FR Frankfurt – FMV Mexico ‐ AG First Majestic Produces 3.9M Silver Eqv. Oz in Second Quarter

Production Results

FIRST MAJESTIC SILVER CORP.

Suite 1805 – 925 West Georgia Street

Vancouver, B.C., Canada V6C 3L2

Telephone: (604) 688-3033 Fax: (604) 639-8873

Toll Free: 1-866-529-2807

Web site: www.firstmajestic.com; E-mail: [email protected]

NEWS RELEASE

New York – AG                           July 11, 2017 

Toronto – FR 

Frankfurt – FMV  

Mexico ‐ AG 

First Majestic Produces 3.9M Silver Eqv. Oz in Second Quarter

First Majestic Silver Corp. ("First Majestic" or the "Company") announces total production in the second quarter 

of  2017  from  its  six  operating  silver  mines  reached  3.9  million  equivalent  ounces  of  silver.  Total  production 

consisted of 2.3 million ounces of silver, 15,186 ounces of gold, 7.6 million pounds of lead and 0.9 million pounds 

of zinc.  

“During the quarter, silver production was impacted by unusual  efforts by unionized workers to illegally disrupt 

mining activities which caused minor stoppages at La Parrilla, Santa Elena and a more serious stoppage at our La 

Encantada operation,” said Keith Neumeyer, President & CEO. “Pointing to a specific cause is difficult – whether 

due  to  higher  gasoline  prices  or  higher  taxes  in  Mexico  ‐  but  worker  dissatisfaction  among  union  employees 

throughout the Mexican mining industry is at the highest levels witnessed in the Company’s fifteen year history.”  

Mr. Neumeyer continued, “I am, however, pleased that our action s to clear the three blockades and resume 

mining activities were successful. The National Union and Confe deration of Mexican Workers Union were both 

supportive of the actions taken by the Company which are expect ed to lead to improvements in productivity at 

each of the operations in the coming quarters. We anticipate production to be back on track in the third quarter 

and will work to recoup lost tonnage over the remainder of 2017. It is important to note that the construction of 

the new roaster at La Encantada was unaffected by the work stoppage and remains on schedule to be completed 

in early 2018.”   

Production Details Table: 

Q2  Q2  Y/Y  Q1  Q/Q 

2017  2016  Change  2017  Change 

Ore processed/tonnes milled  691,833  798,182  ‐13%  822,336  ‐16% 

Total production ‐ ounces of silver equivalent  3,888,944  4,681,608  ‐17%  4,267,350  ‐9% 

Total silver ounces produced  2,287,188  2,844,930  ‐20%  2,708,978  ‐16% 

Silver grade (g/t)  130  148  ‐12%  136  ‐5% 

Silver recovery (%)  79  75  6%  75  5% 

Gold ounces produced  15,186  16,371  ‐7%  15,047  1% 

Pounds of lead produced  7,625,328  8,825,234  ‐14%  7,453,972  2% 

Pounds of zinc produced  860,939  3,837,301  ‐78%  871,596  ‐1% 

2 

Quarterly Operational Review: 

Total ore processed during the quarter at the Company's six ope rating silver mines: Santa Elena, La Encantada, 

La  Parrilla,  Del  Toro,  San  Martin  and  La  Guitarra,  amounted  to 691,833  tonnes  representing  a  16%  decrease 

compared to the previous quarter. The decrease was primarily due to three illegal blockades in the quarter which 

amounted to four days at La Parrilla, two days at Santa Elena and 42 days at La Encantada.          

Silver grades in the quarter averaged 130 g/t compared to 136 g /t in the previous quarter. Silver grades remain 

under budget primarily due to lower than expected grades at Santa Elena, La Encantada and La Parrilla.   

Combined  silver  recoveries  averaged  79%,  up  5%  compared  to  the previous  quarter’s  average  of  75%.  The 

increase in silver recoveries was primarily due to the lower throughput rates and lower manganese grades at La 

Encantada.    

The Company's underground development in the second quarter con sisted of 15,121 metres, reflecting an 11% 

increase compared to 13,571 metres completed in the previous quarter. Development focused on opening new 

production areas, exploring high potential zones and new stope  preparation. As of June 30, 2017, the Company 

had completed approximately 38% of the 74,850 metres of underground development budgeted for 2017.   

