Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AFM.V ·

Alphamin Announces Successful Infill Drilling at Mpama South with Increase IN Both Resource Confidence and Mineral Resources

Resource Estimates

ALPHAMIN ANNOUNCES SUCCESSFUL INFILL DRILLING AT MPAMA SOUTH WITH

INCREASE IN BOTH RESOURCE CONFIDENCE AND MINERAL RESOURCES

10 February 2023 – Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX, “Alphamin” or the

“Company”), a producer of 4% of the world’s mined tin1 from its high-grade operation in the

Democratic Republic of Congo, is pleased to announce completion of the infill drilling campaign

at Mpama South and an updated Mineral Resource Estimate (MRE) for Mpama South.

HIGHLIGHTS

 Substantially improved the confidence of Mineral Resources at Mpama South whilst

extending the known mineralisation boundary.

 Increased Indicated Resources by 286% to 3.26Mt based on assays from 63 additional

infill and extensional drillholes.

 Mpama South Mineral Resources now stand at:

 3.26Mt @ 2.46% Sn for 80.2kt contained tin in the Indicated category; and

 2.84Mt @ 2.42% Sn for 68.7kt contained tin in the Inferred category.

 Significant additional resource growth potential at Mpama South as the deposit still

remains open down-dip.

 Mpama South Mine construction works progressing according to plan – project

completion expected to increase Alphamin’s annual contained tin production from the

current 12,000tpa to ~20,000tpa, approximating 6.6% of the world’s mined tin1.

Mpama South Updated Mineral Resource Estimate

In just 24 months, Alphamin has:

 delivered a top-10 globally significant CRIRSCO compliant tin deposit by contained tin 1 at

Mpama South;

 grown the resources to ~2.2 times versus the Maiden Mineral Resources and PEA 2

numbers;

 increased resource confidence across the deposit; and

 commenced mine construction through own cashflows.

This brings forward an additional planned ~7,200tpa contained tin production, which will make

Alphamin one of the largest tin producers globally and delivers on the Company strategy of

organic growth and creating shareholder value.

The updated Mineral Resource for Mpama South follows eight months after the previous update

announced on 31 May 2022. The update is based on receipt of assays for another 63 infill and

extensional drillholes completed subsequent to the previous estimate which was based on 124

1 Based on data obtained from International Tin Association Tin Industry Review 2022

2 See News Announcement 7 March 2022 for Preliminary Economic Assessment and Resources

drillholes. The updated Mineral Resource is presented in Figure 1 along with the direction in which

mineralisation is still open down dip and significant high grade periphery drilling intercepts.

The updated MRE now includes results from 187 drillholes at Mpama South as well as 6 drillholes

drilled in 2015 in the area between Mpama South and the Mpama North ore body. The MRE was

estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Best Practice

Guidelines (2019) and is reported in accordance with the 2014 CIM Definition Standards.

Figure 1: Updated Mpama South Mineral Resource 07 February 2023 with selected

intercepts and direction in which mineralisation is still open

Source: Alphamin 2022

The Mineral Resource is classified into the Indicated and Inferred categories and is reported at a

base case tin cut-off grade of 1.0%, which satisfies reasonable prospects for economic extraction.

Mpama South Indicated Resources increased by ~286% to 3.26Mt by converting Inferred

Resources, while Inferred Resources grew nominally by ~275kt (excluding those tonnes

converted to Indicated). The Mineral Resource Estimate, which is effective as of 07 February

2023, is presented in Table 1 below:

Table 1: Updated Mpama South Mineral Resources effective date 07 February 2023

Classification Tonnes (millions) Sn % Sn Tonnes

(thousands)

Indicated3 3.26 2.46 80.2

Inferred4 2.84 2.42 68.7

Mineral Resources that are not Mineral Reserves do not have a demonstrated economic viability

and require advanced studies and economic analysis to prove their viability for extraction.

