Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AG.TO ·

FR Frankfurt – FMV First Majestic Produces 7.7M Silver Eqv. Oz in the Second Quarter Consisting of 2.8M Oz Silver and 59,391 Oz Gold; Announces Updated 2022 Guidance and Conference Call Details

Financials

New York – AG                           July 20, 2022 

Toronto – FR 

Frankfurt – FMV  

First Majestic Produces 7.7M Silver Eqv. Oz in the Second Quarter Consisting of 2.8M Oz Silver

and 59,391 Oz Gold; Announces Updated 2022 Guidance and Conference Call Details

Vancouver,  BC,  Canada ‐  First  Majestic  Silver  Corp.  ("First  Majestic"  or  the  "Company")  announces  that  total 

production  in  the  second  quarter  of  2022  from  the  Company’s  four  producing  operations,  the  San  Dimas 

Silver/Gold Mine, the Jerritt Canyon Gold Mine, the Santa Elena Silver/Gold Mine and the La Encantada Silver 

Mine, reached 7.7 million silver equivalent (“AgEq”) ounces consisting of 2.8 million ounces of silver and 59,391 

ounces of gold. The Company’s financial results for the second quarter of 2022 are scheduled to be released on 

Thursday, August 4, 2022. 

SECOND QUARTER HIGHLIGHTS 

 Total Production Increased by 20% Y/Y: The Company produced 7.7 million AgEq ounces representing a 

20% increase when compared to the second quarter of 2021 primarily due to the acquisition of Jerritt 

Canyon and successful ramp up of the Ermitaño mine at Santa Elena.  

 Record Production at Santa Elena: Strong ore production from the Ermitaño mine enabled Santa Elena 

to  set  an  all‐time  new  quarterly  production  record  of  2.2  million  AgEq  ounces.  The  Company  is  now 

planning for higher production rates from Ermitaño in the second half of 2022 which is expected to result 

in a projected 28% increase in FY2022 production  at Santa Elena to between 8.7  to 9.2  million AgEq 

ounces.  

 Restarting West Generator and Saval II mines at Jerritt Canyon:  Underground mining activities began 

at the West Generator mine at the end of the quarter and the Company expects to start mining activities 

at Saval II in October. These two new sources of ore feed, along with operational improvements at the 

SSX mine, are anticipated to increase the average head grade and nearly double the amount of fresh ore 

feed to the plant in the fourth quarter. In addition, these improvements are expected to significantly 

reduce all‐in sustaining costs in the second half of 2022. 

 Liquefied  Natural  Gas  (“LNG”)  Powerplant  Expansion  at  Santa  Elena:  The  Company  continued  the 

construction of the LNG powerplant expansion project and powerline at Santa Elena to provide low‐cost, 

clean energy to the Ermitaño mine and the dual‐circuit project in Santa Elena. The expanded powerplant 

is  expected  to  be  operational  in  the  fourth  quarter  following  the  installation  of  four  additional  LNG 

generators.  In  addition,  the  connection  of  the  Ermitaño  transmission  powerline  to  the  powerplant  is 

expected to be completed in the third quarter of 2022.  

 30 Drill Rigs Active: The Company completed a total of 76,444 metres of drilling across the Company’s 

mines during the quarter. Throughout the quarter a total of 30 drill rigs were active consisting of 11 rigs 

at San Dimas, 11 rigs at Jerritt Canyon, six rigs at Santa Elena and two rigs at La Encantada.  

“In the second quarter we saw strong production of 7.7 million silver equivalent ounces, a 20% increase year‐

over‐year,” said Keith Neumeyer, President and CEO.  “In the second half of 2022, we anticipate a further 25% 

production  increase  in  our  total  silver  equivalent  ounces.   This  increase  in  production  is  being  propelled  by 

significant  growth  at  both  the  Santa  Elena  and  Jerritt  Canyon  operations.  At  Jerritt  Canyon,  we  successfully 

restarted the West Generator mine and expect to bring Saval II into production by October. These two mines, in 

addition to operational improvements at SSX, are expected to nearly double the amount of fresh ore feed to the 

plant in addition to increasing the average head grades. As a result of these production improvements, costs at 

Jerritt Canyon are projected to drop significantly over the next two quarters.” 

