Production Results

FIRST MAJESTIC SILVER CORP.

Suite 1805 – 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail: [email protected]

NEWS RELEASE

TSX – FR October 14, 2014 NYSE - AG Frankfurt – FMV (WKN: A0LHKJ)

Mexico - AG

Produces 3.5 Million Silver Eqv. Ounces in Q3; Postpones the Sale of 934K Silver Ounces of Inventory

First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that total production at its five operating silver mines in Mexico for the third quarter ending September 30, 2014 reached 3,523,536 equivalent ounces of silver, representing a 5% increase compared to the same quarter in 2013.

Total silver production for the quarter consisted of 2,680,439 ounces of silver, relatively unchanged compared to  the  same  quarter  in  2013.  In  addition,  9,703,792  pounds  of  lead  and  3,222,877  pounds  of  zinc  were produced,  representing  an  increase  of  14%  and  44%,  respectively,  compared  to  the  same  quarter  of  the previous year. Also produced were 2,781 ounces of gold, representing a 5% decrease compared to the third quarter of 2013.

Keith Neumeyer, President & CEO of First Majestic, states, “the Company’s primary focus remains to be cost cutting.  Several  successes  have  been  achieved  while  many  challenges  still  remain.  As  management  gets accustomed to operating in a much lower silver price environment many efficiencies are slowly showing up in the business, however, often change comes slower than we wish. I would like to compliment management for their  efforts,  yet  persistence  is  required  in  this  daily  challenge  to  achieve  the  highest  levels  of  efficiencies possible”.

Consolidated Production Results: 

Q3Q3Y/YQ2Q/Q
20142013Change2014Change
Ore processed/tonnes milled621,196641,345‐3%671,024‐7%
Total production ‐ ounces of silver equivalent3,523,5363,370,4575%3,855,224‐9%
Total silver ounces produced2,680,4392,689,2370%3,098,218‐13%
Silver grade (g/t)196202‐3%212‐7%
Silver recovery (%)68655%680%
Pounds of lead produced9,703,7928,543,55114%9,131,1496%
Pounds of zinc produced3,222,8772,232,88144%2,637,96722%
Gold ounces produced2,7812,942‐5%2,801‐1%
Tonnes of Iron ore produced6295,203‐88%51522%

Silver  prices  declined  19%  in  the  third  quarter  representing  the  second  largest  quarterly  decline  since  the financial crisis in 2008. As a result of this weakness, the Company decided to temporarily suspend silver sales in an attempt to maximize future profits. This suspension of sales will result in lower revenues and earnings for the third quarter, however, it is likely that these inventories of unsold ounces will instead be sold in the fourth quarter. As of September 30, 2014, approximately 934,000 ounces of silver were held in inventory.

In  an  effort  to  further  cut  costs  in  the  low  metal  price  environment,  the  Company  has  eliminated  certain management and operational positions in order to reduce its workforce without affecting future growth plans. As a result, the total number of personnel in the workforce, including contractors, now stands at approximately 3,800 representing a reduction of 4% compared to the prior quarter and 11% compared to the same period in 2013. The total workforce peaked at approximately 4,900 in January 2013. Due to severance payouts, the cost savings  of  these  recent  layoffs  will  not  be  seen  until  the  fourth  quarter.  Also,  additional  cost  savings  are anticipated as the Company has recently informed all of its suppliers and contractors to further reduce their costs from reductions made previously.

Further to the Company’s previous announcements regarding the construction of the power line at Del Toro, the  Company  is  pleased  to  announce  that  the  new  high  capacity  power  line  began  supplying  the  Del  Toro operation with power on September 29, 2014.