Extensional drilling down-dip and in the shallower northern and southern portions of Mpama South

can be conducted at the Company’s election to carry on extending known mineralisation at

Mpama South, which is still open in multiple directions. High grade drillholes around the

peripheries where mineralisation remains open are highlighted in Figure 1, showing the remaining

prospectivity for Resource expansion. However, for 2023, the focus will primarily be aimed at the

Mpama South Mine construction and commissioning efforts, while exploration drilling will be

curtailed, instead, focusing on further field work campaigns to support future programs.

The MRE has been completed by Mr. J.C. Witley (BSc Hons, MSc (Eng.)) who is a geologist with

34 years’ experience in base and precious metals exploration and mining as well as Mineral

Resource evaluation and reporting. He is a Principal Resource Consultant for The MSA Group

(an independent consulting company), is registered with the South African Council for Natural

Scientific Professions (SACNASP) and is a Fellow of the Geological Society of South Africa

(GSSA). Mr. Witley has the appropriate relevant qualifications and experience to be considered

a “Qualified Person” for the style and type of mineralisation and activity being undertaken as

defined in National Instrument 43-101 Standards of Disclosure of Mineral Projects.

Bisie Ridge Regional Exploration Update

Alphamin intensified exploration drilling on the 13km long Bisie Ridge from Q3 2022 to test highly

anomalous soil, geophysical and structural targets identified during 2021. 8,773 metres of the

10,000 metre Phase 1 diamond core programme have been completed along the Ridge, with the

remainder due for completion in Q1 2023.

Although anomalous mineralisation has been confirmed in drilling on the Ridge, it is not of the

obvious coarse visual cassiterite type frequently seen in drillcore from Mpama North and South.

Only ~25% of assays have been returned from the independent laboratory to date from the Ridge

drilling. Assay results when received will support a fuller investigation into the regional setting,

along with data from the on-going geophysical downhole surveys, structural investigations and

3 CIM Definition: An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and

physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors insufficient detail to support mine

planning and evaluation of the economic viability of the deposit.

4 CIM Definition: An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the

basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality

continuity.

mapping, thereby enabling a refocused exploration programme. Until then, the key focus at site

remains the construction and commissioning of the new Mpama South Mine.

Qualified Persons

Mr Jeremy Witley, Pr. Sci. Nat., B.Sc. (Hons.) Mining Geology, M.Sc. (Eng.), is a qualified person

(QP) as defined in National Instrument 43-101 and has reviewed and approved the scientific and

technical information contained in this news release. He is a Principal Mineral Resource

Consultant of The MSA Group (Pty.) Ltd., an independent technical consultant to the Company.

____________________________________________________________________________

FOR MORE INFORMATION, PLEASE CONTACT:

Maritz Smith

CEO

Alphamin Resources Corp.

Tel: +230 269 4166

E-mail: [email protected]

____________________________________________________________________________

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Information in this news release that is not a statement of historical fact constitutes forward-

looking information. Forward-looking statements contained herein include, without limitation,

statements relating to the anticipated future exploration and resource estimation activities and

outcomes and the timing thereof and expected increases in tin production from the development

of the Mpama South deposit and the cost and timing of such development activities. Forward-

looking statements are based on assumptions management believes to be reasonable at the time

such statements are made. There can be no assurance that such statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated in such

statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Although Alphamin has attempted to identify important factors that could cause actual results to

differ materially from those contained in forward-looking statements, there may be other factors

that cause results not to be as anticipated, estimated or intended. Factors that may cause actual

results to differ materially from expected results described in forward-looking statements include,

but are not limited to: uncertainty of future exploration and assay results and consistency with

past results and expectations; uncertainties related to the technical and economic parameters

applied in the Mpama South Preliminary Economic Assessment regarding forecasted tin prices,

the tin grade mined and processing recoveries as well as operating costs; uncertainties inherent

in estimates of Mineral Resources, global geopolitical and economic uncertainties, volatility of

metal prices, uncertainties with respect to social, community and environmental impacts,

uninterrupted access to required infrastructure, adverse political events, impacts of the global

Covid-19 pandemic as well as those risk factors set out in the Company’s Management

Discussion and Analysis and other disclosure documents available under the Company’s profile

at www.sedar.com. Forward-looking statements contained herein are made as of the date of this

news release and Alphamin disclaims any obligation to update any forward-looking statements,

whether as a result of new information, future events or results or otherwise, except as required

by applicable securities laws.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release.