PRODUCTION TABLE

Q2  Q2  Y/Y  Q1  Q/Q 

2022  2021  Change  2022  Change 

Ore processed/tonnes milled  903,791  826,213  9%  877,118  3% 

Silver ounces produced  2,775,928  3,274,026  ‐15%  2,613,328  6% 

Gold ounces produced  59,391  46,545  28%  58,891  1% 

Silver equivalent ounces produced  7,705,935  6,435,023  20%  7,222,002  7% 

QUARTERLY REVIEW 

Total ore processed during the quarter at the Company's mines amounted to 903,791 tonnes, representing a 3% 

increase  compared  to  the  previous  quarter.  The  increase  in  tonnes  processed  was  primarily  due  to  higher 

throughput rates achieved at Santa Elena and La Encantada and slightly offset by  lower  processed tonnes at 

Jerritt Canyon.  

Consolidated silver and gold grades in the quarter averaged 114 g/t and 2.29 g/t, respectively, compared to 109 

g/t and 2.31 g/t, respectively, in the previous quarter. The 4% increase in consolidated silver grades was primarily 

due to a 30% increase in silver grades at La Encantada partially offset by a 9% decrease in silver grades at San 

Dimas. Head grades at Santa Elena and Jerritt Canyon were relatively unchanged compared to the prior quarter.      

Consolidated silver and gold recoveries averaged 84% and 89%, respectively, during the quarter. The Company 

continued to advance the Santa Elena dual‐circuit project in order to increase the leaching performance and 

metallurgical recoveries of the Santa Elena and Ermitaño ores at the processing plant. A new tailings filter‐press, 

an additional leaching tank and a fourth CCD thickener are expected to be commissioned at Santa Elena in the 

fourth quarter. During the quarter, metals recoveries from Ermitaño averaged 49% for silver and 92% for gold. 

However, once the dual‐circuit is fully operational the Company expects to achieve significantly higher silver and 

gold recoveries from Ermitaño.  

Quarterly Mine by Mine Production Table:  

Mine 

 Ore 

Processed  

 Tonnes 

per Day  

 Ag 

Grade 

(g/t)  

 Au 

Grade 

(g/t)  

 Ag 

Recovery  

 Au    

Recovery  

 Ag Oz 

Produced  

 Au Oz 

Produced  

 AgEq Oz 

Produced  

San Dimas       197,102   

2,166           257          3.01     94%  96%      1,527,465          18,354          3,046,665   

Jerritt Canyon       213,647   

2,348    ‐         3.40     ‐  80%   ‐        18,632          1,546,142   

Santa Elena       228,487   

2,511             67           3.26     78%  93%         384,953          22,309          2,241,763   

La Encantada       264,555   

2,907           141          0.01     72%  90%         863,510                 96             871,365   

Total       903,791   

9,932           114          2.29     84%  89%      2,775,928          59,391          7,705,935   

Certain amounts shown may not add exactly to the total amount due to rounding differences. 

*The following prices were used in the calculation of silver equivalent ounces: Silver: $22.60 per ounce; Gold: $1,871 per ounce. 

At the San Dimas Silver/Gold Mine: 

 San Dimas produced 3,046,665 AgEq ounces during the quarter consisting of 1,527,465 ounces of silver 

and 18,354 ounces of gold, representing decreases of 6% and 1%, respectively, when compared to the 

prior quarter.  

 The mill processed a total of 197,102 tonnes of ore with average silver and gold grades of 257 g/t and 

3.01 g/t, respectively. Silver and gold grades were lower in the second quarter compared to the prior 

quarter due to higher dilution from the long hole stopes in the Jessica and Regina veins. The Company is 

implementing a recovery plan for the second half of 2022 to reduce dilution and prioritizing the long hole 

stoping of the Jessica and Regina veins to improve ore grade and overall production.  

