Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AFM.V ·

PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C, La Croisette, Grand Baie 30517, Mauritius The above media statement and accompanying material for media use are issued by ALPHAMIN RESOURCES CORP. without embargo unless an embargo is indicated above

Corporate Updates

NEWS RELEASE

Suite 1,

PERRIERI OFFICE SUITES, C2-302, Level 3, Office Block C,

La Croisette, Grand Baie 30517, Mauritius

The above media statement and accompanying material for media use are issued by

ALPHAMIN RESOURCES CORP. without embargo unless an embargo is indicated above

ALPHAMIN REPORTS PRODUCTION AND SALES VOLUMES FOR Q3 2020

MAURITIUS – October 14, 2020 – Alphamin Resources Cor p. (AFM:TSXV, APH:JSE AltX,

“Alphamin” or the “Company”) is pleased to provide the following production and sales update

for the quarter ended September 2020 :

 Tin sales up 3% to 2,695 tons versus previous quarter

 Expected EBITDA of US$16 million (previous quarter: US$12.9 million)

 Run-of-mine material processed up 5% versus previous quarter

 Q4 2020 production guidance of 2,600 - 2,800 tons contained tin

Production and Sales Summary for the Quarter ended September 2020 1

Run-of-mine volumes processed increased 5% to 96,086 tons. Underground mining performed

well in delivering increased material for processing. Volumes mined and processed are in line

with our current target of 96,000 tons per quarter. Our average tin grade was 12% lower than

the previous quarter at 3.8% – importantly, the year to date average tin grade is 3.9%, which

is in line with the target of 4.0% for the financial year ending December 2020.

As a result of increased plant recoveries and throughput, the 12% lower tin grades processed

only resulted in a 6% drop in tin production compared to the prior quarter. This is at the lower

end of our previous production guidance range. Tin sales increased 3% to 2,695 tons for the

quarter.

The Bisie tin mine recorded zero lost-time injuries during the past quarter.

_________________________________________________________________________________________

1 Production and financial information are disclosed on a 100% basis. Alphamin indirectly owns 84,14% of its operating

subsidiary to which the information relates.

Description Units

Quarter

ended

September

2020

Quarter

ended June

2020

Variance

Tons Processed Tons 96 086 91 928 5%

Tin Grade Processed % Sn 3.8 4.3 -12%

Overall Plant Recovery % 71 69 3%

Contained Tin Produced Tons 2 563 2 739 -6%

Contained Tin Sold Tons 2 695 2 613 3%

Actual

The above media statement and accompanying material for media use are issued by

ALPHAMIN RESOURCES CORP. without embargo unless an embargo is indicated above

EBITDA guidance for the quarter ended September 2020

Alphamin’s unaudited consolidated financial stateme nts and accompanying Management’s

Discussion and Analysis for the quarter ended Septe mber 2020 are expected to be released

on or about 2 November 2020. The Q3 2020 average tin price achieved was US$17,436/t

against a current tin price of approximately US$18,0 00/t. EBITDA of approximately US$16

million is expected, net of additional provisions r equired for concentrate grade adjustments

based on smelter assays. The smelter assay results received during Q3 related to Q1 and Q2

sales. The independent operators of the mine site laboratory have subsequently changed their

assay method (since late-June 2020) and comparing samples of their Q3 results to a number

of international laboratories, indications are that concentrate assays for this past quarter are

reported accurately.

Production Guidance for the quarter ending December 2020

We expect contained tin production of between 2,600 and 2,800 2 tons for the quarter ending

December 2020.

Covid-19 Pandemic and Impact on Operations:

The health of our employees is of paramount importance and in this regard the Company has

a range of Covid-19 awareness, prevention and other risk mitigation controls in place.

T o date, the Company has been able to continue with normal production and concentrate sales

activities.

Qualified Person

Mr Vaughn Duke Pr.Eng. PMP , MBA, B.Sc. Mining Engineering (Hons.), is a qualified person

(QP) as defined in National Instrument 43-101 and h as reviewed and approved the scientific

and technical information contained in this news release. He is a Principal Consultant, Partner

and Director of Sound Mining Solutions, an independent technical consultant to the Company.

__________________________________________________________________________________________

FOR MORE INFORMATION, PLEASE CONTACT:

Maritz Smith

CEO

Alphamin Resources Corp.

T el: +230 269 4166

E-mail: [email protected]

2 Production guidance is based on certain estimates and assumptions, including but not limited to: quantity of material

processed, tin grades of processed material and processing recoverie s and assumes mining operations will continue to be

conducted in the same manner as the previous quarter and will not be further impacted by the Covid-19 pandemic.

The above media statement and accompanying material for media use are issued by

ALPHAMIN RESOURCES CORP. without embargo unless an embargo is indicated above

USE OF NON-IFRS FINANCIAL PERFORMANCE MEASURES

This news release refers to the following non-IFRS financial performance measure: Earnings

before interest, taxes, depreciation and amortization (“EBITDA”)

This measure is not recognized under IFRS as it doe s not have any standardized meaning

prescribed by IFRS and is therefore unlikely to be comparable to similar measures presented

by other issuers. We use these measures internally to evaluate the underlying operating

performance of the Company for the reporting periods presented. The use of these measures

enables us to assess performance trends and to evaluate the results of the underlying business

of the Company. We understand that certain investors, and others who follow the Company’s

performance, also assess performance in this way.

We believe that these measures reflect our performa nce and are useful indicators of our

expected performance in future periods. This data is intended to provide additional information

and should not be considered in isolation or as a su bstitute for measures of performance

prepared in accordance with IFRS.

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Information in this news release that is not a stat ement of historical fact constitutes forward-

looking information. Forward-looking statements contained herein include, without limitation,

statements relating to anticipated production volumes, anticipated tin grades and processing

recoveries and Q3 EBITDA. Forward-looking statement s are based on assumptions

management believes to be reasonable at the time such statements are made. There can be

no assurance that such statements will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers

should not place undue reliance on forward-looking statements. Although Alphamin has

attempted to identify important factors that could cause actual results to differ materially from

those contained in forward-looking statements, there may be other factors that cause results

not to be as anticipated, estimated or intended. Factors that may cause actual results to differ

materially from expected results described in forward-looking statements include, but are not

limited to: uncertainties associated with Alphamin’s resource and reserve estimates,

uncertainties regarding estimates of the expected m ined tin grades, processing plant

performance and recoveries, discrepencies in concen trade tin grade from smelter assays,

uncertainties regarding global supply and demand fo r tin and market and sales prices,

uncertainties with respect to social, community and environmental impacts, adverse political

events, impacts of the global Covid-19 pandemic on mining operations and commodity prices

as well as those risk factors set out in the Compan y’s Management Discussion and Analysis

and other disclosure documents available under the Company’s profile at www.sedar.com.

Forward-looking statements contained herein are mad e as of the date of this news release

and Alphamin disclaims any obligation to update any forward-looking statements, whether as

a result of new information, future events or result s or otherwise, except as required by

applicable securities laws.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined

in the policies of the TSX Venture Exchange) accept s responsibility for the adequacy or

accuracy of this news release.