During the quarter, a total of 17 diamond drill rigs were active across the Company’s properties consisting of 16 

rigs at the six producing mines and one rig at the Plomosas Sil ver Project. A total of 29,070 metres in 164 drill 

holes were completed on the seven properties. As of June 30, 2017, the Company had completed approximately 

32% of the 183,000 metres of exploration drilling budgeted for  2017. The Company is planning to increase the 

rig count to 25 rigs in the second half of 2017 in order to achieve program targets.   

Mine by Mine Quarterly Production Table: 

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*The following prices were used in the calculation of silver eq uivalent ounces: Silver: $17.21 per ounce; Gold: $1,257 per oun ce; Lead: $0.98 per pound; 

Zinc: $1.18 per pound.  

At the Santa Elena Silver/Gold Mine: 

 During the quarter, Santa Elena produced 557,914 ounces of silver and 11,522 ounces of gold for a total 

production of 1,399,940 silver equivalent ounces reflecting a 2% increase compared to the prior quarter.  

 The  mill  processed  a  total  of  232,451  tonnes,  consisting  of  134,699  tonnes  of  underground  ore  and 

97,752 tonnes from the above ground heap leach pad.  

 Silver and gold grades of underground ore averaged 115 g/t and 2.3 g/t, respectively. Whereas silver and 

gold grades from the above ground heap leach pad averaged 40 g/t and 0.7 g/t, respectively.  

 In April, the Company successfully completed the connection of the San Salvador ramp to the Main Vein 

along level 575 and began utilizing the additional mine access  point to reduce trucking bottlenecks and 

Mine

 Ore 

Processed 

 Tonnes 

per Day 

 Silver Grade 

(g/t) 

 Silver 

Recovery (%) 

 Silver Oz 

Produced 

 Gold Oz 

Produced 

 Pounds of 

Lead 

 Pounds of 

Zinc 

 Equivalent 

Silver Ounces 

Santa Elena 232,451      2,554         83                 90% 557,914           11,522          ‐                  ‐                1,399,940    

La Encantada 148,039      1,627         120               66% 374,901           9                   ‐                  ‐                375,563       

La Parrilla 132,880      1,460         131               76% 425,060           235               1,632,165     860,939       593,852        

Del Toro 81,843        899            173               80% 365,323           86                 5,993,164     ‐                712,714       

San Martin 67,073        737            234               85% 425,645           2,080            ‐                  ‐                577,598       

La Guitarra 29,547        325            188               77% 138,345           1,254            ‐                  ‐                229,276       

Total 691,833      7,603         130               79% 2,287,188        15,186          7,625,328     860,939       3,888,944     

3 

improve mine planning logistics. In addition, the new ramp is e xpected to support future exploration 

activities around the Tortuga vein.   

 A total of 2,613 metres of underg round development was complete d in the second quarter compared 

to 2,855 metres of development in the previous quarter.  

 A total of 2,608 metres of exploration drilling was completed i n the second quarter compared to 3,730 

metres of drilling in the previous quarter.   

At the La Encantada Silver Mine: 

 Production during the quarter was impacted by a 42 day work stoppage as a result of an illegal blockade 

(previously announced on May 24, 2017) by a rogue group of unionized workers who disagreed with the 

bonus that the Company and the National Union had previously ag reed to offer the miners in lieu of 

profit sharing. The blockade was successfully cleared on May 25, 2017 following a favourable agreement 

with the National Union. The operation restarted mining activities on June 27, 2017 and milling activities 

on July 1, 2017 following a technical suspension period for administration and retraining of personnel.   

 As a result of the work stoppage, silver production for the qua rter was 374,901 ounces representing a 

47% decrease over the previous quarter while tonnes milled decreased 44% over the same period.   

 Silver recoveries averaged 66% during the quarter, up from 60%  in the prior quarter, primarily due to 

the processing of ore with a 1% or less manganese content.  

