Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AG.TO ·

FR Frankfurt – FMV First Majestic Intersects 19.35 g/t Au over 23.2m in Potential New High-Grade Gold Zone at Jerritt Canyon; Follow-up Drilling Confirms Presence of High-Grade Gold Pod Near Active Underground Mining in Smith Mine

Drill Results

New York – AG                      August 23, 2022 

Toronto – FR 

Frankfurt – FMV  

First Majestic Intersects 19.35 g/t Au over 23.2m in Potential New High-Grade Gold

Zone at Jerritt Canyon; Follow-up Drilling Confirms Presence of High-Grade Gold Pod

Near Active Underground Mining in Smith Mine

Vancouver, BC, Canada – First Majestic Silver Corp. (AG: NYSE; FR: TSX) (the "Company" or “First Majestic”) is 

pleased to announce additional positive drill results from its ongoing exploration program at the Jerritt Canyon 

Gold Mine (“Jerritt Canyon”) located in Elko County, Nevada.  

“Today’s exploration results continue to validate our thesis that the area between the operating SSX and Smith 

mines is favourable for new, near‐mine gold discoveries,” stated Keith Neumeyer, President and CEO of First 

Majestic.  “Hole‐1102  intersected  what  looks  like  a  new  high‐grade  area  on  the  north  side  of  the  SSX/Smith 

connection drift. Nine follow up drill holes are being planned to further define this potential new zone. In addition, 

follow  up  drilling  at  Zone  10  in  the  Smith  mine  has  confirmed  the  presence  of  a  high‐grade  pod  of  gold 

mineralization  approximately  90  metres  southeast  from  the  connection  drift.  Over  the  past  few  months,  we 

advanced the mine  development  towards  this  high‐grade pod in anticipation  of initial ore  extraction in  early 

October. Furthermore, ore production from the West Gen mine is also planned to begin in October and expected 

to increase the amount of fresh ore production at Jerritt to over 3,000 tonnes per day by the end of 2022.” 

Highlights from the Company’s ongoing exploration program include the following summary of gold intercepts: 

Drilling at Smith Zone 10 (Figure 2): 

● Follow up drilling to hole SMI‐LX‐1112 (8.39 grams of gold per tonne (g/t Au) over 29.7m, reported 

May 2022) delineated a new gold mineral zone located above the water table, approximately 90m southeast of 

the new connection drift between the SSX and Smith mines. Geologic interpretation and modeling of the drilling 

results  determined  that  the  gold  zone  is  flat‐lying,  similar  to  nearby  deposits.   Results  from  Smith  Zone  10 

include: 

 SMI‐LX‐1067: 6.98 g/t Au over 17.6m 

 SMI‐LX‐1068: 8.61 g/t Au over 12.8m 

 SMI‐LX‐1069: 8.61 g/t Au over 24.4m 

 SMI‐LX‐1071: 14.60 g/t Au over 13.2m  

Drilling from the SSX/Smith Mine connection drift (Figure 3): 

●SMI‐LX‐1102: 19.35 g/t Au over 23.2m: the intercept is approximately 75m north and 40m above the 

connection  drift  (above  the  current  water  table).  The  geometry  of  the  mineralization  appears  to  be  sub‐

horizontal with the drilling intersecting at a low angle. 

●SSX‐SR‐612: 10.27 g/t Au over 14.7m and 9.53 g/t Au over 13.7m: the intercepts are approximately 

300m SE and 75m below the connection drift. The drill hole likely intercepted the mineralization at a low angle 

and may be correlated to results from hole SSX‐SR‐608 reported in May 2022. 

Drilling at Smith (Figure 4): 

●SMI‐LX‐799: 32 g/t Au over 13.7m: identified gold mineralization approximately 150m north and 15m 

below active mine workings. Geologic interpretation suggests that this intercept is stratigraphically controlled 

(sub‐horizontal) and drilling has intersected it at a low angle.  

Drilling at SSX Zone 5 (Figure 5):  

 Intersected  mineralization  approximately  100m  from  active  mining  and  above  the  water  table.  The 

geometry  of  the  mineralization  is  not  yet  known,  a  combination  of  sub  horizontal  controls  along 

stratigraphy (for low angle intersects) and vertical controls are under investigation.  

 SSX‐SR‐486: 6.53 g/t Au over 11.3m 

 SSX‐SR‐490: 11.22 g/t over 35.3m 

In 2022, the  Company plans to drill approximately  120,000m at  Jerritt Canyon with a focus primarily on  the 

Smith/SSX mines, Winters Creek, Waterpipe, Wheeler, and Murray areas. The 2022 drilling campaign consists of 

short‐term  focused  underground  core  drilling  testing  extensions  of  known  ore  controls  in  close  proximity  to 

active  mining;  mid‐term  focused  drilling  planned  to  validate/test  the  presence  of  mineralized  volumes  near 

historic workings; and long‐term focused drilling aiming to make new gold discoveries in the district (Figure 1). 