Appendix 1: SAMPLE PREPARATION, ANALYSES AND QUALITY CONTROL AND QUALITY

ASSURANCE (QAQC)

For sample preparation, analyses and quality control and quality assurance, see the Company’s

news release dated 07 March 2022 entitled “ALPHAMIN ANNOUNCES MAIDEN MINERAL

RESOURCE ESTIMATE AND POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR

MPAMA SOUTH”

Appendix 2: SIGNIFICANT INTERCEPTS (0.5% Sn lower threshold)

Hole Easting Northing RLm Azi (°) Dip (°) From To Sn % Width Sample Position

GPS GPS (m)1 mid_x mid_y mid_z

BGH017 582535 9884822 732 55 -10 237.8 238.8 4.99 1.00 582,732 9,884,966 678.6

BGH018 582535 9884822 732 93 0 141.2 144.4 2.07 3.15 582,691 9,884,820 727.9

145.8 151.0 0.76 5.25 582,696 9,884,820 727.9

BGH019 582535 9884822 732 85 -5 147.0 152.0 2.05 5.00 582,696 9,884,837 715.8

BGH020 582535 9884822 732 84 -15 160.6 164.4 1.45 3.80 582,704 9,884,846 689.3

169.3 171.1 5.42 1.80 582,711 9,884,846 687.7

BGH021 582535 9884822 732 93 -15 109.2 110.3 3.20 1.10 582,654 9,884,821 700.1

164.6 167.3 3.29 2.72 582,708 9,884,818 687.6

BGH022 582554 9884785 732 90 0

75.0 80.5 3.99 5.53 582,633 9,884,784 729.3

109.0 110.0 1.35 1.00 582,664 9,884,785 729.9

119.2 122.1 2.22 2.88 582,676 9,884,785 730.1

BGH023 582535 9884822 732 75 -15 171.4 174.3 1.72 2.89 582,710 9,884,859 683.7

175.9 178.0 1.09 2.15 582,714 9,884,860 683.0

BGH024 582554 9884785 732 103 -5 127.7 129.6 0.54 1.90 582,679 9,884,749 717.2

138.0 142.0 1.13 4.05 582,690 9,884,746 716.2

BGH025 582535 9884822 732 55 -20

212.3 213.4 0.60 1.15 582,724 9,884,919 662.3

218.0 221.5 2.29 3.45 582,731 9,884,921 660.7

222.7 223.7 13.05 1.00 582,734 9,884,923 659.9

228.0 234.8 2.73 6.80 582,741 9,884,926 658.0

BGH026 582554 9884785 732 113 -10

103.7 108.0 3.30 4.29 582,649 9,884,735 713.7

134.8 136.5 3.72 1.65 582,676 9,884,722 708.6

161.0 162.5 5.61 1.50 582,699 9,884,711 704.5

BGH030 582554 9884785 732 115 -20

110.0 111.4 7.24 1.40 582,655 9,884,753 692.2

141.9 152.5 4.85 10.60 582,686 9,884,745 680.0

158.0 161.2 3.61 3.20 582,699 9,884,742 675.3

174.5 175.8 11.03 1.35 582,713 9,884,738 670.5

BGH032 582554 9884785 732 125 -20

177.0 178.7 1.70 1.72 582,692 9,884,684 671.3

182.0 188.3 3.00 6.25 582,697 9,884,679 669.1

190.3 193.0 0.95 2.75 582,702 9,884,676 667.2

194.4 202.0 1.37 7.60 582,707 9,884,672 665.3

203.5 208.0 2.67 4.50 582,713 9,884,668 663.2

BGH034 582554 9884785 732 115 -25

174.8 178.0 11.99 3.20 582,689 9,884,696 653.3

195.7 200.0 1.21 4.30 582,706 9,884,686 644.8

202.4 206.7 1.86 4.28 582,711 9,884,683 642.3

208.0 213.3 1.40 5.30 582,716 9,884,680 640.1

216.3 221.3 1.42 5.05 582,722 9,884,676 637.3