Operational Review: 

The  total  ore  processed  during  the  quarter  at  the  Company's  five  operating  silver  mines:  La  Encantada,  La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 621,196 tonnes, reflecting a 3% decrease compared to the prior year and a 7% decrease from the previous quarter. The decrease in tonnes compared to the prior quarter  was  primarily  due  to  lower  throughput  rates  at  Del  Toro  as  mill  availability  decreased  due  to  the reconfiguration of the plant in order to expand the flotation area due to the decision to process all ore through flotation,  as  well  as  seasonal  disruptions  due  to  severe  weather  during  the  Mexican  rainy  season  which affected the La Parrilla, San Martin and Del Toro mines.

Average silver grades in the quarter for the five mines decreased by 3% to 196 g/t compared to 202 g/t in the third  quarter  of  2013  and  decreased  7%  compared  with  the  previous  quarter.  Combined  silver  recoveries averaged 68% during the quarter, up from 65% compared to the same quarter in the prior year and consistent with the second quarter average of 68%.

The  Company's  underground  development  in  the  third  quarter  consisted  of  12,546  metres,  relatively unchanged compared to 12,497 metres completed in the previous quarter.

During  the  quarter,  15  diamond  drill  rigs  were  operating  at  the  Company’s  five  operations.  The  Company completed 18,335 metres of diamond drilling in the quarter compared to 12,508 metres in the prior quarter, representing  a  47%  increase.  A  substantial  portion  of  the  quarterly  drilling  occurred  at  Del  Toro  as  the Company focused on delineation and infill drilling to explore extensions of known underground structures.

The table below represents the operating parameters at each of the Company’s five producing silver mines.

Mine by Mine Quarterly Production Table: 

OreTonnes Silver GradeSilverSilver OzGold Oz Pounds of Pounds of Tonnes of Equivalent
MineProcessedper Day(g/t)Recovery % Produced ProducedLeadZincIronSilver Ounces
La Encantada169,6591,84426057%806,05543‐‐629813,701
La Parrilla178,2521,93815281%705,9282355,526,5463,222,877‐1,168,240
Del Toro134,4741,46217068%495,7141014,177,246‐‐712,860
San Martin92,4981,00523772%509,0461,166‐‐‐584,822
La Guitarra46,31350313283%163,6961,236‐‐‐243,913
Total621,1966,75219668%2,680,4392,7819,703,7923,222,8776293,523,536

The following prices were used in the calculation of silver equivalent ounces: Silver: $19.76 per ounce; Gold: $1,283 per ounce; Lead: $0.99 per pound; Zinc $1.05 per pound and Iron $152 per tonne.

At the La Encantada Silver Mine: 

  • During the quarter, total production consisted of 806,055 silver ounces representing a 25% decrease in silver production over the previous quarter primarily due to a 15% decrease in the silver grade and a 7% decrease in processed ore. The reduction in processed ore and grades were a direct result of a change  in  the  production  sequence  in  order  to  have  consistent  grades  and  tonnage  in  the  coming quarters as well as a shaft rehabilitation project that occurred during the months of July and August.
  • A total of 3,537 metres of underground development were completed in the third quarter compared to 3,095 metres of development in the previous quarter.
  • Four drill rigs were active underground at La Encantada during the quarter.  A total of 4,496 metres of exploration and definition drilling was completed in the third quarter compared to 5,551 metres of drilling in the previous quarter.

At the La Parrilla Silver Mine: 

  • During the quarter, the flotation circuit processed 93,782 tonnes having an average silver grade of 182 g/t and a 90% recovery while the cyanidation circuit processed 84,471 tonnes with an average silver grade of 117 g/t and a 67% recovery.
  • In September, the Company increased the extraction of underground oxide ore within the San Marcos mine. A total of 5,300 tonnes of ore were extracted in September and the Company expects to reach full production rates of 1,000 tpd from San Marcos by year end. As a result of the transition from the lower grade Quebradillas open pit to underground mining from San Marcos, the Company is projecting an increase in oxide silver grades along with higher expected recoveries in the cyanidation circuit.
  • During the quarter, an additional 303 metres were completed at the underground ore haulage level 11. To date, a total of 1.7 kilometres have been completed on the 5.0 kilometre project.
  • Underground  development  completed  in  the  quarter  totaled  2,315  metres  compared  with  2,033 metres developed in the previous quarter.
  • Two underground drill rigs were active within the La Parrilla property during the quarter. A total of 2,409 metres were drilled in the third quarter compared to 2,247 metres in the previous quarter.