 Silver and gold recoveries during the quarter averaged 94% and 96%, respectively.  

 The Central Block and Sinaloa Graben areas contributed approximately 76% and 24%, respectively, of 

the total production during the quarter. The Company continued advancing underground development 

for stope preparation and ventilation within the Perez vein to be ready for initial production in August.   

 A  total  of  11  drill  rigs,  consisting  of  one  surface  rig  and  10  underground  rigs,  were  active  during  the 

quarter.  

At the Jerritt Canyon Gold Mine: 

 During  the  quarter,  Jerritt  Canyon  produced  18,632  ounces  of  gold,  representing  a  10%  decrease 

compared to the prior quarter. The decrease was primarily due to a major failure in the oxygen plant to 

produce liquid oxygen which significantly reduced roasting capacity over a two‐week period in May.   

 The mill processed a total of 213,647 tonnes of ore with an average gold grade and recovery of 3.40 g/t 

and 80%, respectively. The SSX and Smith mines contributed approximately 58% and 42%, respectively, 

of the total production in the quarter. The processing of lower ore grade from SSX continued during the 

quarter which resulted in lower than budgeted ore grades processed in the plant. The Company expects 

gold grades from the SSX mine will improve in the second half of 2022 as higher‐grade ore pods are 

developed into and extracted following recent successful exploration activities.   

 The  Company  completed  rehabilitation  efforts  in  the  West  Generator  underground  mine  and 

successfully began initial mine production at the end of the second quarter. This new ore feed, along 

with the restart of the Saval II underground mine in October and operational improvements at the SSX 

mine, are anticipated to increase the average head grade and nearly double the amount of fresh ore 

feed to the plant. In addition, these improvements are expected to significantly reduce all‐in sustaining 

costs in the third and fourth quarter of 2022. 

 A  total  of  11  drill  rigs,  consisting  of  one  surface  rig  and  10  underground  rigs,  were  active  during  the 

quarter.  

At the Santa Elena Silver/Gold Mine: 

 Santa Elena produced a new quarterly record of 2,241,763 AgEq consisting of 384,953 ounces of silver 

and  22,309  ounces  of  gold  during  the  quarter,  representing  a  14%  increase  in  both  silver  and  gold 

production  when  compared  to  the  prior  quarter.  The  increase  in  production  was  primarily  due  to 

processing higher volumes of Ermitaño’s ore which contains higher gold grades than Santa Elena’s ore. 

 Santa  Elena  and  Ermitaño  contributed  approximately  44%  and  56%,  respectively,  of  the  ore  tonnes 

processed during the quarter. The mill processed a total of 228,487 tonnes of ore consisting of 100,346 

tonnes from Santa Elena and 128,141 tonnes from Ermitaño. 

 Silver and gold grades from Santa Elena averaged 95 g/t and 1.20 g/t, respectively, while silver and gold 

grades from Ermitaño averaged 45 g/t and 4.86 g/t, respectively. 

 Consolidated silver and gold recoveries averaged 78% and 93%, respectively, during the quarter. The 

Company continues to advance the dual‐circuit project at the Santa Elena processing plant which was 

approximately 82% complete at quarter end. An additional leaching tank and a fourth CCD thickener 

were installed in the quarter and are anticipated to be commissioned in the third quarter followed by 

the commissioning of the new tailings filter‐press in September. The new dual‐circuit is expected to be 

fully operational by the end of the fourth quarter allowing for improved recoveries and increased plant 

capacity.    

