Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AFM.V ·

PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C, La Croisette, Grand Baie 30517, Mauritius Alphamin Resources Corp. Continued in the Republic of Mauritius Date of incorporation: 12 August 1981 Corporation number: C125884 C1/GBL

Corporate Updates

NEWS RELEASE

C/o ADANSONIA MANAGEMENT SERVICES LIMITED, Suite 1,

PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C,

La Croisette, Grand Baie 30517, Mauritius

Alphamin Resources Corp.

Continued in the Republic of Mauritius

Date of incorporation: 12 August 1981

Corporation number: C125884 C1/GBL

TSX-V share code: AFM

JSE AltX share code: APH

ISIN: MU0456S00006

ALPHAMIN ANNOUNCES UPDATED MINERAL RESOURCE AND MINERAL RESERVE

ESTIMATES AND LIFE OF MINE SCHEDULE FOR MPAMA NORTH TIN MINE

2 August 2022 – Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX, “Alphamin” or the

“Company”), a producer of 4% of the world’s mined tin 1 from its high -grade operation in the

Democratic Republic of Congo, is pleased to announce updated Mineral Resource and Mineral

Reserve estimates along with an updated life of mine schedule (LoM) for the Mpama North Mine.

HIGHLIGHTS

➢ The updated LoM schedule shows:-

• replacement of contained tin depleted over the past 2.5 years

• contained tin inventory over LoM of 154.5kt at 30 June 2022 (31 Dec 2019:

154.2kt);

➢ The updated Resource shows:-

• 155.7kt (30 June 2019: 199kt) and 41.2kt (30 June 2019: 21.8kt) tin contained

(which includes mineral reserves) at 30 April 2022 in Measured/Indicated and

Inferred Resources, respectively, with an 8.0% and a 65.4% increase in grade ,

respectively.

➢ The updated Reserve shows:-

• 121.4kt tin contained at 30 June 2022 (31 Dec 2019: 133.4kt) in the Proven and

Probable mineral reserve categories with 15.7% increase in grade to 4.64% Sn .

Updated Mpama North Life of Mine Plan

An updated Mineral Resource Estimate (MRE) and Mineral Reserve estimation have been

developed for the Mpama North Mine. These updates replace those announced in the Technical

Report of 22 April 2022 which, for Mpama North, were not updated and remained the same as

1 Data obtained from International Tin Association Tin Industry Review Update 2021

those contained in the Technical Report effective 31 December 2019 . The culmination of these

Resource and Reserve updates is the re-design and scheduling of the Mpama North Mine into an

updated Life of Mine (LoM) schedule. A comparative summary of the previous and updated LoM

schedules is presented in Table 1.

Table 1: Mpama North LoM Schedule Comparison

Description Units 31 December 2019

LoM Schedule

30 June 2022

LoM Schedule

RoM tonnes Mt 3.85 3.23

Grade delivered to process plant % Sn 4.00 4.78

Tin content kt Sn 154.2 154.5

Cut-off grade % Sn 1.60 1.00

*Note: Rounding may result in computational discrepancies

Mining has progressed steadily at Mpama North since the 2019 estimation of the Reserves and

LoM schedule with 990,821 tonnes of ore having been extracted in the 30 months Dec 2019 –

Jun 2022 . A number of operational improvements and changes resulted in actual mine

performance surpassing the 2019 LoM schedule. Run of Mine ( RoM) tonnes mined for the

financial years 2020 and 2021 exceed ed the 2019 LoM schedule by 18.5% and 8.1% ,

respectively.

In addition, the Reserve cut-off grade calculated in the 31 December 2019 LoM schedule of 1.6%

Sn, has at an operational level consistently been reduced due to the improved RoM out put,

optimised mine planning, out-performance versus dilution assumptions, improvements in the

process plant recoveries and an increase in the tin price. These actual results have now been

captured in the updated Reserve cut-off grade and LoM schedule which are declared at 1.0% Sn.

Exploration success in the form of strike extension of the high-grade chute in the Mpama North

deeps target plus the reduced cut-off grade valorises previously excluded lower grade Resource

Blocks, converting them into Reserve blocks, which has further added valuable additions to the

LoM schedule.