Figure 1: Location Map Jerritt Canyon  

Figure 2: Plan View and Vertical‐Section of Gold Drillhole Intercepts, Smith Mine Zone 10 

Figure 3: Plan view of Gold Intercepts connection drift 

Figure 4: Plan View and Vertical‐Section of Gold Intercepts Smith (SMI‐LX‐799) 

Figure 5: Plan View and Vertical‐Section of Gold Intercepts, SSX Zone 5  

Table 1: Summary of Significant Gold Intercepts: 

Drillhole  Target  Drill type  Intercept 

From (m)  To (m)  Length (m)  Au (g/t) 

SMI‐LX‐1067  Smith  DDH  126.6  138.0  11.4  5.30 

SMI‐LX‐1067 (2)  Smith  DDH  149.4  167.0  17.6  6.98 

SMI‐LX‐1068  Smith  DDH  127.1  134.7  7.6  9.13 

SMI‐LX‐1068 (2)  Smith  DDH  151.5  164.3  12.8  8.61 

SMI‐LX‐1069  Smith  DDH  120.7  145.1  24.4  8.61 

SMI‐LX‐1071  Smith  DDH  93.3  106.5  13.2  13.76 

SMI‐LX‐1071 (2)  Smith  DDH  110.0  116.1  6.1  3.60 

SMI‐LX‐1071 (3)  Smith  DDH  119.2  132.9  13.7  14.60 

SMI‐LX‐1071 (4)  Smith  DDH  137.5  143.7  6.2  8.88 

SMI‐LX‐1102  Smith  DDH  91.7  114.9  23.2  19.35 

SMI‐LX‐799   Smith  DDH  171.3  185.0  13.7  32.00 

SSX‐SR‐486  SSX  DDH  116.7  128.0  11.3  6.53 

SSX‐SR‐490   SSX  DDH  81.7  90.8  9.1  13.03 

SSX‐SR‐490 (2)  SSX  DDH  98.5  133.8  35.3  11.22 

SSX‐SR‐612  SSX  DDH  266.6  281.3  14.7  10.27 

SSX‐SR‐612 (2)  SSX  DDH  284.5  298.2  13.7  9.53 

DDH is abbreviation for Diamond Drill Hole; 

From, To and Length indicated in metres, true width of the mineralized intercepts is unknown at this time. 

Gold intercepts are calculated using weighted averages, uncapped sample assays, a 3.0 g/t Au cut‐off grade and 

a minimum length of five metres. True width of incepts is unknown at this time. A maximum three metres below 

the cut‐off grade is allowed as dilution.  

First Majestic’s drill programs follow established QA/QC insertion protocols with standards, blanks and duplicates 

introduced in the sample stream. After detailed geological logging, all drill core samples were cut in half. One 

half of the core is submitted to Paragon Geochemical in Reno, Nevada (Au‐AA30, Au‐GR30 ‐ ISO/IEC 17025:2017). 

The remaining half core is retained on‐site for verification and reference purposes.  

Samples submitted to Paragon Geochemical are dried, crushed and pulverized to 85% passing 75 microns. At 

Paragon Geochemical, Au is analyzed by Au by Fire Assay‐Aqua Regia Digest AAS finish. Samples returning Au 

greater than 8 ppm are analyzed by 30 g Fire Assay gravimetric finish.  

See the Company's Annual Information Form, available at www.sedar.com for further information concerning 

QAQC and data verification matters, the key assumptions, parameters and methods used by the Company to 

estimate  Mineral  Reserves  and  Mineral  Resources,  and  for  a  detailed  description  of  known  legal,  political, 

environmental,  and  other  risks  that  could  materially  affect  the  Company's  business  and  the  potential 

development of the Company's Mineral Reserves and Mineral Resources. 

The information provided in this report/statement/release constitutes exploration results. It is inappropriate for 

the reader to use the information presented for deriving estimates of tonnage and grade or quality.  

Gonzalo  Mercado,  Vice  President  Exploration  for  First  Majestic,  has  reviewed  and  approved  the  technical 

information disclosed in this news release and is a "Qualified Person" as defined under NI 43‐101. 

ABOUT THE COMPANY 

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United 

States. The Company presently owns and operates the San Dimas Silver/Gold Mine, the Jerritt Canyon Gold Mine, 

the Santa Elena Silver/Gold Mine and the La Encantada Silver Mine. 

First Majestic is proud to offer a portion of its silver production for sale to the public.   Bars, ingots, coins and 

medallions are available for purchase online at its Bullion Store at some of the lowest possible premiums. 

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call 

our toll‐free number 1.866.529.2807. 

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This  press  release  contains  “forward‐looking  information”  and  "forward‐looking  statements”  under  applicable  Canadian  and  U.S.  securities  laws 

(collectively,  “forward‐looking  statements”).  These  statements  relate  to  future  events  or  the  Company's  future  performance,  business  prospects  or 

opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of 

management's experience and perception of historical trends. Assumptions may prove to be incorrect and actual results may differ materially from those 

anticipated. Statements concerning proven and probable mineral reserves and mineral resource estimates may also be deemed to constitute forward‐

looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the 

case of  measured  and indicated mineral resources  or  proven and probable mineral reserves, such statements reflect the conclusion based on  certain 

assumptions  that  the  mineral  deposit  can  be  economically  exploited.  Any  statements  that  express  or  involve  discussions  with  respect  to  predictions, 

expectations,  beliefs,  plans,  projections,  objectives  or  future  events  or  performance  (often,  but  not  always,  using  words  or  phrases  such  as  “seek”, 

“anticipate”,  “plan”,  “continue”,  “estimate”,  “expect”,  “may”,  “will”,  “project”,  “predict”,  “forecast”,  “potential”,  “target”,  “intend”,  “could”,  “might”, 

“should”, “believe” and similar expressions) are not statements of historical fact and may be “forward‐looking statements”. 

Actual results may vary from forward‐looking statements. Forward‐looking statements are subject to known and unknown risks, uncertainties and other 

factors that may cause actual results to materially differ from those expressed or implied by such forward‐looking statements, including but not limited to: 

material  adverse  changes,  unexpected  changes  in  laws,  rules  or  regulations,  or  their  enforcement  by  applicable  authorities;  the  failure  of  parties  to 

contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies 

to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations. Although First Majestic 

has attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐looking statements, there 

may be other factors that cause results not to be as anticipated, estimated or intended. 

The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance  can be given that these 

expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only 

as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward‐looking statements, except as required 

by applicable laws.