 During  the  quarter,  the  Company  advanced  the  construction  of  the  LNG  powerplant  expansion  and 

powerline  to  provide  low‐cost,  clean  power  to  the  Ermitaño  mine  and  to  support  the  power 

requirements for the dual‐circuit installations. At the powerplant, the structural steel erection inside the 

powerhouse  was  completed  and  the  installation  of  the  ventilation  fans  and  overhead  crane  will  be 

completed  in  July.  The  construction  of  the  transmission  line  to  join  Ermitaño  to  Santa  Elena  also 

advanced  with  the  installation  of  the  electrical  poles  and  approximately  70%  of  the  cable  lines.  The 

powerline is on track for completion in late July and remains on schedule to be connected to the Santa 

Elena powerplant in the third quarter. The Company plans to install and commission four additional LNG 

generators (for a total of 11 LNG generators) by the end of the third quarter and to be fully operational 

by the end of the fourth quarter.   

 A total of six drill rigs, consisting of four surface rigs and two underground rigs, were active during the 

quarter.  

At the La Encantada Silver Mine: 

 During  the  quarter,  La  Encantada  produced  863,510  ounces  of  silver,  representing  a  34%  increase 

compared to the prior quarter. The increase was primarily due to a 30% increase in silver grades. 

 The mill processed a total of 264,555 tonnes of ore with an average silver grade and recovery of 141 g/t 

and 72%, respectively. The increase in grades were the result of additional ore feed being sourced from 

the  new  draw  points  in  the  Cuerpo  660  and  La  Prieta  areas.  The  Company  continued  development 

activities  in  the  Ojuelas  and  Beca‐Zone  orebodies  in  an  effort  to  further  increase  silver  grades  in  the 

second half of 2022. 

 Two drill rigs, consisting of one surface rig and one underground rig, were active on the property during 

the quarter. 

OUTLOOK 

The  Company  is  revising  its  second  half  and  full  year  2022  guidance  to  reflect  changes  due  to  increased 

production  from  the  Ermitaño  mine  and  improved  milling  efficiencies  at  Santa  Elena,  improved  production 

tonnages  and  grades  at  Jerritt  Canyon  as  well  as  incorporating  changes  to  metal  price  assumptions  and 

production impacts from the first half of 2022. Details of the changes and their expected impacts are presented 

below:   

1. Increased production at Santa Elena to between 8.7 to 9.2 million AgEq ounces in 2022 following higher 

mine production from the Ermitaño mine along with expected higher‐grade ore from the Alejandra de 

Bajo and America veins at the Santa Elena mine.   

2. Completion of Santa Elena’s dual‐circuit project which is expected to improve metallurgical recoveries 

of Ermitaño ores and to allow higher plant throughput capacity. 

3. Improving dilution controls at San Dimas and prioritizing long‐hole stoping of the Jessica and Regina veins 

which is anticipated to improve ore grade and overall production. 

4. At Jerritt Canyon, the Company has accelerated the restart of the West Generator and Saval II mines 

which are expected to contribute higher tonnages, improved grades and reduced AISC in the second half 

of 2022. AISC in the second half of 2022 is now projected to be within a range of $1,739 to $1,861 per 

ounce and improving further into 2023 due to anticipated increased throughputs. 

5. At La Encantada, mining is expected to begin at the Ojeulas and Beca‐Zone orebodies in the second half 

of 2022 aimed at increasing ore tonnage and silver grades.   

6. Reduced  silver  price  assumptions  in  the  second  half  of  2022  to  $20.50/oz  (previously  $22.50/oz)  but 

maintained gold price assumptions at $1,750/oz, resulting in a 85:1 silver to gold ratio.  

As a result of these adjustments, our 2022 total production remains relatively unchanged at 32.5 to 34.6 million 

AgEq ounces compared to the prior guidance of 32.2 to 35.8 million AgEq ounces.  

The Company is also providing guidance below on a mine‐by‐mine basis for the second half of 2022.  