225.7 231.0 0.70 5.35 582,730 9,884,671 634.0

BGH027 582544 9884822 732 68 -27

212.4 214.0 0.58 1.65 582,729 9,884,879 634.0

226.0 229.3 1.32 3.30 582,741 9,884,883 628.4

235.5 236.6 1.54 1.13 582,749 9,884,885 625.2

BGH028 582554 9884785 732 90 -10

125.0 126.0 1.72 1.00 582,676 9,884,772 700.9

136.1 137.2 1.85 1.08 582,687 9,884,770 698.4

140.3 142.0 1.03 1.72 582,691 9,884,770 697.4

147.5 151.3 2.88 3.79 582,699 9,884,769 695.5

BGH029 582544 9884822 732 93 -25

126.0 128.4 4.66 2.35 582,663 9,884,826 678.5

178.9 184.1 1.25 5.15 582,713 9,884,827 657.7

193.7 196.1 3.95 2.35 582,726 9,884,827 653.0

BGH031 582544 9884822 732 75 -25 208.0 211.5 0.99 3.53 582,729 9,884,876 639.9

219.4 222.4 1.16 2.98 582,739 9,884,879 636.0

BGH033 582544 9884822 732 60 -27 259.0 265.5 7.32 6.46 582,756 9,884,929 612.8

268.5 270.5 1.02 1.99 582,762 9,884,931 610.0

BGH035 582554 9884785 732 90 -25

152.0 165.0 2.96 13.00 582,686 9,884,816 665.0

171.0 173.6 1.47 2.60 582,703 9,884,815 657.4

176.6 180.1 2.40 3.48 582,709 9,884,814 654.9

BGH036 582544 9884822 732 65 0 147.5 151.4 2.31 3.90 582,687 9,884,878 724.8

156.6 160.7 0.93 4.02 582,696 9,884,881 724.7

BGH037 582554 9884785 732 105 -30

154.0 157.0 3.81 3.00 582,680 9,884,741 647.5

194.6 197.6 1.54 2.95 582,712 9,884,730 626.0

208.0 211.2 1.29 3.23 582,723 9,884,726 619.3

216.3 220.2 2.79 3.90 582,730 9,884,723 615.1

222.4 226.7 1.77 4.30 582,735 9,884,721 612.1

BGH038 582544 9884822 732 75 -30

151.7 154.6 5.22 2.90 582,677 9,884,851 654.3

218.3 223.7 3.38 5.35 582,735 9,884,861 621.4

226.7 231.5 1.95 4.80 582,743 9,884,862 617.6

BGH039 582554 9884785 732 100 -22

112.1 113.0 2.12 0.92 582,665 9,884,755 687.6

116.3 121.0 3.33 4.65 582,661 9,884,753 686.1

145.0 166.0 2.20 21.00 582,696 9,884,744 674.2

174.5 176.0 0.95 1.50 582,713 9,884,739 668.9

BGH040 582544 9884822 732 60 -30 232.0 233.0 0.95 1.00 582,725 9,884,922 618.2

273.7 277.1 3.79 3.35 582,761 9,884,937 600.0

BGH041 582500 9884847 732 55 -25 340.0 344.5 3.03 4.50 582,807 9,885,002 599.5

BGH042 582544 9884822 732 60 -35

277.4 280.0 1.93 2.65 582,751 9,884,922 569.4

308.5 312.0 0.62 3.50 582,776 9,884,932 552.6

313.0 315.6 1.52 2.55 582,779 9,884,933 550.5

BGH043 582544 9884822 732 100 -10

102.5 104.2 2.69 1.65 582,644 9,884,808 709.0

123.0 124.0 1.06 1.00 582,663 9,884,805 704.8

163.6 167.0 2.82 3.36 582,704 9,884,798 696.7

BGH044 582500 9884847 710 70 -35 330.0 334.1 1.31 4.13 582,764 9,884,941 533.4

BGH045 582544 9884822 732 100 -20

120.7 121.8 31.55 1.10 582,656 9,884,806 687.4

156.0 159.4 0.56 3.40 582,689 9,884,799 674.7

