Tuesday, October 20, 2026
MiningNewsTerminal
Tuesday, October 20, 2026 Admin

AG.TO ·

First Majestic Updates Mineral Reserve and Resource Estimates for Year End 2014 and Files Form 40-F Annual Report

Resource Estimates Financials

FIRST MAJESTIC SILVER CORP.

Suite 1805 – 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail: [email protected]

NEWS RELEASE

New York – AG    April 1, 2015 Toronto – FR Frankfurt – FMV Mexico ‐ AG

First Majestic Updates Mineral Reserve and Resource Estimates for Year End 2014 and Files Form 40-F Annual Report

FIRST MAJESTIC SILVER CORP. (the "Company" or “First Majestic”) is pleased to announce its 2014 Mineral Reserve and Resource estimates for its existing mineral property assets in Mexico as of December 31, 2014. Silver metal content in the Proven and Probable Reserve category totaled 101.1 million ounces of silver, down 7% from 108.6 million as of December 31, 2013. Metal prices used to estimate the 2014 Reserve estimates were lowered compared to the prior year to: $20.00/oz of silver, $1,200/oz of gold, $0.95/lb of lead and $1.00/lb of zinc.

The following table shows the total tonnage mined from each of the Company’s five producing properties during 2014, including total ounces of silver and silver equivalent ounces produced from each property and the tonnage mined from delineated reserves and resources at each property.

2014 Production Table 

LA ENCANTADA LA PARRILLA DEL TORO SAN MARTIN LA GUITARRA TOTAL
TONNES OF ORE PROCESSED 721,172 711,915 OZ OF SILVER PRODUCED 3,711,633 2,876,450 OZ OF SILVER EQ. PRODUCED 20,019 1,796,742 FROM OTHER METALS TOTAL OZ OF SILVER EQ. 3,731,652 4,673,192 PRODUCED629,492 363,952 2,690,717 1,833,618 988,066 284,644 3,678,783 2,118,262186,881 2,613,412 636,301 11,748,719 419,777 3,509,248 1,056,078 15,257,967
TONNES MINED FROM 416,591 708,211 608,260 320,812 125,487 2,179,360 RESERVES TONNES MINED FROM 304,582 3,704 21,233 43,140 61,393 434,051 OUTSIDE RESERVES

(1) Silver‐equivalent grade is estimated considering: metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine.

The Company completed over 44,000 metres of diamond drilling at its five operating mines in 2014, representing a  25%  reduction  in  metres  drilled  compared  to  the  prior  year.  For  2015,  First  Majestic  is  planning  to  drill approximately  50,000  metres  to  further  define  known  mineralized  ore  bodies  at  its  operating  mines.  A combination of surface and underground drill rigs will focus on assisting mining activities, definition drilling and to support future updates to the Company’s NI 43‐101 Technical Reports.

Starting  this  year,  First  Majestic  is  reporting  Mineral  Resources  inclusive  of  Mineral  Reserves;  readers  are cautioned of this change since the Company had previously reported Mineral Resources exclusive of Mineral Reserves.

The largest change to Mineral Reserves occurred at La Encantada where the old tailings were downgraded from Proven and Probable Reserves to Inferred Resources after the Company’s decision to suspend the reprocessing of the old tailings due to the low metal price environment. This resulted in a 76% increase in the Reserves silver grade, a 57% decrease in total Reserve tonnes and a 24% decrease in Reserve silver metal content. However, the underground Proven and Probable Mineral Reserves increased by 56% to 3.2 million tonnes containing 28.4 million ounces of silver with average silver grade of 276 g/t.

Silver metal content in the Measured and Indicated Resource category totaled 152.4 million ounces. In addition, the silver metal content in the Inferred Resource totaled 170.4 million ounces, a decrease of 18% compared to the prior year due mainly to the impact of lower metal price assumptions, the adoption of the stricter CIM Definition Standards, and the subtraction of Resources for the Peñasco Quemado and La Frazada projects, which were disposed of during 2014.