The result of these positive factors is that all contained tin depleted since 31 December 2019 has

been replaced in the new LoM schedule . The 154.5kt contained tin in the updated LoM versus

the previous 154.2kt has also been accompanied by a valuable grade increase of 19.6% to 4.78%

Sn from 4.00% Sn previously scheduled.

As with the previous LoM schedule of 31 December 2019, the updated LoM schedule contains a

small portion of Inferred Resources. The Inferred Resource constitutes 18.9% of all RoM tonnes

delivered to the plant. 50% of these planned Inferred Resources are scheduled in the final three

years of mining in the deep portion of the mine and will be the subject of infill Resource drilling to

increase confidence before they are included in any shorter term mine plans or budgets.

The annual contained tin mined target remains ~15,000 tonnes per year which, after expected

processing recoveries of 78%, results in ~12,000 tonnes per year of contained tin in concentrate

production at the Mpama North Mine.

Mpama North Mineral Resource Estimate

The updated Mineral Resource Estimate (MRE) at Mpama North is illustrated in Figure 1. It is

based on new resource exploration drilling on the northern deeps high-grade extensions as well

as partial mine depletions (area shaded grey) since the last estimate effective 30 June 2019.

All resource additions have resulted from the renewed Mpama North Mine resource exploration

drilling commenced in 2021. The drilling targeted and successfully extended the known

dimensions of the highly mineralised linear plunging high-grade chute, returning some of the best

project intercepts to date (see Appendix 2). On-going drilling continues at Mpama North with

mineralisation intercepted outside the mineral resource boundaries declared in this update.

The updated MRE includes 9 NQ size additional core intersections from the recent exploration

drilling at the Mpama North Mine which were completed from August 2021 to March 2022. These

new intersections in addition to the original 122 NQ size and 21 PQ size drillholes completed pre-

mining between July 2012 to November 2015, form the basis for the updated MRE. The updated

MRE and previous MRE for comparison are presented in Table 2.

Figure 1: Updated Mpama North Resource Grade Block model (0.5% Sn cut-off)

Table 2: Bisie Mpama North Mineral Resource at 0.50% Sn Cut-Off Grade (30 June 2022)

Category

Quantity

Mt

Grade

% Sn

Tin Content

kt

06/2019 04/2022 06/2019 04/2022 06/2019 04/2022

Measured 0.33 0.04 4.75 2.16 15.6 0.9

Indicated 3.99 3.09 4.59 5.02 183.4 154.9

Total Measured and Indicated 4.32 3.13 4.61 4.98 199.0 155.7

Total Inferred 0.48 0.55 4.57 7.56 21.8 41.2

Super high

grade resource

additions

Notes:

1. All tabulated data have been rounded and as a result minor computational errors may occur.

2. Mineral Resources which are not Mineral Reserves and have no demonstrated economic viability.

3. Mineral Resources are reported inclusive of Mineral Reserves.

4. Alphamin has an 84.1 percent interest in ABM. The Government of the Democratic Republic of Congo

(GDRC) has a non-dilutive, 5% share in ABM. The Gross Mineral Resource for the Project is reported.

5. The 2022 MRE is effective 30 April 2022 and has been depleted by mining from mine surveys as at 30

April 2022 and an estimate of the extent of artisanal mining to 725 mamsl.

6. The 2019 MRE is effective 30 June 2019 and is depleted by mining from mine surveys as at 30 June

2019 and an estimate of the extent of artisanal mining to 725 mamsl.

Differences between the previous MRE and updated MRE are a decrease in Measured and

Indicated Resources contained tin content of 43.3kt Sn with an increase in grade of 8.0% to 4.98%

Sn. An increase in Inferred Resources contained tin content of 19.4kt and an increase in grade of

65.4% to 7.56% Sn is also observed for Inferred Resources.

In addition to any resource growth in the northern depths high-grade zone, promising additional

resource growth potential is likely at Mpama North Mine in the shallow northern strike extension

as well as in the down -dip eastern dip extension, both of which are currently undergoing

exploration drilling.