176.7 183.6 3.24 6.92 582,708 9,884,795 668.1

BGH046 582544 9884822 732 100 -30

195.2 206.0 2.85 10.82 582,712 9,884,795 630.5

212.5 215.2 1.90 2.65 582,723 9,884,793 623.7

218.0 220.6 7.16 2.60 582,728 9,884,792 620.8

225.0 226.0 4.36 1.00 582,733 9,884,791 617.7

BGH047 582565 9884535 718 60 0 121.6 124.6 0.91 2.99 582,653 9,884,879 739.2

147.1 148.1 1.28 1.00 582,675 9,884,889 741.1

BGH048 582567 9884509 727 90 0 140.8 143.1 0.90 2.30 582,708 9,884,496 727.7

146.5 148.0 0.74 1.47 582,713 9,884,495 728.0

BGH049 582565 9884535 718 65 -15 145.4 147.4 4.27 2.00 582,689 9,884,599 674.5

BGH050 582567 9884509 727 105 -5 160.0 161.4 1.06 1.38 582,722 9,884,469 711.7

BGH051 582565 9884535 718 40 0

134.8 137.0 2.23 2.20 582,662 9,884,630 712.3

151.0 156.3 1.20 5.30 582,675 9,884,642 711.4

164.2 169.5 3.95 5.27 582,685 9,884,651 710.8

171.3 172.6 4.08 1.30 582,688 9,884,655 710.6

BGH052 582567 9884509 727 120 0 205.9 207.1 1.86 1.20 582,732 9,884,385 722.9

BGH053 582565 9884535 718 40 -15

173.7 176.9 9.58 3.20 582,685 9,884,653 669.2

178.6 181.4 4.07 2.88 582,688 9,884,656 667.9

192.4 196.9 3.28 4.45 582,698 9,884,666 664.0

198.9 206.8 2.45 7.91 582,704 9,884,671 661.8

207.5 209.5 5.04 1.97 582,708 9,884,675 660.3

214.7 216.0 2.32 1.35 582,713 9,884,680 658.6

BGH054 No significant intercepts

BGH055 582565 9884535 718 80 -15 145.0 146.0 0.62 1.00 582,705 9,884,549 682.7

BGH056 No significant intercepts

BGH057 No significant intercepts

BGH058 582565 9884510 727 95 -5 153.4 155.6 1.98 2.25 582,717 9,884,501 703.9

BGH059 582567 9884536 718 95 0 165.0 166.0 3.63 1.00 582,732 9,884,528 714.4

BGH060 No significant intercepts

BGH061 582567 9884536 727 130 -10 157.6 159.2 1.22 1.62 582,719 9,884,525 677.7

BGH062 582567 9884537 718 95 -15 154.0 156.0 2.18 2.00 582,695 9,884,589 650.2

BGH063 582782 9884646 829 270 -70

186.3 194.4 0.82 8.12 582,719 9,884,661 650.5

197.4 202.5 1.12 5.03 582,715 9,884,661 641.8

205.0 209.1 0.83 4.05 582,712 9,884,661 635.4

211.1 218.9 2.06 7.77 582,709 9,884,661 628.3

220.4 222.6 0.86 2.15 582,706 9,884,661 622.5

231.0 233.0 0.87 2.00 582,701 9,884,661 613.0

BGH064 582888 9884976 839 270 -50 220.8 222.6 0.63 1.80 582,746 9,884,976 668.9

BGH065 582913 9885057 819 270 -60 271.0 276.0 2.93 4.95 582,769 9,885,057 586.1

291.6 292.6 1.70 1.00 582,759 9,885,057 570.9

BGH066 582888 9884976 839 270 -60 276.0 278.6 8.49 2.59 582,754 9,884,965 596.1

300.0 301.0 1.78 1.00 582,742 9,884,965 576.6

BGH067 582913 9885057 819 270 -67

295.8 300.5 3.21 4.72 582,789 9,885,065 548.1

303.0 304.6 1.56 1.62 582,786 9,885,065 543.1

337.0 338.0 0.55 1.00 582,769 9,885,068 514.3