The complete 2014 Mineral Reserve and Resource estimates for all metals, tonnage and grades are shown below in the following tables:

PROVEN AND PROBABLE MINERAL RESERVES WITH AN EFFECTIVE DATE OF DECEMBER 31, 2014

Mine CategoryMineral Typek tonnesAg (g/t) Au (g/t)Pb (%)Zn (%) Ag‐Eq (g/t)Ag (k Oz) Ag‐Eq (k Oz)
Proven (UG)Oxides1,084248‐‐‐2488,6398,639
LA ENCANTADA Probable (UG)Oxides2,115291‐‐‐29119,75419,754
Total Proven and Probable (UG)Oxides3,199276‐‐‐27628,39328,393
Proven (UG)Oxides302219‐‐‐2192,1192,119
Probable (UG)Oxides1,0252130.02‐‐2147,0327,061
Total Proven and Probable (UG)Oxides1,3272150.01‐‐2159,1529,181

LA PARRILLA

Proven (UG)Sulphides585201‐1.81.93043,7845,714
Probable (UG)Sulphides1,4731570.041.52.42617,43612,369
Total Proven and Probable (UG)Sulphides2,0571700.031.62.327311,22018,083
Total Proven and Probable (UG)Oxides + Sulphides3,3841870.021.01.425120,37127,264
Proven (UG)Oxides1,0242240.18‐‐2377,3597,790
SAN MARTÍN Probable (UG)Oxides1,8131880.04‐‐19110,96011,107
Total Proven and Probable (UG)Oxides2,8372010.09‐‐20718,31918,897
Proven (UG)Transition5111560.032.02.12312,5603,792
Probable (UG)Transition5891570.062.61.62242,9644,248
Total Proven and Probable (UG)Transition1,1001560.052.31.82275,5238,040

DEL TORO

Proven (UG)Sulphides1,0971480.082.71.82295,2068,063
Probable(UG)Sulphides1,9912180.184.03.934713,93122,218
Total Proven and Probable (UG)Sulphides3,0881930.153.53.230519,13830,281
Total Proven and Probable (UG)Transition + Sulphides4,1871830.123.22.828524,66138,321
Proven (UG)Sulphides911531.84‐‐256446745
LA GUITARRA Probable (UG)Sulphides1,2172281.00‐‐2848,91111,098
Total Proven and Probable (UG)Sulphides1,3082231.06‐‐2829,35811,843
Total Proven and Probable (UG)All mineral types14,9152110.151.11.1260101,102124,718

(1) Mineral Reserves have been classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into National Instrument 43‐101 – Standards of Disclosure for Mineral Projects (“NI 43‐101”).

(2) In all cases, metal prices considered for Mineral Reserves estimates were $20 USD/oz Ag, $1,200 USD/oz Au, $0.95 USD/lb Pb, and $1.00 USD/lb Zn.

(3) The Mineral Reserves information provided above for La Encantada, La Parrilla, Del Toro and San Martín is based on internal estimates prepared as of December 31, 2014. The information provided was reviewed and validated by the Company’s internal Qualified Person, Mr. Ramon Mendoza Reyes, P.Eng., who has the appropriate relevant qualifications, and experience in mining and reserves estimation practices.

(4) Mineral Reserve estimates for La Guitarra are based on the 2015 La Guitarra Silver Mine Technical Report compiled by First Majestic with contribution of Amec Foster Wheeler Americas Ltd.

(5) Silver‐equivalent grade is estimated considering: metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine. Estimation details are listed in each mine section of the 2014 Annual Information Form.

(6) The cut‐off grades and modifying factors used to convert Mineral Reserves from Mineral Resources are different for all mines. The cut‐off grades are listed in each mine section of the 2014 Annual Information Form.

MEASURED AND INDICATED MINERAL RESOURCES WITH AN EFFECTIVE DATE OF DECEMBER 31, 2014

Mine / Project CategoryMineral Typek tonnes Ag (g/t) Au (g/t)Pb (%)Zn (%) Ag‐Eq (g/t)Ag (k Oz) Ag‐Eq (k Oz)
Measured (UG)Oxides1,086283‐‐‐2839,8789,878
LA ENCANTADA Indicated (UG)Oxides2,289321‐‐‐32123,62323,623
Total Measured and Indicated (UG) Oxides3,375309‐‐‐30933,50133,501
Measured (UG)Oxides344255‐‐‐2552,8172,817
Indicated (UG)Oxides953254‐‐‐2557,7747,807
Total Measured and Indicated (UG) Oxides1,298254‐‐‐25510,59110,624