The full Mineral Resource c hecklist of assessment and reporting criteria are presented in

Appendix 3. The Mineral Resource estimate has been completed by Mr. J.C. Witley (BSc Hons,

MSc (Eng.)) who is a geologist with 33 years’ experience in base and precious metals exploration

and mining as well as Mineral Resource evaluation and reporting. He is a Principal Resource

Consultant for The MSA Group (an independent consulting company), is registered with the South

African Council for Natural Scientific Professions (SACNASP) and is a Fellow of the Geo logical

Society of South Africa (GSSA). Mr. Witley has the appropriate relevant qualifications and

experience to be considered a “Qualified Person” for the style and type of mineralisation and

activity being undertaken as defined in National Instrument 43 -101 Standards of Disclosure of

Mineral Projects.

Mpama North Mineral Reserve Estimate

An updated Mineral Reserve estimation was completed subsequent to the updated MRE.

Modifying factors in the updated Reserve estimate are largely based on:-

• Actual performance statistics and site-specific experience and reconciliation data to

support revised modifying factors (mining recovery, dilution, pillar loss etc.),

• More detailed geotechnical data from mining allowing the mine to be divided into

geotechnical domains with different stope design parameters per domain,

• Increased mining levels per mining echelon for stoping, resulting in a reduction in the pillar

losses and an increased extraction ratio,

• A r educed cut -off grade based on updated calculations from actual operating costs ,

increased tin prices and the impact from higher processing recoveries, and

• Recent additions to Mineral Resources from 2021/2022 exploration activities.

The updated Reserve estimate and previous estimate for comparison are presented in Table 3.

Table 3: Bisie Mpama North Mineral Reserve at 1.0% Sn Cut-Off Grade (30 June 2022)

Category

Quantity

Mt

Grade

% Sn

Tin Content

kt

2019 2022 2019 2022 2019 2022

Proven Mineral Reserve 0.05 0.00 3.77 1.38 1.9 0.0

Probable Mineral Reserve 3.28 2.62 4.01 4.64 131.5 121.3

Total Proven and Probable Mineral

Reserves 3.33 2.62 4.01 4.64 133.4 121.4

Notes:

1. The Mineral Reserve has been reported in accordance with the requirements and guidelines of NI43 -

101 and are 100% attributable to ABM.

2. Apparent computational errors due to rounding and are not considered significant.

3. The Mineral Reserves are reported with appropriate modifying factors of dilution and recovery.

4. The Mineral Reserves are reported at the head grade and at delivery to Plant.

5. Although stated separately, the Mineral Resources are inclusive of the Mineral Reserves.

6. No Inferred Mineral Resources have been included in the Mineral Reserve estimate.

7. Quantities are reported in metric tonnes.

8. The input studies are to the prescribed level of accuracy.

9. The Mineral Reserve estimates contained herein may be subject to legal, political, environmental or other

risks that could materially affect the potential exploitation of such Mineral Reserves

The Mineral Reserve assessment and reporting criteria are presented in Appendix 4. The Mineral

Reserve estimate has been prepared by Mr. Clive Brown, Pr. Eng., B.Sc. Engineering (Mining),

is a qualified pers on (QP) as defined in National Instrument 43 -101 and has reviewed and

approved the scientific and technical information contained in this news release. He is a Principal

Consultant and Director of Bara Consulting Pty Limited, an independent technical consu ltant to

the Company.

____________________________________________________________________________

FOR MORE INFORMATION, PLEASE CONTACT:

Maritz Smith

CEO

Alphamin Resources Corp.

Tel: +230 269 4166

E-mail: [email protected]

____________________________________________________________________________

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Information in this news release that is not a statement of historical fact constitutes forward -

looking information. Forward -looking statements contained herein include, without limitation,

statements relating to the updated LoM schedule for Mpama North, and planned future

exploration activities and anticipated outcomes. Forward -looking statements are based on

assumptions management believes to be reasonable at the time such statements are made.

