Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AEMC.V ·

Millrock Partner Sojourn Reports ROCK Sampling Results from Willoughby Project, Golden Triangle District, British Columbia

Drill Results Exploration Programs Sampling & Geoscience Results

MILLROCK RESOURCES INC. | Suite 2300 – 1177 West Hastings St. | Vancouver, BC V6E 2K3

Tel: 604 638 3164 | Fax: 907 677 3599 | www.millrockresources.com

NR: 17-24

MILLROCK PARTNER SOJOURN REPORTS ROCK

SAMPLING RESULTS FROM WILLOUGHBY PROJECT,

GOLDEN TRIANGLE DISTRICT, BRITISH COLUMBIA

VANCOUVER, BRITISH COLUMBIA, November 27, 2017 - Millrock Resources Inc. (TSX-V:

MRO, OTCQX: MLRKF) ("Millrock") is pleased to announce that sampling results have been

reported by partner Sojourn Exploration Inc., (TSX-V:SOJ) (“Sojourn”). Sojourn indicates in their

press release that it has discovered important new zones of mineralization at the Willoughby

Project, located in the Golden Triangle district of British Columbia, during the Company’s recent

surface prospecting program. The new zones of bedrock mineralization are located in some of

the freshly exposed bedrock revealed by recent retreat of glaciers and snowfields.

Sojourn reports that of the 60 bedrock and float random grab samples collected across the

Willoughby property, 16 returned values in excess of 1 gram per tonne (g/t) gold, three of which

returned values in excess of 5 g/t with a maximum value of 8.15 g/t. A shallowly west dipping,

one-meter thick quartz sulfosalt shear vein was discovered and mapped over a 250-meter strike

length. The vein lies below the historic Main Zone drill collars roughly parallel to the Main Zone.

One-meter chip samples across the vein returned values of:

• 3.88 g/t Au and 2.42 g/t Ag;

• 1.93 g/t Au and 4.81 g/t Ag;

• 2.76 g/t Au and 92.1 g/t Ag;

• 1.87 g/t Au and 2.13 g/t Ag; and

• 0.56 g/t Au and 1.24 g/t Ag.

A grab sample of locally derived sulfide talus down slope from the exposure returned 6.18 g/t Au

and 206 g/t Ag. The shear vein pinches out to the south and is open to the north underneath the

North Willoughby Icefall.

Sojourn also noted that there are indications of possible massive sulfide mineralization within

limestone located in the northern section of the claim block. A talus grab sample of very angular,

locally derived gossanous vuggy limestone returned a result of 17.25% zinc. This sample was

collected from rubble crop on a ridge above the glaciers and very close to the summit. It is

coincident with a significant color anomaly around the summit. Investors are cautioned that this

sample is a selective sample and is not necessarily representative of the mineralization hosted

on the property.

MILLROCK RESOURCES INC. | Suite 2300 – 1177 West Hastings St. | Vancouver, BC V6E 2K3

Tel: 604 638 3164 | Fax: 907 677 3599 | www.millrockresources.com

Millrock Reports Rock Sampling Results,

Willoughby Project, BC

Page 2

Sojourn is earning a 100% interest in the Willoughby property from Millrock by making share

issuances totaling 1,840,000 common shares and completing $2,000,000 in exploration over the

next three years. Millrock holds a production royalty and certain milestone payments may be

payable to a third party that vended the Willoughby claim to Millrock. Millrock managed the

recent exploration program on behalf of Sojourn.

Quality Control – Quality Assurance

Millrock adheres to stringent Quality Assurance – Quality Control (QA/QC) standards. All

samples were sent to the ALS Minerals Ltd. prep lab in Terrace, British Columbia for

subsequent shipment and analysis at the ALS Minerals Ltd. North Vancouver, BC laboratory, a

17025:2005 certified facility. All samples were collected by Alaska Earth Sciences personnel

under contract to Millrock and securely stored until delivery to ALS Minerals Terrace. At this

early stage of exploration, Millrock and Sojourn is relying on the certified standards utilized by

ALS Minerals as part of it analysis protocols. No QA/QC anomalies were noted in the analyses.

All results from blanks, standards and duplicates were reviewed and found to be accurate within

acceptable tolerances for results obtained to date.

The scientific and technical information disclosed within this document has been reviewed and

approved by Gregory A. Beischer, President, CEO and a director of Millrock Resources. Mr.

Beischer is a Qualified Person as defined in NI 43-101.

About Millrock Resources Inc.

Millrock Resources Inc. is a premier project generator to the mining industry. Millrock identifies,

packages and operates large-scale projects for joint venture, thereby exposing its shareholders

to the benefits of mineral discovery without the usual financial risk taken on by most exploration

companies. The company is active in Alaska, British Columbia, the southwest USA and Sonora

State, Mexico. Funding for drilling at Millrock’s exploration projects is primarily provided by its

joint venture partners. Business partners of Millrock have included some of the leading names in

the mining industry: Centerra Gold, First Quantum, Teck, Kinross, Vale, Inmet, Altius, and

Riverside. Millrock is a major shareholder of junior explorers PolarX Limited. and Sojourn

Exploration Inc.

ON BEHALF OF THE BOARD

“Gregory Beischer”

Gregory Beischer, President & CEO

MILLROCK RESOURCES INC. | Suite 2300 – 1177 West Hastings St. | Vancouver, BC V6E 2K3

Tel: 604 638 3164 | Fax: 907 677 3599 | www.millrockresources.com

Millrock Reports Rock Sampling Results,

Willoughby Project, BC

Page 3

FOR FURTHER INFORMATION, PLEASE CONTACT:

Melanee Henderson, Investor Relations

(604) 638-3164

(877) 217-8978 (toll-free)

Some statements in this news release contain forward-looking information. These statements

address future events and conditions and, as such, involve known and unknown risks,

uncertainties and other factors which may cause the actual results, performance or

achievements to be materially different from any future results, performance or achievements

expressed or implied by the statements. Such factors include without limitation the completion of

planned expenditures, the ability to complete exploration programs on schedule and the

success of exploration programs.