LA PARRILLA

Measured (UG)Sulphides703240‐2.22.13475,4157,845
Indicated (UG)Sulphides1,3101880.051.82.83027,93912,705
Total Measured and Indicated (UG) Sulphides2,0132060.031.92.631813,35520,550
Total Measured and Indicated (UG) Oxides + Sulphides3,3112250.01.21.629323,94631,175
Measured (UG)Oxides1,2402540.26‐‐27310,12810,882
SAN MARTÍN Indicated (UG)Sulphides1,8192200.11‐‐22812,87813,360
Total Measured and Indicated (UG) Oxides + Sulphides3,0592340.17‐‐24623,00624,242
Measured (UG)Transition5381850.042.62.62573,1984,450
Indicated (UG)Transition5491800.062.91.92583,1764,544
Total Measured and Indicated (UG) Transition1,0871820.052.72.22576,3738,994

DEL TORO

Measured (UG)Sulphides1,1501820.083.32.32726,72610,048
Indicated(UG)Sulphides1,7472550.214.64.639414,31522,128
Total Measured and Indicated (UG) Sulphides2,8972260.164.13.734521,04132,176
Total Measured and Indicated (UG) Transition + Sulphides3,9842140.133.73.332127,41441,169
Measured (UG)Sulphides1211702.37‐‐3056601,185
LA GUITARRA Indicated (UG)Sulphides1,0293351.56‐‐42411,07814,029
Total Measured and Indicated (UG) Sulphides1,1503181.65‐‐41211,73815,214
Measured (UG)Oxides2,614221‐‐‐22118,55918,559
Measured (Tailings)Oxides (Tailings)1,40390‐‐‐904,0754,075

LA LUZ

Indicated (UG)Sulphides988321‐‐‐32110,20210,202
Total Measured + IndicatedAll material types5,005204‐‐‐20432,83632,836
Total Measured and IndicatedAll mineral types19,8852380.150.940.92279152,442178,137

INFERRED MINERAL RESOURCES WITH AN EFFECTIVE DATE OF DECEMBER 31, 2014

Mine / Project CategoryMineral Typek tonnesAg (g/t) Au (g/t)Pb (%)Zn (%) Ag‐Eq (g/t)Ag (k Oz) Ag‐Eq (k Oz)
LA ENCANTADA Inferred (UG)Oxides899340‐‐‐3409,8329,832
Inferred (Tailings)Tailings6,026107‐‐‐10720,73120,731
Inferred TotalOxides + Tailings6,926137‐‐‐13730,56230,562
Inferred (UG)Oxides3,422259‐‐‐25928,47728,477
LA PARRILLAInferred (UG)Sulphides5,848190‐2.43.132435,67660,997
Inferred Total (UG)Oxides + Sulphides9,270215‐1.52.030064,15389,475
SAN MARTÍNInferred Total (UG)Oxides5,541216‐‐‐21638,50238,502
Inferred (UG)Transition1,4571860.042.62.22578,69912,031
DEL TOROInferred (UG)Sulphides4,2111760.133.85.329723,82140,156
Inferred Total (UG)Transition + Sulphides5,6691780.113.54.528632,52052,187
LA GUITARRAInferred Total (UG)Sulphides7391971.23‐‐2674,6746,343
Total InferredAll mineral types28,1451880.051.21.6240170,412217,070

(1) Mineral Resources have been classified in accordance with CIM Definition Standards on Mineral Resources and Mineral Reserves, whose definitions are incorporated by reference into NI 43‐101.

(2) In all cases, metal prices considered for Mineral Resource estimates were $22 USD/oz Ag, $1,350 USD/oz Au, $0.95 USD/lb Pb, and $1.00 USD/lb Zn.

(3) The Mineral Resources information provided above for La Encantada, La Parrilla, Del Toro and San Martín is based on internal estimates prepared as of December 31, 2014. The information provided was reviewed and validated by the Company’s internal Qualified Person, Mr. Jesus M. Velador Beltran, Ph.D. Geology, who has the appropriate relevant qualifications, and experience in mining and resource geology.

