellegrini Rosario, P. Eng. 

8 

APPOINTMENT OF VICE‐PRESIDENT OF EXPLORATION 

Mr. Gonzalo Mercado is a Professional Geologist, who brings over 20 years of global geological experience to the 

First Majestic team. Mr. Mercado is a geology graduate from the National University of Tucuman in Argentina 

and commenced his mining career with Barrick Gold in Argentina. During his career at Barrick, he held the roles 

of Senior Exploration Geologist, Project Geologist, Country Manager of Geology, Senior Project Manager, as well 

as time in the Toronto Corporate head office working with the Business Development Group on acquisitions and 

investor relations. Most recently Mr. Mercado has been the exploration leader for Nevada Gold Mines, a joint 

venture  between  Barrick  Gold  and  Newmont  Mining,  where  he  was  responsible  for  all  exploration  activities 

within Nevada. 

ABOUT THE COMPANY 

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United 

States. The Company presently owns and operates the San Dimas Silver/Gold Mine, the Jerritt Canyon Gold Mine, 

the Santa Elena Silver/Gold Mine and the La Encantada Silver Mine. 

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call 

our toll‐free number 1.866.529.2807. 

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains “forward‐looking information” and "forward‐looking statements” under applicable Canadian and U.S. securities laws (collectively, 

“forward‐looking statements”). These statements relate to future events or the Company's future performance, business prospects or opportunities that 

are  based  on  forecasts  of  future  results,  estimates  of  amounts  not  yet  determinable  and  assumptions  of  management  made  in  light  of  management's 

experience and perception of historical trends, current conditions and expected future developments. Forward‐looking statements include, but are not 

limited to, statements with respect to: the Company’s business strategy; future planning processes; commercial mining operations; cash flow; budgets; the 

timing and amount of estimated future production; ore grades; recovery rates; rates of return; mine plans and mine life; integration of operations; future 

sales; the future price of silver and other metals; costs of production; costs and timing of development at the Company's projects; estimates of royalty 

payments; commencement of initial batch test processing at the Santa Elena processing plant; capital projects and exploration activities and the possible 

results thereof. Assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Consequently, guidance cannot be 

guaranteed. As such, investors are cautioned not to place undue reliance upon guidance and forward‐looking statements as there can be no assurance that 

the plans, assumptions or expectations upon which they are placed will occur. All statements other than statements of historical fact may be forward‐looking 

statements.  Statements  concerning  proven  and  probable  mineral  reserves  and  mineral  resource  estimates  may  also  be  deemed  to  constitute  forward‐

looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the 

case  of  measured  and  indicated  mineral  resources  or  proven  and  probable  mineral  reserves,  such  statements  reflect  the  conclusion  based  on  certain 

assumptions  that  the  mineral  deposit  can  be  economically  exploited.  Any  statements  that  express  or  involve  discussions  with  respect  to  predictions, 

expectations,  beliefs,  plans,  projections,  objectives  or  future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “seek”, 

“anticipate”,  “plan”,  “continue”,  “estimate”,  “expect”,  “may”,  “will”,  “project”,  “predict”,  “forecast”,  “potential”,  “target”,  “intend”,  “could”,  “might”, 

“should”, “believe” and similar expressions) are not statements of historical fact and may be “forward‐looking statements”. 

Actual results may vary from forward‐looking statements. Forward‐looking statements are subject to known and unknown risks, uncertainties and other 

factors that may cause actual results to materially differ from those expressed or implied by such forward‐looking statements, including but not limited to: 

the duration and effects of the coronavirus and COVID‐19, and any other pandemics on our operations and workforce, and the effects on global economies 

and society, risks related to the integration of acquisitions; actual results of exploration activities; conclusions of economic evaluations; changes in project 

parameters as plans continue to be refined; commodity prices; variations in ore reserves, grade or recovery rates; actual performance of plant, equipment 

or  processes  relative  to  specifications  and  expectations;  accidents;  labour  relations;  relations  with  local  communities;  changes  in  national  or  local 

governments; changes in applicable legislation or application thereof; delays in obtaining approvals or financing or in the completion of development or 

construction activities; exchange rate fluctuations; requirements for additional capital; government regulation; environmental risks; reclamation expenses; 

outcomes of pending litigation; limitations on insurance coverage as well as those factors discussed in the section entitled "Description of the Business ‐ Risk 

Factors" in the Company's most recent Annual Information Form, available on www.sedar.com, and Form 40‐F on file with the United States Securities and 

Exchange Commission in Washington, D.C.  Although First Majestic has attempted to identify important factors that could cause actual results to differ 

materially from those contained in forward‐looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended.