Allied Critical Metals Drills 10.0 Metres of 1.11% Tungsten (WO3) at Borralha
Allied Critical Metals Drills 10.0 Metres of
1.11% Tungsten (WO3) at Borralha
Substantial Assays Strengthen Shallow Central-South
Mineralization and Support Robust Outlook for Upcoming
Preliminary Economic Assessment
Vancouver, British Columbia--(Newsfile Corp. - October 22, 2025) - Allied Critical Metals Inc. (CSE:
ACM) (OTCQB: ACMIF) (FSE: 0VJ0) ("Allied" or the "Company"), which is focused on its 100% owned
past producing Borralha and Vila Verde tungsten projects in northern Portugal, is pleased to announce
new assay results from its ongoing Reverse Circulation ("RC") drill program at the 100%-owned
Borralha Tungsten Project
in northern Portugal.
The latest results include one of the longer and highest-grade intervals drilled to date at Borralha's Santa
Helena Breccia ("SHB"), further confirming the continuity of high-grade mineralization within the
backbone of the deposit.
Borralha is delivering stronger, wider, and higher-grade intercepts than expected, positioning Allied to
unlock significant resource growth and advance one of the most strategic tungsten projects in the
Western world. Tungsten price reached a high of USD $670/MTU, up approximately 50% in last 6
months as demand for the critical mineral increases with further supply chain restrictions from non-
Western countries.
Highlights:
Bo_RC_16
:
90.0 m @
0.24% WO
from 60.0 m, including:
40.0 m @
0.40% WO
from 100.0 m
10.0 m @
1.11% WO
from 100.0 m, including 6.0 m @
1.78% WO
Additional 12.0 m @
0.33% Cu
, 25 g/t Ag, and 138 ppm Mo from 188.0 m
Bo_RC_18
:
74.0 m @
0.12% WO
from 154.0 m, including:
14.0 m @
0.15% WO
from 192.0 m
2.0 m @
0.35% WO
from 226.0 m
Bo_RC_19
:
4.0 m @
0.19% WO
from 124.0 m
Geological Context
Bo_RC_16
was drilled at the western dip edge of the central-south backbone of the current Mineral
Resource Estimate ("MRE"). The objective was to strengthen resource resolution for the forthcoming
Preliminary Economic Assessment ("PEA") in an area where higher-grade mineralization was
previously interpreted to taper off. Instead, the hole returned higher and more consistent grades than
anticipated, significantly widening the central-south mineralization and delivering one of the highest metal
factor intercepts ever recorded at Borralha's SHB.
Bo_RC_18
and
Bo_RC_19
targeted the transition "gap" central zone between the central-south high-
grade backbone and the recently discovered north-dipping large medium-grade lode, an area
historically interpreted as lower grade. Results exceeded current MRE expectations, returning grades
above the deposit average and strengthening the geological bridge between two high-grade domains.
This continuity is expected to be an important factor in resource growth and future mine design.
Roy Bonnell, CEO and Director of Allied, commented:
"Borralha continues to surprise us on the
upside, Bo_RC_16 has delivered one of the strongest intercepts ever drilled on the project,
expanding the high-grade central-south mineralization. Meanwhile, Bo_RC_18 and Bo_RC_19 has
successfully demonstrated mineralization continuity in what was considered a weaker zone. Together,
these results confirm both scale and grade potential as we advance towards our updated MRE and
PEA."
Drill Program Progress
To date, 4,210 metres of drilling have been completed from the initially planned 5,625-metre Phase 1
campaign. The program focus was:
Expanding and upgrading the current NI 43-101 Mineral Resource Estimate (MRE), expected in
Q4 2025
.
The development of a robust
Preliminary Economic Assessment (PEA)
.
Supporting underground mine design and integration with ongoing EIA review.
Further assay results are expected in the coming weeks as drilling advances towards completion.
Table 1 - Drill hole Collar Locations and Status
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11632/271390_allied-table1.jpg
Table 2 - Current Campaign Interval Highlights Update
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11632/271390_allied-table2.jpg
Next Steps
Phase 1 drilling campaign is just finished, with further results expected in the coming weeks. Step-out
holes targeted both western and northern extensions of SHB, while infill drilling will refine the core
resource model. Results will continue to inform the MRE and subsequent economic studies.
Figure 1 -
Drill collar plan showing planned holes for the completed 4,210 m RC campaign at the
Borralha Project. The red outline delineates the main mineralized breccia zone.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11632/271390_c1053da82407c970_003full.jpg
Figure 2 -
Geological Cross-Section for hole Bo_RC_16/25.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11632/271390_c1053da82407c970_004full.jpg
Sampling, QA/QC and Analytical Notes
Drilling was completed using reverse-circulation (RC). All sample bags were pre-labelled with a unique
internal sequence number used consistently for the assay sample and corresponding reject. Sampling
was conducted on 2.0 m intervals for analytics. For each 2.0 m interval, two 1.0 m reject samples were
also collected as representative splits. Splitting was performed at the rig via a rotary splitter integral to
the RC cyclone.
Sampling followed pre-prepared sample lists that recorded downhole metreage, sequence, and the
placement of Certified Reference Materials (CRMs) and field duplicates. CRMs were inserted at a rate
of 1 in 20 samples (5%) and field duplicates at 1 in 20 samples (5%), arranged so that every 10th
sample alternated between a CRM and a duplicate.