(4) Mineral Resource estimates for La Guitarra Silver Mine are based on the 2015 Technical Report compiled by First Majestic with contribution of Amec Foster Wheeler Americas Ltd.

(5) Silver‐equivalent grade is estimated considering: metal price assumptions, metallurgical recovery for the corresponding mineral type/mineral process and the metal payable of the corresponding contract of each mine. Estimation details are listed in each mine section of the 2014 Annual Information Form.

(6) The cut‐off grades for Mineral Resources are different for all mines. The cut‐off grades are listed in each mine section of the 2014 Annual Information Form.

(7) Measured and Indicated Mineral Resources are reported inclusive of Mineral Reserves.

(8) The La Luz resource estimates are taken from the Real de Catorce Property Technical Report dated July 25, 2008 and the Real de Catorce Property Technical Report dated July 30, 2007. The Company’s Qualified Persons are working on applying similar economic inputs to the La Luz Silver Project to those applied to the other properties.

PLOMOSAS HISTORICAL ESTIMATES

Project Category Mineral Type k tonnes Ag (g/t) Au (g/t) Pb (%) Zn (%) Ag (k Oz) Ag‐Eq (k Oz)

Not in accordance with PLOMOSAS CIM Standards Sulphides (UG) 896 192 0.8 2.1 3.4 5,500 11,000

(1) Plomosas historical estimates are taken from Grupo Mexico’s estimates prepared in 2001.

(2) Tonnage is expressed in thousands of tonnes, metal content is expressed in thousands of ounces.

(3) The Company’s Qualified Persons have been coordinating the work for the verification of the information supporting the historical estimates at Plomosas. The historical estimates at Plomosas do not conform to NI 43‐101 for reporting purposes; as such, the Company is not treating these historical estimates as current Mineral Reserves or Mineral Resources. Since the historical estimates do not have demonstrated current economic viability, these estimates should not be relied upon until the verification process and due diligence in progress by the Company's Qualified Person is completed.

(4) In order to verify or upgrade the historical estimates, the Company will need to complete a diamond drilling program at the Rosario and San Juan mines. The drilling program is designed to confirm the historical estimates reported by Grupo Mexico and will allow the Company to plan a second exploration program focused on locating extensions of the known mineralization. Other work required to verify the historical estimates as current includes, but it is not limited to: re‐survey of underground workings, re‐survey of available exploration drill‐hole monuments, review of drilling, sampling and assays databases, and the re‐assessment of the estimates following CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines and CIM Definition Standards on Mineral Resources and Mineral Reserves.

The Company also announces that its 2014 audited financial statements have been filed on SEDAR.  In addition, a Form 40‐F report has been filed with the United States Securities and Exchange Commission and is available on EDGAR.  Both documents are also available on the Company’s website at www.firstmajestic.com.

Shareholders may also receive a copy of First Majestic’s audited financial statements, without charge, upon request  to  First  Majestic,  Suite  1805  –  925  West  Georgia  Street  Vancouver,  B.C.,  Canada,  V6C  3L2  or  to [email protected].

Mr. Ramon Mendoza Reyes, Vice President Technical Services for First Majestic, is a "qualified person" as such term is defined under National Instrument 43‐101, and has reviewed and approved the technical information disclosed in this news release.

First Majestic is a mining company focused on silver production in México and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FOR FURTHER INFORMATION contact [email protected], visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.

“signed”

Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD‐LOOKING INFORMATION

This news release includes certain "Forward‐Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and  applicable  Canadian  securities  laws.  When  used  in  this  news  release,  the  words  “anticipate”,  “believe”,  “estimate”,  “expect”,  “target”,  “plan”, “forecast”, “may”, “schedule” and similar words or expressions, identify forward‐looking statements or information. These forward‐looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward‐looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave‐ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of  mineral  exploration  and  development,  including  the  risks  of  obtaining  necessary  licenses,  permits  and  approvals  from  government  authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company’s title to properties; and the factors identified under the caption “Risk Factors” in the Company’s Annual Information Form, under the caption “Risks Relating to First Majestic's Business”.

Investors are cautioned against attributing undue certainty to forward‐looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward‐looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.