GUIDANCE FOR SECOND HALF 2022 

Silver Oz (M)    Gold Oz (K)  Silver Eqv Oz (M)  Cash Cost  AISC   

Silver:           ($ per AgEq oz)  ($ per AgEq oz) 

San Dimas, Mexico  3.5 – 3.9  37 – 42  6.6 – 7.4  8.58 – 9.11  12.11 – 13.05 

Santa Elena, Mexico  0.9 – 1.0  44 – 49  4.6 – 5.1  10.37 – 11.03  12.00 – 12.86 

La Encantada, Mexico  1.5 – 1.6  –  1.5 – 1.6  15.21 – 16.15  19.35 – 20.76 

Mexico Consolidated:  5.8 – 6.5  81 – 90  12.7 – 14.2  9.99 – 10.62  12.91 – 13.87 

Gold:           ($ per AuEq oz)  ($ per AuEq oz) 

Jerritt Canyon, USA  –  57 – 64  4.9 – 5.4  1,498 – 1,592  1,739 – 1,861 

Total Production             ($ per AgEq oz)  ($ per AgEq oz) 

Consolidated  5.8 – 6.5  138 ‐ 154  17.6 – 19.6  12.09 – 12.85  16.09 – 17.27 

* Certain amounts shown may not add exactly to the total amount due to rounding differences. 

* Consolidated AISC includes general and administrative cost estimates and non‐cash costs of $1.30 to $1.41 per AgEq ounce. 

* Cash Costs and AISC are non‐GAAP measures and are not standardized financial measures under the Company's financial reporting 

framework.  These  measures  have  been  calculated  on  a  basis  consistent  with  historical  periods.  See  "Non‐GAAP  Financial  Measures" 

below.  

In the first half of 2022, the Company  produced a total of 14.9  million AgEq  ounces  consisting of 5.4  million 

ounces of silver and 118,283 ounces of gold. In the second half of 2022, the Company expects to produce 17.6 

to 19.6 million AgEq ounces, or a 25% increase compared the first half of 2022. Silver production is expected to 

range between 5.8 to 6.5 million ounces, or a 14% increase compared the first half of the year. Additionally, gold 

production is now expected to range between 138,000 to 154,000 ounces, or a 23% increase compared to the 

first  half  of  2022.  The  increases  in  production  are  primarily  due  to  expected  higher  ore  production  from  the 

Ermitaño mine at Santa Elena and improved mine production and gold grades at Jerritt Canyon in the second 

half of 2022, as well as a higher contribution of AgEq credits due to an increase in the gold to silver ratio. 

Cash costs in the second half of 2022 are expected to trend lower to within the range of $12.09 to $12.85 per 

AgEq ounce, primarily due to higher gold production at both Santa Elena and Jerritt Canyon. In addition, AISC are 

expected to be within a range of $16.09 to $17.27 per AgEq ounce in the second half of 2022. 

A mine‐by‐mine breakdown of the revised full year 2022 production guidance is included in the table below and 

assumes the prices for calculating AgEq ounces are the same as previously stated above. 

GUIDANCE FOR FULL YEAR 2022  

Silver Oz (M)    Gold Oz (k)  Silver Eqv Oz (M)  Cash Cost  AISC   

Silver:           ($ per AgEq oz)  ($ per AgEq oz) 

San Dimas, Mexico  6.6 – 7.0  74 – 79  12.8 – 13.6  9.16 – 9.47  12.46 – 12.98 

Santa Elena, Mexico  1.6 – 1.7  85 – 90  8.7 – 9.2  11.33 – 11.74  13.50 – 14.05 

La Encantada, Mexico  3.0 – 3.2  –  3.0 – 3.2  15.10 – 15.56  18.51 – 19.16 

Mexico Consolidated:  11.2 – 11.9  160 – 169  24.5 – 26.0  10.66 – 11.02  15.17 – 15.79 

Gold:           ($ per AuEq oz)  ($ per AuEq oz) 

Jerritt Canyon, USA  –  96 – 103  8.0 – 8.6  1,744 – 1,817  2,012 – 2,103 

Total Production          

($ per AgEq oz)  ($ per AgEq oz) 

Consolidated  11.2 – 11.9  256 – 273  32.5 – 34.6  13.21 – 13.69  17.68 – 18.42 

* Certain amounts shown may not add exactly to the total amount due to rounding differences. 