At the Del Toro Silver Mine: 

  • On  September  29th,  the  Company  successfully  connected  the  Del  Toro  operation  to  the  Mexican National power grid and the new 115kV power line is supplying 100% of the required power to the mine, mill and auxiliary buildings. As a result, power costs are now anticipated to decrease dramatically in the fourth quarter with the decommissioning of diesel power generation units.
  • During the quarter, Del Toro processed 134,474 tonnes of ore through flotation with an average silver grade of 170 g/t. Metallurgical recoveries for silver averaged 68% for a total production of 495,714

silver  ounces  representing  a  decrease  of  32%  compared  to  the  previous  quarter.  The  decrease  in production was primarily due to a 23% reduction in throughput following the Company’s decision to reconfigure the plant to process all ore through flotation. In addition, one ball mill was offline for a period of two weeks in August due to a storm which damaged two of the power generators.

  • As a result of the plant reconfiguration and addition of a regrinding area, silver recoveries increased consistently throughout the quarter, with silver recoveries averaging 64% in July, 66% in August and 71% in September.
  • Underground  development  completed  in  the  quarter  totaled  2,479  metres  compared  with  2,972 metres developed in the previous quarter.
  • Three drill rigs consisting of two underground and one on surface were active in the third quarter at Del Toro.  Total exploration metres drilled in the third quarter amounted to 5,181 metres compared to 1,108 metres drilled in the previous quarter.

At the San Martin Silver Mine: 

  • During the quarter, San Martin set another quarterly production record of 509,046 silver ounces and 1,166 ounces of gold representing an increase of 13% and 24%, respectively, compared to the previous quarter. The increase in silver production was a result of higher silver grades within the La Guitarrona, La Reyna and La Hedionda mining areas.
  • Underground development completed in the third quarter totaled 2,333 metres compared with 2,599 metres of development in the previous quarter.
  • Two underground drill rigs were active within the San Martin property during the quarter. Total metres drilled  in  the  third  quarter  amounted  to  2,968  metres  compared  to  1,377  metres  of  drilling  in  the previous quarter.

At the La Guitarra Silver Mine: 

  • During the quarter, total production consisted of 163,696 silver ounces and 1,236 gold ounces. This represents  a  27%  increase  in  silver  production  over  the  previous  quarter  primarily  due  to  a  21% increase in the silver grade.
  • In September, the newly developed and higher grade Jessica area began production at a rate of 134 tpd for a total of 4,014 tonnes. Mine production within the El Coloso area also delivered 21,156 tonnes during the quarter or 46% of total production. Following the successful advances in mine development, the Company now expects these two high grade areas will supply the processing plant with 100% of the required ore by early 2015.
  • Continued  improvements  in  dilution  and  grade  control  as  well  as  the  advances  in  laboratory procedures have supported the increase of silver grade during the quarter.
  • A total of 1,882 metres of development were completed in the third quarter compared to 1,798 metres of development in the previous quarter.
  • Four drill rigs consisting  of three  underground and one on surface were active in the  third quarter within  the  La  Guitarra  property.  Total  metres  drilled  in  the  quarter  amounted  to  3,281  metres compared to 2,225 metres drilled in the previous quarter.

Outlook: 

To  date,  the  Company  has  produced  a  total  of  8.7  million  ounces  of  silver  (11.0  million  silver  equivalent ounces). After adjusting for the recent quarter, the Company has revised its 2014 annual production guidance to within a range of 11.5 to 11.7 million silver ounces (14.6 to 14.9 silver equivalent ounces).

First Majestic is a mining company focused on silver production in Mexico and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2013, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.