There can be no assurance that such statements will prove to be accurate, as actual results and

future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward-looking statements. Although Alphamin has

attempted to identify important fac tors that could cause actual results to differ materially from

those contained in forward-looking statements, there may be other factors that cause results not

to be as anticipated, estimated or intended. Factors that may cause actual results to differ

materially from expected results described in forward -looking statements include, but are not

limited to: uncertainty of future exploration and assay results and consistency with past results

and expectations; ; uncertainties inherent in estimates of Mineral R esources and Mineral

Reserves; global geopolitical and economic uncertainties; volatility of metal prices; uncertainties

with respect to social, community and environmental impacts ; uninterrupted access to required

infrastructure; adverse political events; impacts of the global Covid-19 pandemic as well as those

risk factors set out in the Company’s Management Discussion and Analysis and other disclosure

documents available under the Company’s profile at www.sedar.com. Forward -looking

statements contained herein are made as of the date of this news release and Alphamin disclaims

any obligation to update any forward-looking statements, whether as a result of new information,

future events or results or otherwise, except as required by applicable securities laws.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release.

Appendix 1: SAMPLE PREPARATION, ANALYSES AND QUALITY CONTROL AND QUALITY

ASSURANCE (QAQC)

For sample preparation, analyses and quality control and quality assurance, see the Company’s

news release dated 07 March 2022 entitled “ ALPHAMIN ANNOUNCES MAIDEN MINERAL

RESOURCE ESTIMATE AND POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR

MPAMA SOUTH”

Appendix 2: SIGNIFICANT INTERCEPTS FROM RECENT DRILLING AT MPAMA NORTH.

EARLIER DRILLING INTERCEPTS ARE REPORTED IN THE TECHNICAL REPORT DATED

22 APRIL 2022 FILED ON SEDAR.COM (0.5% Sn lower threshold)

Hole

Easting Northing

RLm Azi (°) Dip (°) From To Sn %

Width Sample Position

GPS GPS (m)1 mid_x mid_y mid_z

MND001 No significant intercepts

MND002 No significant intercepts

MND003 No significant intercepts

MND004 583392 9886283 682 270 -52 524.8 525.1 0.67 0.30 582,994 9,886,250 347.0

MND005 No significant intercepts

MND006 No significant intercepts

MND007 583100 9886210 726 270 -75 402.0 402.5 0.58 0.45 582,987 9,886,211 340.5

MND009 582881 9886200 752 270 -65 96.4 96.8 2.28 0.40 582,842 9,886,200 667.3

MND010 No significant intercepts

MND011 583103 9886211 726 270 -83

419.3 428.0 21.85 8.74 583,021 9,886,194 312.7

430.6 438.9 17.52 8.30 583,018 9,886,193 302.0

MND012 582950 9886140 765 270 -60 64.7 65.4 12.20 0.65 582,916 9,886,142 699.8

MND013 582945 9886142 759 270 -50

142.7 143.0 10.05 0.28 582,852 9,886,146 651.2

177.0 178.0 1.02 1.00 582,829 9,886,146 625.5

MND014 No significant intercepts

MND015a 582950 9886140 755 270 -70 172.3 172.7 6.34 0.36 582,887 9,886,144 594.8

MND016 583063 9886162 741 270 -50 249.4 253.0 0.62 3.58 582,895 9,886,161 554.1

MND017 583195 9886171 744 270 -50 385.0 386.0 1.02 1.00 582,947 9,886,165 450.1

MND018 583063 9886162 740 270 -60 284.7 285.0 11.70 0.30 582,912 9,886,160 498.4

MND019 583196 9886171 744 270 -64

432.2 444.0 25.94 11.76 582,992 9,886,162 357.3

445.0 445.6 15.30 0.55 582,988 9,886,162 351.2

MND020 583196 9886171 744 270 -72

484.9 492.3 7.08 7.36 583,024 9,886,160 288.3

495.0 499.3 7.50 4.25 583,020 9,886,159 280.6

MND021 583195 9886171 744 270 -57 425.3 425.6 10.50 0.30 582,962 9,886,178 388.9

MND022a 583244 9886211 741 270 -73

547.0 558.3 7.62 11.30 583,060 9,886,205 220.5

559.0 565.9 16.37 6.85 583,056 9,886,205 211.4

567.7 569.5 1.31 1.83 583,054 9,886,205 205.7

MND023 583204 9886236 738 270 -75

511.6 524.7 21.27 13.10 583,038 9,886,208 249.3

527.0 528.4 2.35 1.42 583,033 9,886,207 240.8

1. Apparent widths, not true thickness