* Consolidated AISC includes general and administrative cost estimates and non‐cash costs of $1.44 to $1.52 per AgEq ounce. 

* Cash Costs and AISC are non‐GAAP measures and are not standardized financial measures under the Company's financial reporting 

framework.  These  measures  have  been  calculated  on  a  basis  consistent  with  historical  periods.  See  "Non‐GAAP  Financial  Measures" 

below.   

For the full year of 2022, the Company now estimates silver production will range between 11.2 to 11.9 million 

ounces compared to the prior guidance of 12.2 to 13.5 million ounces. Additionally, gold production is estimated 

to range between 256,000 to 273,000 ounces compared to the prior guidance of 258,000 to 288,000 ounces.  

Annual cash costs are now expected to be within the range of $13.21 to $13.69 per ounce or slightly higher than 

the previous guidance of $12.20 to $12.94 per ounce, primarily due to inflationary pressures and higher costs at 

Jerritt Canyon in the first half of 2022. In addition, annual AISC are expected to be within a range of $17.68 to 

$18.42 per AgEq ounce compared to the previous guidance of $16.79 to $18.06 per AgEq ounce. 

REVISED CAPITAL BUDGET 

In an effort to maintain its strong balance sheet and manage inflationary pressures, the Company has updated 

its annual 2022 capital budget to include the reallocation of development and exploration expenditures across 

its operations and investments in innovative projects. As a result, the Company has reduced its planned 2022 

capital investments  by 4% to $199.5 million consisting of $83.9 million of sustaining investments and $115.6 

million of expansionary investments.  

The  revised  2022  annual  budget  includes  total  capital  investments  of  $90.0  million  on  underground 

development,  $44.5  million  towards  property,  plant  and  equipment,  $36.5  million  on  exploration  and  $28.5 

million towards efficiency and corporate projects. 

Revised 2022 Capital Budget ($millions)  Sustaining  Expansionary  Total 

Underground Development  55.1  34.9  90.0 

Exploration  3.0  33.5  36.5 

Property, Plant and Equipment  23.2  21.3  44.5 

Corporate Projects  2.6  25.9  28.5 

Total  $83.9  $115.6  $199.5 

*Certain amounts shown may not add exactly to the total amount due to rounding differences. 

Under the revised 2022 budget, the Company is planning to complete a total of approximately 45,900 metres of 

underground development, representing a 15% decrease compared to the original guidance. In addition, the 

Company is now planning to complete a total of approximately 240,450 metres of exploration drilling in 2022, 

representing a 25% decrease compared to the original guidance. In the first half of 2022, the Company completed 

23,553 metres of underground development and 151,668 metres of exploration drilling. 

CONFERENCE CALL 

The Company will be holding a conference call and webcast tomorrow, July 21, 2022 at 8 am PDT (11 am EDT) to 

discuss the quarterly results.   

To participate in the conference call, please dial the following: 

Toll Free Canada & USA:   1‐800‐319‐4610 

Outside of Canada & USA:  1‐604‐638‐5340 

Toll Free Germany:   0800 180 1954 

Toll Free UK:   0808 101 2791 

Participants should dial in 10 minutes prior to the conference.  

Click on WEBCAST on the First Majestic homepage as a simultaneous audio webcast of the conference call will 

be posted at www.firstmajestic.com. 

The conference call will be recorded, and you can listen to an archive of the conference by calling:  

  Canada & USA Toll Free:   1‐800‐319‐6413 

  Outside Canada & USA:     1‐604‐638‐9010 

  Access Code:        9180 followed by the # sign 

The replay will be available approximately one hour after the conference and will be available for seven days 

following the conference. The replay will also be available on the Company’s website for one month. 

Q2 EARNINGS AND DIVIDEND ANNOUNCEMENT 

The Company is planning to release its second quarter 2022 unaudited financial results, and to announce the 

second quarter dividend payment, along with the shareholder record and payable dates on Thursday, August 4, 

2022.