 The manufacturing of the roasting project advanced in the secon d quarter with approximately 83% of 

the major components now complet ed. Preliminary compression dri lling tests were completed in June 

and foundations for the roaster are expected to be poured in Au gust. The Company will begin shipping 

completed part modules to the mine site in the third quarter.  

 A total of 562 metres of underground development were completed in the second quarter compared to 

587 metres of development in the previous quarter.  

 A total of 2,899 metres were drilled in the second quarter comp ared to 2,805 metres of drilling in the 

previous quarter.  

At the La Parrilla Silver Mine: 

 During the quarter, the flotation circuit processed 74,748 tonn es (821 tpd) with an average silver grade 

of 123 g/t and a 79% recovery while the cyanidation circuit pro cessed 58,132 tonnes (639 tpd) with an 

average  silver  grade  of  140  g/t  and  a  73%  recovery  for  total  production  of  593,852  silver  equivalent 

ounces.  

 The lead circuit processed an average lead grade of 1.4% with recoveries of 73% for total lead production 

of 1.6 million pounds, representing an 11% decrease compared to the previous quarter.  

 The zinc circuit processed an average zinc grade of 1.1% with recoveries of 48% for total zinc production 

of 0.9 million pounds, representing a 1% decrease compared to the previous quarter.  

 The Company’s central lab at La Parrilla completed and passed its second surveillance audit following its 

ISO 9001:2008 certification in May 2015. The audit determined t he facility was fully compliant with the 

management system quality standards for sample preparation, geochemical and assay services. The lab 

is expected to undergo certification testing for the ISO9001:2015 standard in 2018.  

 Underground development complet ed in the quarter totaled 3,233  metres compared to 2,827 metres 

developed in the previous quarter. 

 A total of 6,368 metres were drilled in the second quarter comp ared to 4,867 metres of drilling in the 

previous quarter. 

4 

At the Del Toro Silver Mine: 

 During  the  quarter,  Del  Toro  produced  a  total  of  712,714  silver  equivalent  ounces  reflecting  a  4% 

increase compared to the prior quarter.  

 Silver grades and recoveries during the quarter averaged 173 g/t and 80%, respectively.  

 Lead grades and recoveries averaged 4.8% and 70%, respectively, producing a total of 6.0 million pounds 

of lead representing a 7% increase compared to the previous quarter.  

 Underground development complet ed in the quarter totaled 3,222  metres compared to 2,710 metres 

developed in the previous quarter.  

 Total exploration metres drilled in the quarter amounted to 4,078 metres compared to 3,589 metres of 

drilling in the previous quarter.  

 The Company is planning to release an updated NI 43‐101 Technical Report in the third quarter. 

At the San Martin Silver Mine: 

 During the quarter, San Martin produced 425,645 ounces of silver and a record 2,080 ounces of gold for 

a total production of 577,598 silver equivalent ounces, reflecting an 11% increase compared to the prior 

quarter.  

 Silver grades and recoveries averaged 234 g/t and 85%, respectively, during the quarter. In addition, gold 

grades and recoveries averaged 1.0 g/t and 94%, respectively.  

 The dry stack filter presses were successfully installed during the quarter, with only minor electrical and 

piping work remaining to be completed before the system can be  tested. The filter presses, which are 

designed  to  recover  and  re‐use  tailings  solution  and  to  save  on w a t e r  c o n s u m p t i o n ,  a r e  e x p e c t e d  t o  

undergo testing at the end of July 2017.   

 Underground development completed in the quarter totaled 3,224 metres compared with 2,127 metres 

of development in the previous quarter.  

 Total exploration metres drilled in the quarter amounted to 7,3 52 metres compared to 4,136 metres of 

drilling in the previous quarter. 

At the La Guitarra Silver Mine: 

 During the quarter, La Guitarra  produced 138,345 ounces of silv er and 1,254 ounces of gold for a total 

production of 229,276 silver equivalent ounces. 

 Silver grades and recoveries averaged 188 g/t and 77%, respectively, during the quarter. In addition, gold 

grades and recoveries averaged 1.8 g/t and 74%, respectively.   

 A  total  of  2,093  metres  of  development  were  completed  in  the  second  quarter  compared  to  2,279 

metres of development in the previous quarter.  