Analytical and reject samples were boxed at the drill site and transported by company personnel to the
project core/logging facility. Analytical samples were stored on labelled pallets pending direct shipment
to ALS's preparation laboratory in Seville, Spain. Pulps and rejects were subsequently stored securely in
the project logging room.
At ALS Seville, samples were crushed to 70% passing 2 mm, riffle-split to ~250 g, and pulverized using
hardened steel to 85% passing 75 μm. Pulps were shipped to ALS Loughrea (Ireland) for analysis. The
primary analytical method was ME-MS81 (lithium borate fusion with ICP-MS finish). Base metals were
also reported using ME-4ACD81 (four-acid digestion with ICP-MS finish). Over-limit tungsten results
were re-assayed using W-XRF15b (lithium borate fusion with XRF). Analytical results were delivered
directly by ALS to the Company via secure electronic transfer.
Primary disclosure remains the reported grade and interval length (and true width where known).
To the best of the Company's knowledge, no drilling, sampling, recovery, or other factors have been
identified that would materially affect the accuracy or reliability of the data referenced herein.
Qualified Person
The scientific and technical information in this release has been reviewed and approved by Mr. Vítor
Arezes, BSc, MIMMM (QMR), Vice-President Exploration of Allied Critical Metals, a Qualified Person
under National Instrument43-101. Mr. Arezes is not independent of Allied Critical Metals Inc. as he is an
officer of the Company.
About the Borralha Tungsten Project
Allied's Borralha Tungsten Project is one of the largest and most historically significant past-producing
tungsten operations in Western Europe. Located in northern Portugal, Borralha was once the second-
largest tungsten mine in the country and supplied strategic materials to European and Allied industries
during the 20th century, including both World Wars and the Cold War period.
Today, the project is undergoing a modern revitalization based on a combination of scale, grade,
metallurgy, and jurisdictional strength. Mineralization is dominated by coarse-grained wolframite, which
is highly desirable in global markets due to its favorable processing characteristics and higher
recoveries compared to scheelite-bearing deposits.
Borralha benefits from existing infrastructure, shallow mineralization, and a simple processing route,
making it one of the most advanced tungsten development projects in the European Union. These
attributes are particularly important in the context of the EU Critical Raw Materials Act (2024/1252) and
NATO strategic autonomy initiatives, both of which explicitly identify tungsten as a defense-critical raw
material subject to severe supply risk.
With the EU currently dependent on over 80% of its tungsten imports from China, Borralha represents a
rare and strategic opportunity to develop a secure, domestic, and NATO-aligned supply source. As
Allied continues to advance drilling, resource expansion, and economic studies, Borralha is poised to
play a central role in reshaping Europe's tungsten landscape-supporting both decarbonization
technologies and defense-industrial resilience.
ON BEHALF OF THE BOARD OF DIRECTORS,
"Roy Bonnell"
Roy Bonnell
CEO and Director
For further information or investor relations inquiries, please contact:
Dave Burwell
Vice President, Corporate Development
Email:
Tel: 403-410-7907
Toll Free: 1-888-221-0915
Please visit our website at
www.alliedcritical.com
.
Also visit us at:
LinkedIn:
https://www.linkedin.com/company/allied-critical-metals-inc
X:
https://x.com/@alliedcritical/
Instagram:
https://www.instagram.com/alliedcriticalmetals/
The Canadian Stock Exchange does not accept responsibility for the adequacy or accuracy of
this release.
Cautionary Statement Regarding Forward-Looking Information
This news release contains "forward-looking statements", including with respect to the use of proceeds.
Wherever possible, words such as "may", "would", "could", "should", "will", "anticipate", "believe", "plan",
"expect", "intend", "estimate", "potential for" and similar expressions have been used to identify these
forward-looking statements. These forward-looking statements reflect the current expectations of the
Company's management for future growth, results of operations, performance and business prospects
and opportunities and involve significant known and unknown risks, uncertainties and assumptions,
including, without limitation, those listed in the Company's Listing Statement and other filings made by
the Company with the Canadian securities regulatory authorities (which may be viewed under the
Company's profile at
www.sedarplus.ca
). Examples of forward-looking statements in this news release
include, but are not limited to, statements regarding the proposed timeline and use of proceeds for
exploration and development of the Company's mineral projects as described in the Company's Listing
Statement, news releases, and corporate presentations. Should one or more of these risks or
uncertainties materialize or should assumptions underlying the forward-looking statements prove
incorrect, actual results, performance or achievements may vary materially from those expressed or
implied by the forward-looking statements contained in this news release. These factors should be
considered carefully, and prospective investors should not place undue reliance on the forward-looking
statements. This list is not exhaustive of the factors that may affect any of the Company's forward-looking
statements and reference should also be made to the Company's Listing Statement dated April 23,
2025 and news release dated May 16, 2025, and the documents incorporated by reference therein, filed
under its SEDAR+ profile at
www.sedarplus.ca
for a description of additional risk factors. The
Company disclaims any intention or obligation to revise forward-looking statements whether as a result
of new information, future developments or otherwise, except as required by law.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/271390