 Total exploration metres drilled in the quarter amounted to 3,0 92 metres compared to 7,416 metres 

drilled in the previous quarter. 

Q2 Earnings Announcement and Conference Call 

The Company is planning to rel ease its second quarter 2017 unau dited financial results  on Thursday, August 3, 

2017. 

Furthermore, the Company will be holding a conference call and webcast on Friday, August 4, 2017 at 10 am PDT 

(1 pm EDT).   

To participate in the conference call, please dial the following: 

5 

Toll Free Canada & USA:   1‐800‐319‐4610 

Outside of Canada & USA:  1‐604‐638‐5340 

Toll Free Germany:   0800 180 1954 

Toll Free UK:   0808 101 2791 

Participants should dial in 10 minutes prior to the conference.  

Click on WEBCAST on the First Majestic homepage as a simultaneo us audio webcast of the conference call will 

be posted at www.firstmajestic.com. 

The conference call will be recorded and you can listen to an archive of the conference by calling:  

  Canada & USA Toll Free:    1‐800‐319‐6413 

  Outside Canada & USA:      1‐604‐638‐9010 

  Access Code:         1572 followed by the # sign 

The replay will be available approximately one hour after the c onference and will available for 7 days following 

the conference.  The replay will also be available on the Company’s website for one month. 

About the Company 

First  Majestic  is  a  mining  compan y  f o c u s e d  o n  s i l v e r  p r o d u c t i o n  in  Mexico  and  is  aggressively  pursuing  the 

development of its existing mineral property assets. The Compan y presently owns and operates six producing 

silver mines; the La Parrilla Silver Mine, the San Martin Silver Mine, the La Encantada Silver Mine, the La Guitarra 

Silver  Mine,  Del  Toro  Silver  Mine  and  the  Santa  Elena  Silver/Gol d  M i n e .  P r o d u c t i o n  f r o m  t h e s e  s i x  m i n e s  i s  

projected  to  be  between  11.1  to  12.4  million  ounces  of  pure  silver  or  16.6  to  18.5  million  ounces  of  silver 

equivalents in 2017. 

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call 

our toll free number 1.866.529.2807. 

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigatio n Reform Act of

1995 and applicable Canadian securit ies legislation, concerning the business, operations and financial performance and conditi on of First

Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other

metals, the estimation of mineral reserves and resources, the r ealization of mineral reserve e stimates, the timing and amount of estimated

future production, costs of pr oduction, capital expenditures, c osts and timing of the development of new deposits, success of exploration

activities, permitting time li nes, hedging practices, currency exchange rate fluctuations, requi rements for additional capital , government

regulation of mining operations , environmental risks, unanticip ated reclamation expenses, timing and possible outcome of pendi ng litigation,

title disputes or cl aims and limitations on insurance coverage. Generally, these forward-look ing statements can be identified by the use of

forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", " budget", "scheduled", "estimates" , "forecasts",

"intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certai n actions, events or

results "may", "could", "would", "might" or "will be taken", "o ccur" or "be achieved". Forward- looking statements are subject to known and

unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic

Silver Corp. to be materially di fferent from those expressed or implied by such forward-looking statements, including but not limited to: risks

related to the integration of acquisitions; risks related to in ternational operations; risks related to joint venture operatio ns; actual results of

current exploration activities; actual results of current recla mation activities; conclusions of economic evaluations; changes in project

parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant,

6 

equipment or processes to operate as anticipated; accidents, la bour disputes and other risks of the mining industry; delays in obtaining

governmental approvals or financing or in the completion of dev elopment or construction activiti es, as well as those factors d iscussed in the

section entitled "Description of the Business - Risk Factors" i n First Majestic Silver Corp.'s Annual Information Form for the year ended

December 31, 2016, available on www.sedar.com, and Form 40-F on file with the United States Securities and E xchange Commission in

Washington, D.C. Although First Majestic Silver Corp. has atte mpted to identify important facto rs that could cause actual res ults to differ

materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated

or intended. There can be no assurance that such statements wi ll prove to be accurate, as actual results and future events co uld differ

materially from those anticipated in such statements. Accordin gly, readers should not place undue reliance on forward-looking

statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein,

except in accordance with applicable securities laws.